JBG SMITH OVERVIEW AND LISTENING SESSION CRYSTAL CITY CIVIC ASSOCIATION | FEB. 27, 2019
2121 CRYSTAL DRIVE 2121 CRYSTAL DRIVE
O U R V I S I O N | S I T E P L A N
Central District Retail 1770 Crystal Drive 18th Street Park 1770 CRYSTAL DRIVE CENTRAL DISTRICT RETAIL 18TH STREET PARK
S I T E P L A N | P L A Z A- P RO P O S E D PHASE II 4.1 SUBMISSION 12
N AT I O N A L L A N D I N G | C RY STA L D R I V E 16
N AT I O N A L L A N D I N G | C RY STA L D R I V E 22
N AT I O N A L L A N D I N G | 1 7 70 C RY STA L D R I V E
1900 CRYSTAL DRIVE 1900 CRYSTAL DRIVE
N AT I O N A L L A N D I N G | 1 9 0 0 C RY STA L D R I V E N O RT H E A ST V I E W
N AT I O N A L L A N D I N G | 1 9 0 0 C RY STA L D R I V E S O U T H E A ST V I E W
KEY TRANSPORTATION PROJECTS
K E Y T R A N S P O RTAT I O N P R O J EC T S LONG BRIDGE POTOMAC YARD METRO NEW VRE STATION PEDESTRIAN BRIDGE TO DCA 2ND METRO ENTRANCE ROUTE 1 BLVD
P E D E ST R I A N B R I D G E TO D C A E Project Summary Lead Agency Status C Included in HQ2-committed itted age. Proposed pedestrian bridge projects. Arlington Pedestrian over the CSX tracks and GW Arlington beginning planning and $36, Bridge to DCA Parkway directly linking National County DES design. Approvals still Landing with DCA needed.
C RYSTA L C I T Y E A ST M E T R O E N T R A N C E E Project Summary Lead Agency Status C Crystal City A new entrance to the existing Included in HQ2-committed Arlington Metro East Crystal City metro station projects. Preliminary $90, County DES Entrance serving Crystal Drive design nearly complete.
R O U T E 1 B O U L E VA R D E Project Summary Lead Agency Status Reconstruct Route 1 through National Landing as an at-grade Included in HQ2-committed Route 1 boulevard in order to better VDOT projects. VDOT to lead $250, Boulevard connect East and West sides design and construction. of CC
V R E STAT I O N E Project Summary Lead Agency Status C Replace the existing Crystal Not included in HQ-2 City VRE station with a larger, package. Conceptual bi-directional station further VRE Station VRE design complete. VRE $41, south, connecting with preparing to issue RFP for proposed metro entrance and 100% design in Q1 2019 DCA ped bridge
P OTO M A C YA R D M E T R O STAT I O N E Project Summary Lead Agency Status C New, infill Metro rail station Original design complete, Potomac Yard along the blue/yellow lines in the Alexandria redesign to reincorporate $370, Metro Station Potomac Yard section of 2nd entrance underway. Alexandria
L O N G B R I D G E Lead Project Summary Status E Agency Preferred Alternative Construction of a new, released by project team two-track rail bridge over Long November 2018 includes the Potomac River to DDOT $1, Bridge separate bike/ped bridge supplement capacity of as required mitigation to existing Long Bridge NPS
L O N G B R I D G E
A M A ZO N H E A D Q UA RT E R S | S O U T H L A K E U N I O N , S E AT T L E - “A N E I G H B O R H O O D, N OT A C A M P U S ” - P L A C E M A K I N G - R E TA I L A N D ST R E E T S C A P E - PA R K S A N D O P E N S PA C E
A M A ZO N H E A D Q UA RT E R S | S O U T H L A K E U N I O N , S E AT T L E
Recommend
More recommend