Update presentation on proposals for Hendy Wind Farm Steven Radford William Little
Responding to feedback Feedback from consultation: Our response: • Visual impact • Reduced the number of turbines • Noise • Reduced the height of the turbines • Moved the turbines further south to reduce visibility from Penybont
Comparison of schemes Revised scheme: Initial scheme: • Eight turbines • Seven turbines • 80m to hub • 70m to hub (same as mast) • 121m to tip • 110m to tip • Moved away from Llandegley Rocks • Where possible the turbines have been located 1km from residential properties
The turbines Original turbines: Turbines in the revised scheme:
Visibility map of the initial scheme
Visibility map of the revised scheme
Penybont Initial Layout Revised
Hundred House Initial Layout Revised
Sustrans Route Cowlod Initial Layout Revised
Footpath Shaky Initial Layout Bridge Revised