2009 2009 bond proposal project kids committee
play

2009 2009 BOND PROPOSAL Project Kids Committee Board appointed - PowerPoint PPT Presentation

Allen Independent School District 2009 2009 BOND PROPOSAL Project Kids Committee Board appointed citizens committee that studied long range facility and technology needs Project Kids proposed 56 projects and prioritized their need


  1. Allen Independent School District 2009 2009 BOND PROPOSAL

  2. Project Kids Committee  Board appointed citizen’s committee that studied long range facility and technology needs  Project Kids proposed 56 projects and prioritized their need as critical, high or desired  Board identified all critical needs projects to be included in the November 2008 bond proposal  Board held auditorium, stadium and service center for May election

  3. Allen High School Auditorium Proposal 2009 2009 BOND PROPOSAL

  4. Bond Proposal for 2009  Existing Facilities: Auditorium  Seating Capacity : 672 or less  Located at Lowery Freshman Center  Original lights and sound  Facility hosts over 100 events year  Requires bussing students for rehearsals  Over 3000 students enrolled in Allen ISD fine arts programs (Grades 6-12)

  5. Bond Proposal for 2009  Construction of New Auditorium  1,500 seat, 75,000 sq. ft. auditorium  Built at northeast corner of AHS  Tie into new career technology wing  Features would include:  Orchestra pit  Ticket booth and concessions  Modern sound and lighting systems  Set construction and storage areas Estimated Cost- $23.3 million (Open Dec. 2011) 

  6. Bond Proposal for 2009  New Auditorium Details  75,000 sq. ft. auditorium  Paved & landscaped entry w/ lighting  1,000 seats at orchestra level and 500 mezzanine level  Gallery exhibition space  Open sound booth  Spotlight room  Ticket booth  Costume / prop & dressing rooms  Offices & conference room

  7. Allen ISD Auditorium Rendering – PBK Architects

  8. Allen ISD Multipurpose Stadium Proposal 2009 2009 BOND PROPOSAL

  9. Bond Proposal for 2009  Existing Facilities: Eagle Stadium  Permanent Seating Capacity 7,200  Temporary / Leased Bleachers 7,000  Annual lease cost of $225,000  Reserved seating capacity 4,200  Includes band section of approx. 1000 seats

  10. Bond Proposal for 2009  Eagle Stadium Current Usage  5-6 varsity football games  9 junior varsity football games  11 freshman football games  2 Allen Sports Assn. football playoffs  12 Special Olympics Track & Field

  11. Bond Proposal for 2009  Multipurpose Stadium  18,000 seat stadium  9,000 – home; 4,000 – student; and 5,000 visitor seating  Built at Exchange Parkway & Rivercrest on existing HS property  Includes wrestling rooms & locker room under bleachers  Improved sound, scoreboard, press box, concession and restroom facilities  Estimated Cost- $59.6 million (Open Aug. 2012)

  12. Bond Proposal for 2009  Multipurpose Stadium Details  Entries at each corner of stadium  Concrete structure seating  Covered open air concourse on home side  Ticket booths at each corner of stadium  Concessions at each corner of stadium  18” standard seating, 21” backed reserved seating (5,000 seats)  Open film deck at press box  Dual purpose home-side lockers  Wrestling & playoff game dressing area  Golf practice area with netting  Wrestling room and office area

  13. Bond Proposal for 2009  Multipurpose Stadium Usage  Football games – all levels  UIL Marching Band competitions  Soccer & football playoff host  Practice for football, wrestling, soccer, golf, lacrosse  Community gatherings, concerts

  14. Allen ISD Multipurpose Stadium

  15. Allen ISD Multipurpose Stadium Rendering – PBK Architects

  16. Bond Proposal for 2009  Allen High School

  17. Transportation, Maintenance & Student Nutrition Center 2009 2009 BOND PROPOSAL

  18. Bond Proposal for 2009  Existing Facilities: Service Center  Existing Property on Butler Drive  6.3 acres  Shared fuel facility with City of Allen  Parking for 36 busses on site  Parking for 48 busses off site at Allen HS  Parking for 20 district vehicles  Parking for 150+ employees off-site  34,000 sq. ft. service center

  19. Bond Proposal for 2009  Service Center & Warehouse  131,000 sq. ft. facility  Parking for 120+ school busses  Bus maintenance facility & offices  Allen ISD warehouse and distribution facility  Maintenance shops & offices  Student Nutrition bulk storage  Secure test material storage Estimated Cost- $36.5 million  (Open Dec. 2014)

  20. Bond Proposal for 2009  Service Center Details  55 acre site  Concrete paving for large vehicle traffic  Employee and visitor parking (200)  Fuel station with two 14,000 gallon diesel tanks and one 4,000 unleaded tank  Drive through bus wash  Space allocated for expansion

  21. Allen ISD Service Center Rendering – PBK Architects

  22. Allen ISD Facility History School Opened Age Lowery Auditorium 1982 27 Eagle Stadium 1976* 33 *Addition in 1987 Service Center 1982 27

  23. What Is The Tax Impact Of This Bond Proposal  If approved – would increase the debt service rate by .02  Impact of two cent increase  $100,000 home = $20 per year or $1.67 per month  $200,000 home = $40 per year or $3.34 per month  Cannot be higher due to state cap of 50 cents on debt service rate  Allen debt service rate is currently .4303. This will increase as bonds of 2008 are sold

  24. Tax Impact Of 2009 Bond Proposal Year M&O Debt Total 05-06 1.5000 0.4125 1.9125 06-07 1.3700 0.4051 1.7751 07-08 1.0400 0.4303 1.4703 08-09 1.0400 0.4303 1.4703 09-10* 1.0400 0.5000 1.5400 10-11* 1.0400 0.5000 1.5400 * Projections

  25. What If Bond Issue Is Rejected By Voters?  Would delay or cancel the three proposed projects  Results will not impact 2008 bond projects  Based on growth projections, students and community would continue to use facilities that were not designed for the current usage or attendance

  26. Bond Election Summary  Bond election for $119 million to build an auditorium, maintenance and transportation service center and a stadium  Early voting begins April 27  Election day is Saturday May 9

Recommend


More recommend