esbn presentation to the igg
play

ESBN Presentation to the IGG Market Releases and Sundry Items - PowerPoint PPT Presentation

ESBN Presentation to the IGG Market Releases and Sundry Items Theresa ONeill 13 th May 2015 Vulnerable Customers We have gotten a lot of feedback from Suppliers , updates have been made , Thank You ESBN would like to run the final


  1. ESBN Presentation to the IGG Market Releases and Sundry Items Theresa O’Neill 13 th May 2015

  2. Vulnerable Customers • We have gotten a lot of feedback from Suppliers , updates have been made , Thank You • ESBN would like to run the final report to send to Suppliers to confirm all changes that are needed have been made. We are proposing to run this by Thursday 28th May, 2015. Suppliers would have to send in their details to ESBN that day too , and for this we’ll be in touch next week. • To do this, could Suppliers today confirm that all your changes are now, or will have been , submitted by the end of next week viz Friday 22 May, 2015 2 esbnetworks.ie

  3. Update - 2 Reads sent in one message to suppliers • This problem concerns cases where two meter readings for the one MPRN have come into ESBN from a Customer via the IVR at different times and, because of a code defect ,they both appear on a single 300-series Market Message even though there are different read dates for each reading and both reads are for the same register. • Therefore these market messages are incorrectly populated. One Supplier reported that they are unable to process these market messages. • And separately, as well as the code correction, we are doing some re-training When all is finished, this will prevent future cases arising. However please note that where there are reversals of historical messages then the reversal and rebilling messages will show the original 2 readings. We are planning for a Go-Live on Wednesday 27 May 2015 � No Outage will be needed, the changes can go live during a working day � 3 esbnetworks.ie

  4. Market Release 2015 Version Schema or MCR Timeline Clarification And, Non-schema MCR1136 Non- With Tibco N/A The 131MM will be available on 2.0 the Extranet in the same timeline 131 MM to be added to Schema as the Tibco Upgrade Messages Tab on Extranet MCR1151 Non- With Tibco N/A The Meter Multiplier and Meter 2.0 Category code will be in the Add the Meter Multiplier Schema scheduled Downloadable files and Meter Category code after the Tibco Upgrade ie. to Downloadable Files December The Automated Debt Flagging MCR1111 Schema With Tibco IGG 3.0 Solution will be enabled in the Automated Debt Flagging 10th April 2013 same timeline as the Tibco Solution Ver 11.00.00 Upgrade MCR1122 Schema With Tibco IGG The Essential Plant Flag will be in 3.0 the next scheduled Downloadable Introduction of Flag into 10th April 2013 files after the Tibco Upgrade ie. the Market Design to Ver 11.00.00 December identify Sites with See Next 3 Slides for an Essential Plant (EP) indication of the location of the EP flag on three Extranet tabs 4 esbnetworks.ie

  5. Extranet – Essential Plant Flag MCR1122 - MPRN Enquiry tab MPRN Enquiry tab In the section Meter Point Status , a new field 'Essential Plant‘ will be added under the field Trading Site Flag. This new field will either be blank or populated with YES. 5 esbnetworks.ie

  6. Extranet – Essential Plant Flag MCR1122 – TMPRN Technical Unmetered MPRN (TMPRN) : MPRN Enquiry tab In the section under TMPRN Status , a new field 'Essential Plant‘ will be added under the field ‘Meter Point Status’. This new field will either be blank or populated with YES . 6 esbnetworks.ie

  7. Extranet – Essential Plant Flag MCR1122 - New Connections tab New Connections tab In the section Meter Point Status , a new field 'Essential Plant‘ will be added under the field Trading Site Flag. This new field will either be blank or populated with YES. 7 esbnetworks.ie

  8. Thank You Footer

Recommend


More recommend