E. Expos osition on Aven enue & e & S. Fillmor ore e Stree eet Storm Sy System
Projec oject O Over ervie iew The City and County of Denver is building a new storm drain system in the Bonnie Brae neighborhood. Denver’s 2014 Storm Drainage Master Plan identified the need at this location due to the significant amount of storm water that flows on neighborhood streets.
The he De Desi sign • 2,000+ feet of 24 – 36 inch diameter pipe • 22 inlets • 16 ADA ramps • 7 cross pans • 3 alley aprons • new asphalt curb to curb • Less stormwater in the street after rain and snow events!
Ph Phas asing o of Work The new system will tie into an existing storm system in E. • Exposition Avenue. Anticipate 1 block + 2 intersections closed at a time • For residents without alley access, the contractor will • maintain access to driveways
The W The Work • Start in July or August of 2019 • 6-7 months of construction • Work will start at E. Exposition Avenue and move south • Permitted construction hours – Monday - Friday 7:00 am – 9:00 pm – Saturday 8:00 – 5:00 (Saturday work will be infrequent) • Work will extend from sidewalk to sidewalk • Through traffic and parking will be limited in the immediate construction area • Sidewalks will remain open
Construction Updates • Website will be updated regularly + email updates http://bit.ly/BonnieBraeStorm – Denvergov.org/WCPM, then enter “Exposition and Fillmore” in the search bar – Sign up to receive email construction updates tonight or through CCD email below – • Contact construction team – Email - For general questions not requiring an immediate response • Email ccd.constructionupdates@gmail.com – Phone – For question that require a more immediate response • Josh Duran – Duran Excavating Project Manager (970) 351-0192 • Gary Duran – Duran Excavating Site Superintendent (970) 539-0490 • Rand Peterson – City of Denver Project Inspector (303) 880-4138 • Spanish & English Hotline (720) 460-9055