SOI-ASIA University of Hasanuddin By: Muhammad Niswar Hasanuddin University Site • SOI-Asia Project infrastructures have installed in Centre for Public Policy and Development Management Studies Building, Hasanuddin University as a Counterpart.
Environment • Semi-interactive site. • On campus LAN is partially connected . • The center has 15 PCs for self-education. • External connectivity is dial-up connection. • Classroom capacity is available up to 30 persons. Environment
Equipment Setup Satellite s 6 M b p M b 6 p s Satellite dish Satellite dish Internet Sony Box Receiver 64 Kbps (dial-up connection) Modem UDL Router Defaullt GW : 202.249.26.49 Netmask : 255.255.255.248 DNS :202.249.26.50 PSKMP-PC Room Default GW : 192.168.10.1 Netmask : 255.255.255.0 DNS : 192.168.10.2 Web Proxy : 192.168.10.2 Port : 3128 Multiplexer Hub Server 202.249.26.50 WMT RPT Staf Communication (ChatRoom) 202.249.26.51 202.249.26.52 202.249.26.53 Screen Screen Video Last Condition of UNHAS site Problem: • No connection is established between Sony Box and UDL Receive Router, which is indicated by LED indicator of ‘LAN/act’ on Sony Box is turn off. • We can upload limited real time source: Video and Audio because of insufficient BW
Last Condition of UNHAS site The problems occurred due to: • Lightening strikes harm the Sony Box, Router and Modem. • External connectivity is dial-up connection using modem that provide 56 Kbps. This is considered as insufficient. Solution • Install the good grounding system (Done) • providing sufficient BW for the external connectivity (in progress)
SOI-Staff • Mr.Samuel Poli • Mr.Baso Siswadarma • Mr.A.Amrullah • Mr.Muhammad Niswar