rockaway borough board of education
play

Rockaway Borough Board of Education Referendum Projects Parette - PowerPoint PPT Presentation

Presentation for: Rockaway Borough Board of Education Referendum Projects Parette Somjen Architects March 27, 2018 www.planetpsa.com HOW DID WE GET HERE Spring 2016 Parette Somjen Architects (PSA) assists with small project at White House


  1. Presentation for: Rockaway Borough Board of Education Referendum Projects Parette Somjen Architects March 27, 2018 www.planetpsa.com

  2. HOW DID WE GET HERE Spring 2016 Parette Somjen Architects (PSA) assists with small project at White House • Summer 2016 District develops capital needs list “basics” Fall 2016 Sacred Heart School Identified as option PSA assists with evaluation of Sacred Heart School Sacred Heart not pursued April 2017 District Issues Architectural RFP; PSA retained May to Dec 2017 PSA assists in refining capital needs list Debt Service Aid identified as opportunity Board and Community Meeting(s) April 2018 Submission deadline for Referendum October 2018 Referendum - Community Vote www.planetpsa.com

  3. LINCOLN ES – INFRASTRUCTURE GENERAL CONSTRUCTION FIRE ESCAPE REPAIRS • I.T. CLOSET • GREASE TRAP REPLACEMENT • FLOORING (CAFETERIA, LIBRARY) • ROOF REPLACEMENT • CEILINGS • PLASTER REPAIR • FIRE ALARM SYSTEM • MECHANICAL BOILERS AND PUMPS • GYM AIR CONDITIONING • CAFETERIA AIR CONDITIONING • UNIT VENTILATORS (SCHOOL-WIDE) • www.planetpsa.com

  4. LINCOLN ES – INFRASTRUCTURE ELECTRICAL ELECTRICAL UPGRADES CONTINUED (SCHOOL-WIDE) • INTERIOR LED LIGHTING (SCHOOL-WIDE) • PLUMBING • PIPING REPAIRS (SCHOOL-WIDE) • RESTROOM RENOVATION(S) a. BOY’S B1 AND B2 b. GIRL’S G1 AND G2 www.planetpsa.com

  5. THOMAS JEFFERSON MS – INFRASTRUCTURE GENERAL CONSTRUCTION SECURITY VESTIBULE • MEDIA CENTER FINISHES • LIBRARY FINISHES • PARTIAL ROOF REPLACEMENT • FLOORING • WINDOWS • DOORS AND KEYING • CEILINGS • PLASTER REPAIR • FIRE ALARM SYSTEM • SITE IMPROVEMENTS • a. PARKING b. BUS CIRCULATION www.planetpsa.com

  6. THOMAS JEFFERSON MS – INFRASTRUCTURE MECHANICAL GYM AIR CONDITIONING • CAFETERIA AIR CONDITIONING • WATER HEATER • UNIT VENTILATORS (SCHOOL-WIDE) • ELECTRICAL ELECTRIC UPGRADE CONTINUED • INTERIOR LED LIGHTING (SCHOOL-WIDE) • EXTERIOR LED SITE LIGHTING • PLUMBING • RESTROOM RENOVATION(S) a. BOY’S B1 b. GIRL’S G1 c. FACULTY F1 www.planetpsa.com

  7. LINCOLN ES – SITE www.planetpsa.com

  8. LINCOLN ES – CLASSROOM ADDITION AREA OF NEW ADDITION 5,170 SQFT www.planetpsa.com

  9. THOMAS JEFFERSON MS – SITE www.planetpsa.com

  10. THOMAS JEFFERSON MS – GYM ADDITION AREA OF NEW ADDITION 8,063 SQFT www.planetpsa.com

  11. COST ESTIMATES DEBT SERVICE INFRASTRUCTURE GROSS LOCAL AID THOMAS JEFFERSON MS $7,465,300 $2,297,210 $5,168,090 LINCOLN ES $6,325,400 $1,722,644 $4,602,756 SUB-TOTAL $13,790,700 $4,019,854 $9,770,846 ADDITIONS THOMAS JEFFERSON MS $3,739,000 $0 $3,739,000 LINCOLN ES $2,394,400 $0 $2,394,400 TOTAL $19,924,100 $4,019,854 $15,904,246 www.planetpsa.com

  12. THANK YOU. www.planetpsa.com