Honeoye Falls-Lima Central School District 2016 Additions and - PowerPoint PPT Presentation

Honeoye Falls-Lima Central School District 2016 Additions and Alterations Phase 2 Project Update June 2020 2016 Additions and Alterations Phase 2 Referendum Value $29,986,084 Incidental Budget $ 4,632,681 Construction Contingency $


  1. Honeoye Falls-Lima Central School District 2016 Additions and Alterations Phase 2 Project Update June 2020

  2. 2016 Additions and Alterations Phase 2 Referendum Value $29,986,084 Incidental Budget $ 4,632,681 Construction Contingency $ 1,564,311 Contracts Awarded $22,848,873 State Contract $ 940,219

  3. Construction Contingency Budget Update • Construction Contingency Budget $1,564,311 • Additional Co-Op Purchases $ 195,594 • Additional Credit $ 63,092 • Approved Change Orders $1,404,734 • Remaining Construction Contingency $ 35,571 • Construction Project is 94% Complete • Contingency Budget is 98% spent • Contract allowance approved totals $11,074 • Project Team is following approximately $84,500 in pending issues.

  4. Financial Overview • Voter Authorization $29,986,084 • Contracts Issued at Bid $23,789,092 • Authorized Change Orders $ 1,404,734 • Pending Change Orders $ 84,500 • District Purchase Orders $ 132,502 • Incidental Budget $ 4,297,109 • Incidental Purchases and Credits $ 15,039 • Total Remaining Project Funds $ 263,108

  5. 2016 Additions and Alterations Phase 2 Project Status/Schedule Update Manor Intermediate Senior High School • Concrete risers in the Music Room have • Lobby benches have been installed. been poured. • The sliding glass door dividing the Kitchen • MEP finishes are complete, and and Cafeteria has been installed. casework has been installed in the Music • Start- up’s and training for the Food Service Room. equipment are complete. • The serving line in the Kitchen has been • In the Robotics Lab, the casework and removed. The bearing wall separating the Kitchen from the Cafeteria has been countertops have been installed. temporarily shored and the opening for the new overhead door has been demo’d . • In the IT Suite, MEP rough- in’s are complete and framing is underway. • At the Main Entrance, the concrete sidewalks are nearly complete, the parking lot has received base, binder, and top. The Cougar wall has been painted and the illuminated sign has been installed.

  6. 2016 Additions and Alterations Phase 2 Project Status/Schedule Update Lima Intermediate Transportation Building • In the last phase, the structural steel has • The casework for the Main been erected, the MEP rough- in’s are Office has been fabricated and ongoing, the walls have been framed, and delivered. The installation is the gyp. board is being installed. underway. • The new doors and hardware are being • Framing in Classroom 105, the installed throughout. Discovery Lab, and the Nurses • The new overhead door in the key shop Suite is underway. has been installed. • The elevator has been inspected and is fully operational.

  7. 2016 Additions and Alterations Phase 2 What to expect in the upcoming Month Transportation Building Manor Intermediate • In the last phase, the walls will be • Music Room will be complete and finished and painted, the floor will be turned over to the District. mitigated and leveled, and new VCT will be installed. MEP finishes will be ongoing. • The new serving line will be installed in the Kitchen and the connections for • Casework will be delivered and installed the MEP’s will be made. throughout. • The Structural steel and overhead • Door and hardware installation will door for the new opening between the continue throughout. Kitchen and Cafeteria will be installed. • Wall and floor tile will be installed where needed in the Cafeteria.

  8. 2016 Additions and Alterations Phase 2 What to expect in the upcoming Month Senior High School Lima Elementary • The fabrication of the movable furniture • Casework for the Main Office will be for the Robotics lab will be ongoing. installed. • Doors and hardware will be installed • The floors in Classroom 105, the throughout. Discovery, and the Nurses Suite will be leveled, the walls will be finished, and • Framing will be completed in the IT MEP finishes will be ongoing. Suite, the walls will be boarded, casework will be fabricated, and MEP finishes will • The fabrication of the new transaction be ongoing. window in the Main Office will be ongoing. • Parking lot will be striped, and the remainder of the concrete sidewalks will be poured. • Demo will begin in Central Kitchen.

  9. Honeoye Falls-Lima Central School District 2016 Additions and Alterations Phase 2 Progress Photos

  10. Toilet Room – Transportation Center Dispatch Room 305 – Transportation Center Transportation Center

  11. Old Break Room – Transportation Center New Office Space – Transportation Center Training / Break Room – Transportation Center

  12. Transportation Center

  13. Music Room – Manor

  14. Cafeteria – Manor

  15. Cafeteria – Manor

  16. Parking Lot – High School

  17. Parking Lot – High School

  18. Main Entrance – High School

  19. Cafeteria – High School

  20. Cafeteria – High School

  21. 1 st Floor Flex Lab – High School

  22. Robotics Lab – High School

  23. Classroom 105 – Lima

  24. Nurses Suite – Lima