JBG SMITH OVERVIEW AND LISTENING SESSION CRYSTAL CITY CIVIC ASSOCIATION | FEB. 27, 2019 2121 CRYSTAL DRIVE 2121 CRYSTAL DRIVE O U R V I S I O N | S I T E P L A N Central District Retail 1770 Crystal Drive 18th Street Park 1770 CRYSTAL


  1. JBG SMITH OVERVIEW AND LISTENING SESSION CRYSTAL CITY CIVIC ASSOCIATION | FEB. 27, 2019

  2. 2121 CRYSTAL DRIVE 2121 CRYSTAL DRIVE

  3. O U R V I S I O N | S I T E P L A N

  4. Central District Retail 1770 Crystal Drive 18th Street Park 1770 CRYSTAL DRIVE CENTRAL DISTRICT RETAIL 18TH STREET PARK

  5. S I T E P L A N | P L A Z A- P RO P O S E D PHASE II 4.1 SUBMISSION 12

  6. N AT I O N A L L A N D I N G | C RY STA L D R I V E 16

  7. N AT I O N A L L A N D I N G | C RY STA L D R I V E 22

  8. N AT I O N A L L A N D I N G | 1 7 70 C RY STA L D R I V E

  9. 1900 CRYSTAL DRIVE 1900 CRYSTAL DRIVE

  10. N AT I O N A L L A N D I N G | 1 9 0 0 C RY STA L D R I V E N O RT H E A ST V I E W

  11. N AT I O N A L L A N D I N G | 1 9 0 0 C RY STA L D R I V E S O U T H E A ST V I E W

  12. KEY TRANSPORTATION PROJECTS

  13. K E Y T R A N S P O RTAT I O N P R O J EC T S LONG BRIDGE POTOMAC YARD METRO NEW VRE STATION PEDESTRIAN BRIDGE TO DCA 2ND METRO ENTRANCE ROUTE 1 BLVD

  14. P E D E ST R I A N B R I D G E TO D C A E Project Summary Lead Agency Status C Included in HQ2-committed itted age. Proposed pedestrian bridge projects. Arlington Pedestrian over the CSX tracks and GW Arlington beginning planning and $36, Bridge to DCA Parkway directly linking National County DES design. Approvals still Landing with DCA needed.

  15. C RYSTA L C I T Y E A ST M E T R O E N T R A N C E E Project Summary Lead Agency Status C Crystal City A new entrance to the existing Included in HQ2-committed Arlington Metro East Crystal City metro station projects. Preliminary $90, County DES Entrance serving Crystal Drive design nearly complete.

  16. R O U T E 1 B O U L E VA R D E Project Summary Lead Agency Status Reconstruct Route 1 through National Landing as an at-grade Included in HQ2-committed Route 1 boulevard in order to better VDOT projects. VDOT to lead $250, Boulevard connect East and West sides design and construction. of CC

  17. V R E STAT I O N E Project Summary Lead Agency Status C Replace the existing Crystal Not included in HQ-2 City VRE station with a larger, package. Conceptual bi-directional station further VRE Station VRE design complete. VRE $41, south, connecting with preparing to issue RFP for proposed metro entrance and 100% design in Q1 2019 DCA ped bridge

  18. P OTO M A C YA R D M E T R O STAT I O N E Project Summary Lead Agency Status C New, infill Metro rail station Original design complete, Potomac Yard along the blue/yellow lines in the Alexandria redesign to reincorporate $370, Metro Station Potomac Yard section of 2nd entrance underway. Alexandria

  19. L O N G B R I D G E Lead Project Summary Status E Agency Preferred Alternative Construction of a new, released by project team two-track rail bridge over Long November 2018 includes the Potomac River to DDOT $1, Bridge separate bike/ped bridge supplement capacity of as required mitigation to existing Long Bridge NPS

  20. L O N G B R I D G E

  21. A M A ZO N H E A D Q UA RT E R S | S O U T H L A K E U N I O N , S E AT T L E - “A N E I G H B O R H O O D, N OT A C A M P U S ” - P L A C E M A K I N G - R E TA I L A N D ST R E E T S C A P E - PA R K S A N D O P E N S PA C E

  22. A M A ZO N H E A D Q UA RT E R S | S O U T H L A K E U N I O N , S E AT T L E