Pr Present Sta esent Status of tus of Ener Energy shar y share En Eng. g. B.M .M.U .U.S.B .S.Ban anda da DGM DGM-Renew enewable Ener ble Energy y De Development elopment & P & Perf erfor ormance mance Monit Monitoring oring Cey Ceylon lon Electr Electricit icity y Boar Board
Pr Present esent
Electr Electrifica ification tion le level el of of Sri Sri Lanka Lanka - 99% 99% Access Access to Elect to Electricit ricity y – 100% 100%
Ener Energy Consu y Consumptio mption P n Patter ttern un units per its per mont month h Househ Household old 0-30 30 1,323 1,323,112 ,112 31 31-60 60 1,615 1,615,724 ,724 61 61-90 90 1,49 1,495,9 5,939 39 91 91-12 120 0 746 746,588 ,588 121 121-18 180 0 536 536,385 ,385 over er 18 181 1 24 242,1 2,113 13 Tot otal al 5,95 5,959,86 9,861
Ca Capacit pacity(MW) y(MW) Mix and Ener Mix and Energy(MW y(MWh) h) Mix (1st J Mix (1st Januar anuary y 2019) 2019) Capacity Share (MW ) Thermal rmal 2064 2064 Hyd ydro ro 51% 51% 1398 1398 Energy Share (GWh) 34% 34% Thermal rmal Hyd ydro ro 8981 8981 5195 5195 58% 58% 33% 33% ORE ORE 609 609 15% 15% Total Capacity : 4071MW ORE ORE 1422 1422 Plant Name Capacity (MW) 9% 9% * Mini Hydro Power 399.4 Wind Power 128.4 Biomass-Agricultural & Industrial Waste Power 13.1 Total Generation : 15598GWh Biomass – Dendro Power 17 Solar Power * 51.4 Note: * Excluding Rooftop Solar(As at 1 st January 2019, 170MW)
Futur Future
Tar argeted geted Ca Capacity(MW) pacity(MW) Mix by Mix by Year ear 2030 2030 15% 30% Coal 25% LNG Hydro 30% Other firm Energy Approved By Cabinet of Ministers in May 2018
Planned Planned Ca Capacity(MW) pacity(MW) Mix and Mix and Ener Energy(MW y(MWh) h) Mix Mix in in Year 20 ear 2022 22 Energy Share (GWh) 2022 Capacity Share (MW) 2022 Hyd ydro ro Thermal Thermal rmal Hydro 4405 4405 2727 11904 11904 1611 22% 22% 47% 58% 58% 28% ORE ORE 4022 4022 20% 20% ORE 1453 25% Total Generation : 20331GWh Total Capacity : 5791MW
Planned Planned Ca Capacity(MW) pacity(MW) Mix and Mix and Ener Energy(MW y(MWh) h) Mix Mix in in Year 20 ear 2030 30 Energy Share (GWh) 2030 Capacity Share (MW) 2030 Hyd ydro ro Therma rmal Hyd ydro ro 4945 4945 2211 2211 18680 18680 17% 17% Therma rmal 26% 26% 62% 62% 3789 3789 45% 45% ORE ORE 6365 6365 21% 21% ORE ORE 2453 2453 29% 29% Total Generation : 29990GWh Total Capacity : 8453MW
ojected Futu Future De e Developme elopment nt Of Of ORE ORE Pr Projected Projected Future Development Of ORE 3000 TOTAL ORE CAPACITY(MW) 2500 2000 1500 1000 500 0 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 YEAY Mini Hydro Wind Biomass Solar (MW) (MW) (MW) (MW)
Capacity Mix of Ca pacity Mix of ORE ORE Actual Capacity Share (MW) 2018 Planned Capacity Share (MW) 2018 Mini Hydro Solar Rooftop Mini Hydro 344 170 Solar 399.4 210 Solar 51.3 Biomass Biomass 30.1 39 Wind 128.4 Wind 144 Total Capacity : 779.2MW Total Capacity : 737MW
Ca Capacit pacity Mix of y Mix of ORE ORE Planned Capacity Share (MW) 2022 Planned Capacity Share (MW) 2030 Mini Hydro Mini Hydro 474 Solar 394 471 Solar 1009 Biomass 59 Wind 894 Biomass Wind 99 539 Total Capacity : 1463MW Total Capacity : 2476MW
Demand Demand Gr Growth wth Electricity Demand Growth Peak Demand Growth 35000 5000 4500 30000 4000 25000 3500 Electricity Demand (GWh) Peak Demand (MW) 3000 20000 2500 15000 2000 1500 10000 1000 5000 500 0 0 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Energy Demand Peak Demand
Load Curve 2018
Planned Planned Pr Projects to ojects to be Implemented be Implemented in in the the Futur Future NAME OF THE PROJECT CAPACITY TYPE 1 Pooneryn Solar Park 130MW BOO 2 Pooneryn Wind Park 240MW BOO 3 Siyambalanduwa Solar Park 100MW BOO 4 Welikanda Solar plant with 30MW, 45MVh CEB ESS 5 150MW Solar plants 150MW in 20 GSS BOO 6 60MW Wind plants 60MW in 05 GSS BOO
Thank hank Y You ou