Wilde Lake Middle School Replacement School Construction Documents - PowerPoint PPT Presentation

Wilde Lake Middle School Replacement School Construction Documents Report Scott Washington Director, School Construction December 15, 2014 Project Updates Reconfigured the locker room support spaces Removed dust collection system and


  1. Wilde Lake Middle School Replacement School Construction Documents Report Scott Washington Director, School Construction December 15, 2014

  2. Project Updates • Reconfigured the locker room support spaces • Removed dust collection system and modified storage room area accordingly • Modified glazing at media center to provide area for permanent projectors and boards at two instructional areas • Increased volume of sunshades throughout

  3. Project Updates (con’t) • Provide continuous paved pathways for students of both campus schools • Provide two separate practice fields in lieu of second baseball field • Provide an outdoor classroom area in rear of school • Worked with neighborhood associations to establish future neighborhood pathways

  4. SIT E NOT E S ZONI NG: NT (NE W T OWN) ACRE S: 14.9 ACRE S PARKING T ABUL AT IONS CAR SPACE S = 69 (I NCL UDI NG 3 HC SPACE S) BUS SPACE S = 15 0 25 50 1 00 Existing Site Plan

  5. 3 SIT E NOT E S 9 ZONI NG: NT (NE W T OWN) 8 ii ACRE S: 14.9 ACRE S BIO RETENTIO N AREA iii 438 PARKING T ABUL AT IONS EX 438 3 440 ISTING C 442 CAR SPACE S = 108 S T R U (I NCL UDI NG 5 HC SPACE S) C T U 4 R 4 4 E 444 O GRASS MMER 20' FIR E L ANE 9 PLAY B BUS SPACE S = 15 446 B I O R AREA E C T 448 E N IAL / RET 2 6 7 A T R I O E 5 N A 450 ' W 80' x 1 05' E 452 T AIL 444 L 442 454 A N 438 D NEW W ILDE L AK E S BUFFER 440 E T B MIDDL E SC HO O L A C K 5 456 W ET LANDS E 1 0 IC 448 F.F. = 445.5 446 444 V 450 SER 2 452 iii i T A 1 4 HC ANE 20' FIRE L 454 L SITE S L O U O B 10 P 4 5 2 NEW 4 450 O PLAYFIELDS 4 3 HO 6 EX ISTING 4 AREA FF AREA 4 4 8 4 HIGH SC HO O L E HIGH SC P-O 4 BASEBALL FIELD T O LO 11 DR 446 3 N N RETENTIO RETENTIO 23 23 24 24 4 2 4 4 4 4 ARKING 1 80' x 300' 438 4 BIO BIO ARENT 4 2 ILDE LAK EX IST ING 2 R ESIDENTIAL O O P P R R MIC MIC 0 4 4 0 4 4 12 W 250' 2 4 4 FO O TPRINT O F EX ISTING SIT E 8 SIGN W ILDE LAK E MS 4 3 4 4 4 (SHO W N HA T C HED) AC C ESS DR IV E AC C ESS 4 4 2 T O W ILDE LAK E 4 4 4 440 HIGH SC HO O L 4 4 6 14 4 4 8 4 4 2 0 4 5 4 4 4 4 4 6 452 4 4 8 4 5 0 EX IST ING TENNIS C L UB Final Site Plan 13

  6. First Floor Plan

  7. Second Floor Plan

  8. E xisting Wilde L a ke Middle Sc ho o l 66 kBT U/ sf Building Ba se Building pe r ASHRAE 90.1-2007/ 51 kBT U/ sf L E E D Minimum Middle Sc ho o l No .20 38 kBT U/ sf (T ho ma s Via duc t Middle Sc ho o l) Ne t Ze ro Goa l Wilde L a ke Middle Sc hool 25 kBT U/ sf Re pla c e me nt Building Energy Use Index Comparison

  9. Ae ria l Vie w Vie w of Outdoor Classroom

  10. Total Project Budget Base Construction Estimate * $33,307,851 (includes 2% CD construction contingency $666,157) Architect/Engineering Fee $2,380,830 Construction Management Fee $2,100,000 Related Costs $1,582,808 Project Contingency $1,582,808 Equipment and Technology $2,200,000 Project Total Budget $43,154,297 Funding Projections FY14 $2,658,000 FY15 $8,200,000 FY16 $18,234,000 FY17 $12,895,000 MEA Grant Contribution $2,773,000 Total Funding Projections $44,760,000 *Prevailing wage requirements have been included in the cost

  11. Summary • Schedule – Receive bids March 2015 – Construction starts May 2015 – Completion August 2017 • Request approval of construction documents and allow staff to proceed to bid