2014 The reconstruction project of low-rise apartment buildings in St. Petersburg and Leningrad region Legal regulation of participants in the process of reconstruction of housing in all its stages is performed in accordance with: Articles 25, 40 and 72 of the Constitution of the Russian Federation; Civil Code of the Russian Federation; Federal Law of the Russian Federation of December 29, 2004 № 188 -FZ "Housing Code of the Russian Federation"; Federal Law of November 23, 2009 N 261-FZ "On energy saving and energy efficiency improvements and on Amendments to Certain Legislative Acts of the Russian Federation"; Legislation on local self-government, as well as on the basis of legal acts of the Russian Federation and local government. ООО "Corporation Sixteenth trust" K & M EU O Ü 07.01.2014
[THE RECONSTRUCTION PROJECT OF LOW-RISE APARTMENT BUILDINGS IN ST. PETERSBURG AND LENINGRAD 7 января 2014 г. REGION] Pyramidal arrangement in longitudinal and transverse direction Some Projects to
[THE RECONSTRUCTION PROJECT OF LOW-RISE APARTMENT BUILDINGS IN ST. PETERSBURG AND LENINGRAD 7 января 2014 г. REGION] Stages of reconstruction Typical low-rise home for reconstruction
[THE RECONSTRUCTION PROJECT OF LOW-RISE APARTMENT BUILDINGS IN ST. PETERSBURG AND LENINGRAD 7 января 2014 г. REGION] Variants reconstruction of houses
[THE RECONSTRUCTION PROJECT OF LOW-RISE APARTMENT BUILDINGS IN ST. PETERSBURG AND LENINGRAD 7 января 2014 г. REGION] Investment costs residents of the building and that they are getting Approximate investment costs per apartment - 325 000,00 rubles or 5 500,00 rubles per square meter of the total area of the apartment. This is 20% ~ 30% of the total cost of reconstruction and modernization of residential house (without performing work to strengthen the support structure that clarifies after inspection of the building); Strengthening the foundations and supporting structures; Recovery house facade with holding thermal insulation; Finishing repair of the common areas, including technical rooms; Complete replacement of of roofing system; The construction loggias (balconies) with glazed windows (getting into the property); Window replacement for metal and plastic; Replacing risers internal plumbing and sanitary heating and general house-systems; Repair stairwells; Installation of entrance doors with intercom system; Thermal knot with automatic temperature control; Reduced fees for the maintenance and repair of the house; Accomplishment of adjoining to the house territory. Residents have the opportunity to expand their living space. Connecting to telecommunications networks (telephone, internet, cable TV, alarm) Investment costs of the investor 30,000 - 35,000 rubles per square meter of floor area The price of the housing in the Kalinin district of St. Petersburg, from 80 000 to 100 000 rubles per square meter of floor area. Significant reduction in timing of the project (up to one year) Significant reduction procedures for approval prior to construction of the project and on its completion No need for resettlement of residents during the construction or renovation Lack of necessary registration of the documentation for land Most of the proposed houses for reconstruction are located mainly in the central part of the city of St. Petersburg
[THE RECONSTRUCTION PROJECT OF LOW-RISE APARTMENT BUILDINGS IN ST. PETERSBURG AND LENINGRAD 7 января 2014 г. REGION] Some addresses the location of houses for reconstruction in St. Petersburg St. Petersburg, Kalinin district Str. academician Lebedev 1 Str. Arsenal 2 Str. Bestuzhevskaya 3 Str. Vasenko 4 Str. Gerasimovsky 5 Civil Prospect 6 Str. Komsomol 7 Kondratievsky Prospect 8 Laboratory Prospect 9 Some of the addresses in the Leningrad region, in areas adjacent to the city limits. Leningrad region, Vsevolozhsk district Leningrad region, Vsevolozhsk Leningrad region, Vsevolozhsk district, village Lavriky Leningrad region, Vyborg district, Roshino
[THE RECONSTRUCTION PROJECT OF LOW-RISE APARTMENT BUILDINGS IN ST. PETERSBURG AND LENINGRAD 7 января 2014 г. REGION] Disposition of the apartment houses (n. Lavriky, Vsevolodsk district of Leningrad region)
[THE RECONSTRUCTION PROJECT OF LOW-RISE APARTMENT BUILDINGS IN ST. PETERSBURG AND LENINGRAD 7 января 2014 г. REGION] Facade and reconstructed sectional view apartment buildings (Lavriky, Vsevolodsk district, Leningrad region)
[THE RECONSTRUCTION PROJECT OF LOW-RISE APARTMENT BUILDINGS IN ST. PETERSBURG AND LENINGRAD 7 января 2014 г. REGION] Volumetric reconstruction plan apartment houses (Lavriky, Vsevolodsk district, Leningrad region)
[THE RECONSTRUCTION PROJECT OF LOW-RISE APARTMENT BUILDINGS IN ST. PETERSBURG AND LENINGRAD 7 января 2014 г. REGION] Information about company Name: Mikhail Voloshenko Name: Ishkinin Rafail CEO, Chairman of the Board CEO, Chairman of the Board Company: «K&M EU» OÜ Company: ООО " Corporation Sixteenth Trust " Reg:nr. 12246054 Reg:nr. ИНН 1117847038143 Composition of the founders: Состав учредителей : 1. Mikhail Voloshenko, 1. CJSC "Construction Company" Sixteenth Trust "(state registration 2. Tiit Urva number № 38612 from 28.11.1996 ) 2. LLC "BSP-ltd" (state registration number 007 288 206 number from Address: Riia 185 str., 17.09.2009) City/Country: Tartu 51014, Estonia Address: Str. Chernigovskaya, 8, lit. B, office 413 Phone/Fax: + 7 904 6390096, +7 9817191200 City/Country: 196084, Russia, St. Petersburg, Email: sgk-urep@yandex.ru Phone/Fax: +7 812 3885597 Email: info@km.com.ee www.km.com.ee Bankers: SEB Bankers: Филиал «Санкт - Петербургский «КБ» Адмиралтейский» Account #: 10220205498229 Account #: 40702810200410000918 IBAN: EE531010220205498229 к/с 30101810400000000818 в ГРКЦ ГУ Банка России по Санкт - BIC SEB Bank (kood SWIFT): EEUHEE2X Петербургу,БИК044030818 Bank address: Tornimäe 2, Tallinn, Eesti Business of the company (profile): Business of the company (profile): Low-rise construction Multistory building construction, construction of bridges, roads, tunnels
[THE RECONSTRUCTION PROJECT OF LOW-RISE APARTMENT BUILDINGS IN ST. PETERSBURG AND LENINGRAD 7 января 2014 г. REGION] Additional information is provided for the investor and / or purchaser of housing at the appropriate stages of construction and reconstruction of the existing building Minutes of the general meeting of the owners and the resolution of the reconstruction, (or 2/3 majority of homeowners' for capital repairs and reconstruction "); Signed three-way agreement with the municipality, the developer and the homeowners; Resolution of the reconstruction; Technical passport of the existing building; The Urban Development Plan with the functionality and the definition of the status of the building; Agreed architectural and planning decisions; Documents of ownership of the building; Documents for ownership of the land; Plan PIB surrounding buildings; Topographic Survey 1:500 plan utility networks; Materials previous geological surveys; Materials previous ecological research; Existing contracts with supply companies (water, electricity, sewage); New specifications for engineering support for connections utility networks; The new cadastral plan of the land plot new apartment building; New technical passport of the reconstructed building
Recommend
More recommend