Monr Mo nroe oe Str Stree eet t Project oject Advi visor sory y Bo Boar ard Me Meeting ng August 25, 2016 N. Monroe Project Advisory Board Position 1 Position 2 Position 3 N. Monroe Business Owner N. Monroe Business Owner N.


  1. Monr Mo nroe oe Str Stree eet t Project oject Advi visor sory y Bo Boar ard Me Meeting ng August 25, 2016

  2. N. Monroe Project Advisory Board Position 1 Position 2 Position 3 N. Monroe Business Owner N. Monroe Business Owner N. Monroe Property Owner Legacy New/Emerging Dale Westhaver Ed Ardiss Brianna Musser Position 4 Position 5 Position 6 Emerson/Garfield Neighborhood Resident North Hill Neighborhood Neighborhood Megan Kennedy Michael Trautman E.J. Ianelli Position 7 Position 8 Position 9 At Large West Central Rep Business Owner From Riverside Chris Bornhoft Mike Wallace Jill Leonetti City Council District 3 City Council District 3 Council Member Council Member Karen Stratton Candace Mumm —

  3. Surviving Construction Meetings

  4. Cleveland/Fairview York Montgomery Indiana

  5. Focus Area 1: York to Cleveland or Fairview

  6. Pictures Between Cleveland & Grace looking east NE Corner of Monroe and York NW Corner of Monroe and Grace NW Corner of Monroe and York Looking west SW Corner of Monroe and Fairview SW Corner of Monroe and Grace looking west SE Corner of Monroe and Cleveland Looking west

  7. Focus Area 2: Indiana to Montgomery

  8. NE Corner of Montgomery and Monroe Between Montgomery and Mansfield Between Montgomery and Mansfield z Entering Project Area, Indiana and Monroe (Google Maps Image) Between Shannon Ave and Knox Ave on Monroe (Google Maps Image)

  9. Overview 1. Traffic Volume Reduction / Shift 2. Level of Service Comparison 3. Queuing at Indiana 4. Travel Time 5. Pedestrian Data 6. Emergency Vehicles 7. Deliveries and Garbage Pick-up 8. Snow Storage

  10. Traffic Analysis Process and Assumptions • 2011 Traffic Data Used in Analysis • Analysis Focused on PM Peak Hour Analysis • Peak Hour Typically from 5-6 PM • Northbound is Critical Movement

  11. Level of Service Comparison Existing Existing Conditions - Conditions - 2011 PM 3-Lane Monroe 2011 PM 3-Lane Monroe Peak - 2011 PM Peak Peak - 2011 PM Peak Corridor LOS LOS Corridor LOS LOS Maple-Ash Corridor Division Corridor C C Ash / Garland B B Division / Garland A A Maple / Garland C C Division / Montgomery A A Ash / NW Blvd B B Ruby / Montgomery B B Maple / NW Blvd C D Division / Indiana A A Ash / Indiana A A Ruby / Indiana Maple / Indiana A A Wall-Post Corridor Monroe Corridor C C Post / Garland B B Monroe/Indiana A N/A Wall / Garland B B Monroe/Montgomery C C Post / Buckeye C C Monroe/Garland Post / Indiana B B

  12. Northbound Queuing at Indiana during PM Peak Hour 5 LANES 3 LANES Northbound 370 ft 600 ft Time to Clear 36 secs 58 secs Queue

  13. Travel Time Existing Conditions 3 Lanes Northbound (N of Indiana 200 seconds 200 seconds to Garland) 3.33 min 3.33 min North Bound (South of 270 seconds 280 seconds Indiana to Garland) 4.5 min 4.6 min

  14. Pedestrian Data On Monroe Max Min Ave. 98 21 53 On Dalton Max Min Ave. 21 7 14 Date: Wed, Apr 13, 2016 Count Period: 3:00 PM to 7:30 PM Peak Hour: 4:30 PM to 5:30 PM 0 0 1 On Monroe 12 7 Max Min Ave. 0 69 36 49 0 On Carlisle 0 Max Min Ave. V %: PHF 11 2 7 .0% 0.46 .0% 0.54

  15. Emergency Vehicle Response Police • Response Time • Lane Width Improvement • Emergency Evacuation FIRE

  16. Deliveries and Garbage Pick-up Deliveries Center lane, drop-off zones, etc. Garbage Alley, Parking lot, and Side Street pickup.

  17. Snow Removal Plowing Present condition is to plow to the curb. Future condition will remain plowing to the curb. • Wider sidewalk provide better storage space.

  18. QUESTIONS?