1900 crystal drive
play

1900 CRYSTAL DRIVE SPRC Meeting #3 DECEMBER 19, 2019 SPRC #2 - PowerPoint PPT Presentation

1900 CRYSTAL DRIVE SPRC Meeting #3 DECEMBER 19, 2019 SPRC #2 Follow-up SPRC #2 Follow-up: Alley Renderings Alley Renderings 4 Alley Renderings 5 SPRC #2 Follow-up: Bike Facilities Visitor Bike & Scooter Parking 7 SPRC #2 Follow-up:


  1. 1900 CRYSTAL DRIVE SPRC Meeting #3 DECEMBER 19, 2019

  2. SPRC #2 Follow-up

  3. SPRC #2 Follow-up: Alley Renderings

  4. Alley Renderings 4

  5. Alley Renderings 5

  6. SPRC #2 Follow-up: Bike Facilities

  7. Visitor Bike & Scooter Parking 7

  8. SPRC #2 Follow-up: Architecture & Massing

  9. Architectural Feature Previous Current 9

  10. Open Space & Landscaping: Connection to Future Center Park

  11. Stair Option A: Hanging Gardens 11

  12. Stair Option A: Hanging Gardens 12

  13. Stair Option B: Lombard Street 13

  14. Stair Option B: Lombard Street 14

  15. Stair Option C: Urban Ascent 15

  16. Stair Option C: Urban Ascent 16

  17. Stair Options 17

  18. Stair Options 18

  19. Typical Soil Section 19

  20. Stair Options 20

  21. Stair Options 21

  22. Open Space & Landscaping: Ground Floor Trees & Landscaping

  23. Ground Floor 23

  24. Street Trees Typical Tree Planting Detail (Crystal Dr/18 th /20 th ) 24

  25. Open Space & Landscaping: Private Open Space

  26. South Tower UPDATING GRAPHICS 26

  27. South Tower 27

  28. South Tower 28

  29. South Tower 29

  30. South Tower 30

  31. South Tower 31

  32. North Tower 32

  33. North Tower 33

  34. North Tower 34

  35. North Tower 35

  36. Planted Loggias 36

  37. Community Benefits & Site Improvements

  38. Site Improvements ● New sidewalk, curb, and gutter ● New street trees and landscaping ● Site furniture and visitor bike racks ● New streetlights ● Connection from Crystal Drive to Center Park ● Monumental Stair ● Retail alley 38

  39. Community Benefits ● Public easement over Center Park Phase I (~45,000 sf) and design of park in post-approval process ● Design and construction of Center Park monumental stair ● Ordinance standard affordable housing contribution ● LEED Silver with Two Arlington Priority Credits – 9% Energy Reduction – Building Envelope Commissioning ● 1:1 bike parking for residential units ● Covered public bike and scooter parking 39

  40. Phasing & Construction

  41. Construction Timeline Excavation Start May 2020 Excavation Complete / Structure Start October 2020 Below Grade Structure Complete Q3 2021 Above Grade Structure Topping Out Q2 2022 Substantial Completion Q4 2023 41

  42. Site Logistics 42

  43. 1900 CRYSTAL DRIVE LRPC Follow Up DECEMBER 19, 2019

  44. Green Tail

  45. Proposed Block Plan Site Build-to Lines Sector Plan Figure 3.2.2, pg. 33 CCSP Proposed Block Plan 45

  46. Final Condition Site Build-to Lines Sector Plan Figure 3.2.2, pg. 33 CCSP Proposed Final Condition 46

Recommend