9-22-16: 10-6-16 BUILDING PRELIMINARY REVIEW BOARD OF COMMISSION DOCUMENTS COMPLETE REGENTS MEETING. AUTHORITY TO 9-22-16: CONSTRUCT DESIGN REPORT COMPLETE PROGRAM VERIFICATION SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION


  1. 9-22-16: 10-6-16 BUILDING PRELIMINARY REVIEW BOARD OF COMMISSION DOCUMENTS COMPLETE REGENTS MEETING. AUTHORITY TO 9-22-16: CONSTRUCT DESIGN REPORT COMPLETE PROGRAM VERIFICATION SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION MAY 5, 2016: MAY 19, 2016: JULY 14, 2016: DECEMBER 7 OR 14, 2016: JULY 10, 2017: WORKSHOP #3: PROGRAM COMPLETE MEETING #4: CONCEPT REVIEW MEETING MEETING #8: DFD PROJECT REVIEW MEETING Building Commission Meetjng Begin Constructjon PRESENTATION Meetjng on-site with Design Team: Meetjng with Craig Weisensel, Peter Bloechl-Anderson, SDS Proceeds with Final Documents Verify Space: Bob Hofgman, Paul Lippitu, Ron Bristol, Casey Coddington, ▪ Review schematjc design concepts JULY, 2018: McChesney/Kheraz, Robert Lux, Jake Ehmke, Rob ▪ Size requirements ▪ Review specifjc space needs for each MARCH 9, 2017: Substantjal Completjon Otremba for DFD Pre-submitual Review ▪ Code needs area Final documents submitued for Review ▪ Locatjon and relatjonships ▪ Review schedule and budget AUGUST 4, 2016: OCCUPANCY ▪ Equipment schedule MEETING #9: DESIGN DEVELOPMENT MEETING MARCH 30, 2017: Meetjng with SDS, DFD, UW-L, UW-System & Consultants ▪ Court lines & sizes JUNE 2, 2016: Final review comments from DFD / UWL ▪ Review all systems design (HVAC, Electrical, SEPTEMBER, 2018: MEETING #5: CONCEPT REVIEW MEETING Final Completjon Structural) ▪ Review modifjed schematjc designs APRIL 13, 2017: ▪ Meet with La Crosse Fire chief ▪ Confjrm fjtness equipment layouts Bid Documents Posted ▪ Review schedule & budget ▪ Confjrm multj-purpose room equipment / game lines AUGUST 25, 2016: ▪ Review schedule and budget MEETING #10: DESIGN DEVELOPMENT MEETING Meetjng with SDS, DFD, UW-L, UW-System & Consultants BIDDING JUNE 16, 2016: ▪ Review all systems design (HVAC, Electrical, MEETING #6: CONCEPT REVIEW MEETING Structural) APRIL 27, 2017: ▪ Finalize schematjc fmoor plan ▪ Review schedule & budget Building Tour/Walk-Through ▪ Review window locatjons / day lightjng ▪ Review systems with Focus on Energy Design ▪ Begin to discuss fjnish optjons Assistance MAY 11, 2017: ▪ Review schedule and budget Receive Bids SEPTEMBER 15, 2016: JUNE 30, 2016: MEETING #11: DESIGN DEVELOPMENT MEETING DESIGN CONCEPT COMPLETE PRESENTATION Meetjng on-site with Design Team: ▪ Final concept review ▪ Final Review of all systems ▪ Review fjnish optjons CONTRACTS / MOBILIZATION ▪ Review schedule and budget SEPTEMBER 22, 2016: 35% PRELIMINARY REVIEW DOCUMENTS COMPLETE JULY 6, 2017: Contracts - Notjce to Proceed OCTOBER 20, 2016: PRELIMINARY REVIEW COMMENTS FROM DFD / UWL SDS Architects, Inc. DESIGNED FOR LIFE Schedule | 1 Recreatjonal Eagle Center Additjon September 15, 2016 DFD Project No. 14I2B

  2. Site Plan SDS Architects, Inc. DESIGNED FOR LIFE | 1 Recrea � onal Eagle Center Addi � on September 22, 2016 DFD Project No. 14I2B

  3. Lower Level Plan Lower Level Reference Plan UP UP STAIR 143 SF MECH. STAIR 10N TELECOM EQUIP. 120 SF B10 ELEV. EQUIP 40 SF STORAGE 4268 SF ELEVATOR 78 SF VESTIBULE 155 SF UP UP STAIR 143 SF UP UP STAIR 47 STAIR MECH. 10N TELECOM EQUIP. 30 B10 ELEV. EQUIP 48 STORAGE ELEVATOR 40 35 VESTIBULE 45 UP UP STAIR 46 SDS Architects, Inc. DESIGNED FOR LIFE | 2 Recrea � onal Eagle Center Addi � on September 22, 2016 DFD Project No. 14I2B

  4. First Floor Plan First Floor Reference Plan STORAGE 101A STORAGE 101B VESTIBULE 100A JANITOR AEROBIC ROOM 103A 101 MEN WOMEN STAIR 102 103 EQUIP. 104 100M MULTI-PURPOSE 150 ELEV. 104A STORAGE 144 STORAGE STORAGE STORAGE STORAGE 150B 105A 105B 105C JANITOR 150A 100E VENDING DISPLAY 140 SERVICE 143 RECEIVE 106 PLANNING 141 OFFICE 142 TELE. 129 CORRIDOR 100H STORAGE 108 ADMINISTRATION 130 UP UP UP UP OFFICE ELECTRICAL 130A OFFICE OFFICE OFFICE 130B 130C 130D SERVICE STAIR 100M 109 ELECTRICAL SERVICE 109 GENERATOR EMERGENCY 109A EQUIP. COMM. 110 ELECTRICAL 112D STORAGE 112A STORAGE 112C STORAGE 112B SOUTH CORRIDOR 112 OFFICE 160A W1 UP UP VESTIBULE 113D WOMEN 117 DN STAIR FITNESS 26 CENTER 160 WOMEN'S LOCKER 113 UNISEX WORK SHOWER 119 JANITOR 116 160B 113C TOILET 27 TOILET DRYING 113A 113B FITNESS UP CORRIDOR MEN CENTER LOCKER 100P 118 STORAGE EMERGENCY 34 TOILET 115 160C 28 VESTIBULE 100G DRYING GENERATOR 114B TOILET 114A STAIR 100N CUSTODIAL WORK 114C SHOWER 109A 29 MEN'S CORRIDOR LOCKER 49 100Q CHNG. FIRST AID ELEVATOR 121 120 35 VESTIBULE 114D COMM. DN EQUIP. 110 UP UP UP STAIR DN 31 TRAINING 33 OFFICE 32 ELECTRICAL 112D STORAGE STORAGE 112A 112C STORAGE 112B SOUTH CORRIDOR 112 W1 UP UP VESTIBULE 113D WOMEN 117 DN STAIR 26 WOMEN'S LOCKER UNISEX 113 JANITOR 116 SHOWER 119 113C TOILET 27 TOILET DRYING 113A 113B UP CORRIDOR MEN FITNESS 100P 118 CENTER LOCKER 34 115 TOILET 28 VESTIBULE 100G DRYING 114B TOILET 114A STAIR 100N CUSTODIAL SHOWER WORK 114C 29 MEN'S CORRIDOR LOCKER 100Q 49 CHNG. FIRST AID 121 120 ELEVATOR VESTIBULE 35 114D DN UP UP UP DN STAIR 31 TRAINING OFFICE 33 32 SDS Architects, Inc. DESIGNED FOR LIFE | 3 Recrea � onal Eagle Center Addi � on September 22, 2016 DFD Project No. 14I2B

  5. Second Floor Plan Second Floor Reference Plan MECHANICAL 210 UP UP UP STAIR 200M JOGGING TRACK 201 UP UP EXCERCISE WARM UP 204 STAIR UP UP UP 200M MACHINES 203 EXCERCISE MACHINES 203 TRACK JOGGING 201 FLOOR SCRUBBER 211 UP DN MULTIPURPOSE CORRIDOR 44 200B MECHANICAL 212 36 MEN STAIR 200R WOMEN 38 ELEVATOR 35 STAIR 37 DN UP STORAGE 105D 139 SF JOGGING TRACK 201 FLOOR SCRUBBER 211 UP DN MULTIPURPOSE CORRIDOR 44 200B MECHANICAL 212 MEN 36 STAIR 200R WOMEN 38 ELEVATOR 35 STAIR 37 DN UP STORAGE 105D 139 SF SDS Architects, Inc. DESIGNED FOR LIFE | 4 Recrea � onal Eagle Center Addi � on September 22, 2016 DFD Project No. 14I2B

  6. Elevations South Elevation West Elevation SDS Architects, Inc. DESIGNED FOR LIFE | 5 Recrea � onal Eagle Center Addi � on September 22, 2016 DFD Project No. 14I2B