Sandymount to Seapoint Corridor Study S2S Supporters Meeting November 15 th 2016 Michael Collins for S2S
Overview of S2S 1. Background 2. South Bay City Centre 3. City Centre 4. North Bay Michael Collins for S2S
Main Sections 1. Merrion Road 2. Merrion Gates 3. S2S Michael Collins for S2S
1. IRISHTOWN TO PROMENADE (1.5Km) Part 1: Sean Moore Park Existing: 3.2m walkway - No cycleway. Proposed: 3.5m cycleway + grass strip Part 2: Beach Rd to Newgrove Avenue Existing: Small footpath - No cycleway. Proposed: 2.5m footpath - 3.5m cycleway Comments: Land Acquisition. Flood Protection. Part 3: Newgrove Ave to Promenade Existing: Narrow footpath - no cycleway. Proposed: 4.0m boardwalk; 3m cycleway Michael Collins for S2S Comment: Flood Protection
2A: Sandymount Promenade (1.1km) Existing: 3.7m walkway, no cycleway. Proposed: New 3.5m cycleway + buffer Comment: Constrained at the south end? Michael Collins for S2S
3 : Merrion Gates (300m) Existing: Narrow road and footpath no cycleway Proposed: Link Road over rail line. Strand Rd shared cul-de-sac. New under-pass for walkers and cyclists Comment: Land Acquisition; Underpass Merrion Gates Michael Collins for S2S
4. Merrion Gates to Blackrock (2.4 kms) 4A: Merrion Gates to Booterstown Existing: Narrow walkway, cycleway in bus lane Proposed: Widened footpath and cycleway. Issues: Land Acquisition; Crossovers; Busy road Michael Collins for S2S
4B: Booterstown to Blackrock Existing: Narrow walkway + cycleway in Park Proposed: New cycleway. Wide link to Blackrock Issues: Possible duplication – Land Acquisition Michael Collins for S2S
6 Blackrock to Seapoint (1.1 kms) Existing: Nothing on seafront Proposed: S eafront Walkway, Cycleway on road. Issues: Seapoint one way, Land Acquisition at Seapoint. Separation of Cycleway/Walkway. Michael Collins for S2S
Why not on the Seafront ? Issues • Designation of the area as an SAC and SPA SAC Approx 740 Ha • “Project Splitting” • Conflict in Environmental SPA Approx 2000Ha Objectives. Michael Collins for S2S
Positive vs Negative for the S2S Positive Negative • Inland Walkway/Cycleway partly on road from • Seafront/Off-Road Walkway/Cycleway from Merrion Gates to Blackrock (2.5 kms). Irishtown to Merrion Gates (3.75 kms) • Inland Cycleway on road from Blackrock to • Seafront Walkway from Blackrock to Seapoint Seapoint (1.0 kms). (1.0km). • Requires significant land purchase. • Viable (if less desirable for sections) route for total 6.5kms – Irishtown to Seapoint. • Possible duplication and waste of money. • Resolves the traffic problems at Merrion Gates. • Not a continuous off-road, traffic free, safe cycleway/walkway. • Opportunity to re-evaluate the constraints. • Completion of S2S project is not precluded. Michael Collins for S2S
Policy Decision 1: Accept the proposals as a significant step forward. 2: Express the hope that the required environmental assessments would demonstrate that the need to protect birds / habitats can be reconciled with the provision of (a) sustainable transport systems and (b) access to amenity for the community. 3: Work towards the provision of a fully coastal cycle / pedestrian route as the preferred option. Michael Collins for S2S
Submission Submissions by the 16 th December 2016 https://www.nationaltransport.ie/consultations/nta-opens- On-line: consultation-on-ambitious-proposals-to-tackle-merrion-gate- bottleneck/ Email : eastcoast@nationaltransport.ie By post: National Transport Authority. Dún Scéine, . Iveagh Court, Harcourt Lane, Dublin 2, D02 WT20 Michael Collins for S2S