cpr construction products registration
play

CPR - Construction Products Registration From 1st July 17 all - PowerPoint PPT Presentation

CPR - Construction Products Registration From 1st July 17 all non-fire performance cables introduced into the EU market which are to be a permanent fixture in a building or construction must comply with CPR CPR Affects products installed


  1. CPR - Construction Products Registration

  2. From 1st July 17 all non-fire performance cables introduced into the EU market which are to be a permanent fixture in a building or construction must comply with CPR

  3. CPR • Affects products installed permanently in building and construction • Includes Cables • Looks at how they react in the event of a fire

  4. Cables Medium Voltage Power Cable Low Voltage Power Cable Data and Fibre Cable Twin Cable Flat Cable Control Cable

  5. The Cables Are Assessed For: Flame Smoke Flaming Acidity Propagation Emissions Droplets & Particles

  6. And are classified:

  7. So What Does Compliance Mean Conformite Europeanne CE Or European Conformity Assessment of Verification Of AVCP Constancy of Performance Declaration of DoP Performance

  8. CE Marking. a) Applied to Product or product packaging b) May also be on the cable print markings c) CPR classification and key product information for traceability (DoP)

  9. AVCP System. Assessment and Verification of Consistency of Performance “1+” Including: • Initial type-testing and continuous surveillance, • Audit & testing of samples by 3rd party certification body • Factory production control by manufacturer “3” including: • initial type-testing by 3rd party laboratory • factory production control by manufacturer “4” including: • initial type-testing and factory production control by manufacturer

  10. DoP Cut Ticket replicates Cut Ticket when CPR details of the CE label in doesn’t apply greater detail

  11. DoP Cleveland Cable holds the manufacturers DoP on file

  12. CPR Summary: (a) Buy from reputable sources, Cleveland cable is CPR compliant (b) Only affects cables introduced to the EU market after the 1st Jul 17, all cables prior to this date can be legally sold and installed without CPR as it was not a requirement (c) CPR helps make informed purchasing decisions ...... But other standards still apply.

Recommend


More recommend