A UBURN S CHOOL D ISTRICT N O . 408 CAPITAL PROJECTS DEPARTMENT WORK IN PROGRESS July 2010
Admin. Bldg. Computer Room HVAC Improvements New air-conditioning equipment for Computer Room and Telecommunications Room.
Admin. Bldg. Computer Room HVAC Improvements Existing Computer Room that will receive new air-conditioning system.
Admin. Bldg. Computer Room HVAC Improvements New air-conditioning equipment in Telecommunications Room.
Alpac Elementary Mech. & Elec. Improvements Worker preparing to set concrete form for new light pole base.
Alpac Elementary Mech. & Elec. Improvements Existing light pole with new energy efficient light fixtures installed at top of pole.
Alpac Elementary Mech. & Elec. Improvements New energy efficient water heater.
Athletic Fields & Running Track Improvements Auburn Riverside High School: Cleaning of existing pad that remains in place at the football / soccer field.
Athletic Fields & Running Track Improvements Auburn Riverside High School: Installation of concrete forming material for football goalpost footing.
Athletic Fields & Running Track Improvements Auburn Riverside High School: Installation of new synthetic turf.
Athletic Fields & Running Track Improvements Auburn Riverside High School: Installation of new game lines at football / soccer field.
Athletic Fields & Running Track Improvements Auburn Riverside High School: Synthetic turf infill material being spread over new synthetic turf.
Athletic Fields & Running Track Improvements Auburn Riverside High School: Removal of existing rubberized running track.
Athletic Fields & Running Track Improvements Auburn Riverside High School: Football / soccer field after removal of existing synthetic turf.
Athletic Fields & Running Track Improvements Auburn Riverside High School:
Athletic Fields & Running Track Improvements Auburn Memorial Stadium: Removal of existing synthetic turf at new drain line trenches.
Athletic Fields & Running Track Improvements Auburn Memorial Stadium: Removal of existing synthetic turf.
Athletic Fields & Running Track Improvements Auburn Memorial Stadium: Removal of existing synthetic turf.
Athletic Fields & Running Track Improvements Auburn Memorial Stadium: Partial removal of existing synthetic turf at midfield.
Athletic Fields & Running Track Improvements Auburn Memorial Stadium: Trench for new underground drain lines.
Athletic Fields & Running Track Improvements Auburn Memorial Stadium: New trenches and partial removal of existing synthetic turf.
Athletic Fields & Running Track Improvements Auburn Memorial Stadium: Existing rubber pad where synthetic turf removed.
Athletic Fields & Running Track Improvements Auburn Memorial Stadium: Existing rubber pad where patching will be done.
Auburn Memorial Stadium Structural Bracing Concrete panels at end of Home grandstand where seismic bracing will be installed.
Auburn Memorial Stadium Structural Bracing Cracks in existing concrete panels where new seismic bracing will be installed at opposite side of wall.
Auburn Memorial Stadium Structural Bracing Interior surface of existing concrete panels where new seismic bracing will be installed.
Auburn Pool Boiler Replacement Six-lane pool with water being heated by new energy efficient condensing boilers.
Auburn Pool Boiler Replacement New condensing boilers located in Mechanical Room.
Auburn Pool Boiler Replacement Control panel at new condensing boiler.
Cascade Middle School Generator Replacement The new generator will provide electrical power for emergency lighting and communication systems throughout the school during a power outage.
Cascade Middle School Generator Replacement Existing emergency generator that no longer functions and will be replaced.
Cascade Middle School Generator Replacement Underground electrical conduit at generator pad that is being modified to accommodate the new generator.
Cascade Middle School Generator Replacement New chainlink gate installed at generator enclosure to provide improved access.
Curbs and Sidewalk Improvements Administration Building: Replacement of damaged and uneven sidewalk at J St. NE.
Curbs and Sidewalks Improvements Auburn High School: New wheelchair ramp at front entry to 100 Unit.
Curbs and Sidewalk Improvements Hazelwood Elementary School: New wheelchair ramp at bus loading area and staff parking lot.
Curbs and Sidewalks Improvements Auburn Riverside High School: New wheelchair ramp at bus loading area.
Curbs and Sidewalk Improvements Pioneer Elementary School: New wheelchair ramp at front of school.
HVAC Improvements Auburn Riverside High School: Computer classroom that will receive additional air-conditioning to address overheating caused by computer equipment.
HVAC Improvements Auburn Riverside High School: Existing air-conditioning chiller unit that will receive new compressors.
HVAC Improvements Auburn Riverside High School: Existing mechanical unit that will be replaced with larger unit to increase air-conditioning capacity.
Auburn High School Renewal The post-occupancy survey conducted at Auburn Mountainview High School will be used to create a list of lessons learned and lessons will be considered in the design of the Auburn High School Renewal project.
Auburn High School Renewal Aerial photograph of existing campus.