mobility advisory committe e me e ting
play

Mobility Advisory Committe e Me e ting De c e mb e r 19, 2017 Re - PowerPoint PPT Presentation

Mobility Advisory Committe e Me e ting De c e mb e r 19, 2017 Re g io n 1, F la nde rs Bldg 123 NW F la nde rs Stre e t Po rtla nd. OR 97209 oje c ts Pr I- 84: L indsay Cr e e k Star vation Cr e e k T CP update for 2018


  1. Mobility Advisory Committe e Me e ting De c e mb e r 19, 2017 Re g io n 1, F la nde rs Bldg 123 NW F la nde rs Stre e t Po rtla nd. OR 97209

  2. oje c ts Pr I- 84: L indsay Cr e e k – Star vation Cr e e k – T CP update for 2018 K19531 I- 5/ I- 84: Banfie ld Inte r c hange – De sign pr oposal, Ramp Closur e s, De tour s, VC’s K18769 OR99E : Roc kfall Mitigation – De sign pr oposal, staging K19533 I- 405: F r e mont Br idge Modular Joint Re plac e me nt – VC pote ntial r e duc tions K#18841 OR217: OR10 to OR99W SB Aux L ane – VC’s 2

  3. Ag e nda − Pro je c t Ove rvie ws − ORS 366.215 disc ussio ns fo r VC’ s 3

  4. K#19531 I- 5/ I- 84: Ba nfie ld Inte rc ha ng e T ype : Bridg e , MP 302.00 Dra ft T MP PS&E Due : Curre nt a nd De c isio n 2/ 12/ 2018 Pha se : F ina l T re e o n file Bid Da te Pla ns 4/ 3/ 2017 4/ 12/ 2018 4

  5. Sc ope Pro po se d Wo rk 6

  6. Mo b ility I mpa c ts - Ra mp Clo sure s - L a ne Clo sure s - De la y - Co ng e stio n o ve r 50+ a ntic ipa te d nig hts

  7. Ra mp De finitions 8

  8. L a ne Closur e Re str ic tions (Ra mp C) 9

  9. L a ne Closur e Re str ic tions (Ra mp C) 10

  10. L a ne Closur e Re str ic tions (Ra mp A) 11

  11. L a ne Closur e Re str ic tions (Ra mp A) 12

  12. L a ne Closur e Re str ic tions (Ra mp A) 13

  13. L a ne Closur e Re str ic tions (Ra mp B) 14

  14. L a ne Closur e Re str ic tions (Ra mp B) 15

  15. L a ne Closur e Re str ic tions (Ra mp B) • I-84 westbound ramp to I-5 southbound (Ramp B, right lane only) for bridge deck structural overlay between bent 17 and 24 Bridge No. 08588A and right side bridge rail, Bridge No. 08588B for 5 days total duration beginning Friday July 27, 2018 10:00pm ending Thursday August 2, 2018 5:00am. • I-84 westbound ramp to I-5 southbound (Ramp B both lanes) for bridge deck structural overlay, Bridge No. 08588B for 9 days total duration beginning Friday August 17, 2018 10:00pm ending Monday August 27, 2018 5:00am. 16

  16. L a ne Closur e Re str ic tions (Ra mp D) • I-5 northbound ramp to I-84 eastbound (Ramp D) for bridge deck seal, Bridge No. 08588D nighttime closure only beginning Tuesday August 28, 2018 ending Friday September 14, 2018, as follows Nightly, Sunday night through Friday morning between 10:00 p.m. and 5:00 a.m. Friday night through Saturday morning between 10:00 p.m. and 8:00 a.m. Saturday night through Sunday morning between 10:00 p.m. and 9:00 a.m 17

  17. L a ne Closur e Widths Ra mp A Clo sure , She e t E B03, Se c tio n A-A, Sta g e I I , Pha se I a nd a ntic ipa te d dura tio n 18

  18. L a ne Closur e Widths Ramp A Closure, Sheet EB07, Section A-A, Stage II, Phase 2 was covered, including anticipated duration 19

  19. L a ne Closur e Widths Ra mp B Clo sure , She e t E C03, Se c tio n A-A, Sta g e I I I , a ntic ipa te d dura tio n 20

  20. De tour s Se e Pla n She e ts E A01 to E D05 21

  21. Ve r tic a l Cle a r a nc e Se e VC do c ume nt a nd ha ndo uts 22

  22. K#18769 OR99E : Roc kfa ll Mitig a tion T ype : Ro c kfa ll Mitig a tio n, MP 12.62 – 13.36 Dra ft T MP PS&E Due : a nd De c isio n Curre nt 1/ 12/ 2018 T re e o n file : Pha se : PS&E Bid Da te 9/ 14/ 2017 3/ 15/ 2018 23

  23. Sc ope Pro po se d Wo rk Problem Description Frequent rockfalls and vehicle impacts have resulted in damage to the existing pinned and draped mesh systems along the east side of OR99E in the following sections: MP 12.62 – 12.87 and 13.15 – 13.36. Repair of the mesh is required to reduce the risk of rocks falling from the slopes and impacting the highway. Project Delivery Approach This project will be developed as a design-bid-build project and procured through Commission Services contracting. It is anticipated that all design work will be conducted by Agency staff. 25

  24. Mo b ility I mpa c ts - Sta g ing

  25. Sta g ing Pro po se d Wo rk a t Ca ne ma h Se c tio n 27

  26. Sta g ing Pro po se d Wo rk a t T unne l Se c tio n 28

  27. L a ne Re str ic tions Antic ipa te da ytime o ve r-dime nsio na l ve hic le s b e twe e n the fo llo wing sunrise a nd sunse t pe rio ds: • ฀ Ma y: b e twe e n 5:30 a .m. a nd 9:00 p.m. • ฀ June : b e twe e n 5:00 a .m. a nd 9:30 p.m. • ฀ July: b e twe e n 5:00 a .m. a nd 9:30 p.m. • ฀ Aug ust: b e twe e n 5:30 a .m. a nd 9:00 p.m. • ฀ Se pte mb e r: b e twe e n 6:00 a .m. a nd 8:00 p.m. 29

  28. T he Pro po sa l

Recommend


More recommend