ha rtfo rd f ha rtfo rd f lo o d co ntro l syste m lo o d
play

Ha rtfo rd F Ha rtfo rd F lo o d Co ntro l Syste m lo o d Co ntro - PowerPoint PPT Presentation

Ha rtfo rd F Ha rtfo rd F lo o d Co ntro l Syste m lo o d Co ntro l Syste m Ove rvie w a nd Sta tus Ove rvie w a nd Sta tus Pre se nta tio n to Ma yo r Bro nin & the USACE Pre se nta tio n to Ma yo r Bro nin & the USACE Rive rfro


  1. Ha rtfo rd F Ha rtfo rd F lo o d Co ntro l Syste m lo o d Co ntro l Syste m Ove rvie w a nd Sta tus Ove rvie w a nd Sta tus Pre se nta tio n to Ma yo r Bro nin & the USACE Pre se nta tio n to Ma yo r Bro nin & the USACE Rive rfro nt Bo a tho use Rive rfro nt Bo a tho use Ha rtfo rd, Co nne c tic ut Ha rtfo rd, Co nne c tic ut Ma rc h 15, 2016 Ma rc h 15, 2016

  2. I I ntro duc tio ns ntro duc tio ns City o f Ha rtfo rd • • Unite d Sta te s Army Co rps o f E ng ine e rs (USACE ) • Rive rfro nt Re c a pture Othe rs • – F uss & O’ Ne ill, I nc . – GE I Co nsulta nts, I nc .

  3. Sha re d Re spo nsib ility Sha re d Re spo nsib ility

  4. I I mple me nting the Risk F mple me nting the Risk F ra me wo rk ra me wo rk Answer the Build Shared Tell the Story Basic Questions Solutions Today • Advise • Inventory • Risk Assessments Action Context Condition • Plan Path • Periodic • Communication Forward Inspections - National Levee Database - Risk Assessments - Plan IRRMs - Inspection Ratings - Sponsor Meetings - SJs & FRMs And Eligibility - Public Dialogue - SWIFs - 408s

  5. Ag e nda Ag e nda 1. Ba c kg ro und 2. Co nstruc tio n Wo rk Pe rfo rme d 3. Ma inte na nc e & Mo nito ring 4. SWI F Pro g ra m 5. Unde rse e pa g e Co nc e rns

  6. Ba c kg ro und Ba c kg ro und

  7. Co nne c tic ut Rive r Ba sin Co nne c tic ut Rive r Ba sin (Source: USACE)

  8. F F lo o d o f 1936 lo o d o f 1936 L L o o king No rth o ve r Dutc h Po int T o o king No rth o ve r Dutc h Po int T o ward Bulke le y Bridg e o ward Bulke le y Bridg e (Source: Connecticut History Online)

  9. F F lo o d o f 1936 lo o d o f 1936 F F ro nt Stre e t Ne ig hb o rho o d with Bulke le y Bridg e in the Distanc e ro nt Stre e t Ne ig hb o rho o d with Bulke le y Bridg e in the Distanc e (Source: Connecticut History Online)

  10. F F lo o d o f 1936 lo o d o f 1936 So ldie rs’ and Sa ilo rs’ Me mo ria l Arc h a nd Ca pito l Building So ldie rs’ and Sa ilo rs’ Me mo ria l Arc h a nd Ca pito l Building (Source: Connecticut Historical Society)

  11. F F lo o d Co ntro l Syste m Co nstruc tio n lo o d Co ntro l Syste m Co nstruc tio n Autho rize d b y the E me rg e nc y Re lie f Appro pria tio ns • Ac ts o f 1936, 1937, a nd 1938 • Co nstruc te d in se ve ra l pha se s b y the US Army Co rps o f E ng ine e rs fro m 1938 to 1981 Co nstruc tio n o f the d ike s a nd flo o dwa ll, 3 pump • statio ns, a nd Pa rk Rive r c o nduit b e g a n in 1938 a nd wa s c o mple te d in 1944 • T he la st po rtio ns (e .g ., F o lly Bro o k c o nduits, Pa rk Rive r c o nduit e xte nsio n, 2 pumping sta tio ns, a nd the a uxilia ry c o nduit) we re c o mple te d b y 1981

  12. F F lo o d Co ntro l Syste m Co nstruc tio n lo o d Co ntro l Syste m Co nstruc tio n E E a rthe n le ve e c o nstruc tio n so uth o f Bulke le y Bridg e (c irc a 1940) a rthe n le ve e c o nstruc tio n so uth o f Bulke le y Bridg e (c irc a 1940)

  13. F F lo o d Co ntro l Syste m Co nstruc tio n lo o d Co ntro l Syste m Co nstruc tio n F F lo o dwall c o nstruc tio n so uth o f Bulke le y Bridg e (c irc a 1940) lo o dwall c o nstruc tio n so uth o f Bulke le y Bridg e (c irc a 1940)

  14. Ha rtfo rd F Ha rtfo rd F lo o d Co ntro l Syste m: Ove rvie w lo o d Co ntro l Syste m: Ove rvie w Pro vide s pro te c tio n a g a inst flo o ding fo r a ppro xima te ly • 3,000 a c re s o f de ve lo pe d urb a n a re a Ma in c o mpo ne nts o f the syste m inc lude : • – 6.4 mile s o f e a rthe n dike s – 0.8 mile s o f c o nc re te flo o dwa lls – Six pumping sta tio ns – T wo dra ina g e b a sins – T hre e pre ssure c o nduits – An a uxilia ry c o nduit

  15. Ha rtfo rd F Ha rtfo rd F lo o d Co ntro l Syste m: Ove rvie w lo o d Co ntro l Syste m: Ove rvie w

  16. T T ypic a l E ypic a l E a rthe n Dike Cro ss-Se c tio n a rthe n Dike Cro ss-Se c tio n Gravel Access Road Hand Placed Riprap Vegetative Cover Free Draining River Sand Rock Toe Drain Select Impervious Material Blanket Drainage Ditch Native Material Lateral Drain Steel Sheet piling Composition Overview

  17. T T ypic a l E ypic a l E a rthe n Dike Cro ss-Se c tio n a rthe n Dike Cro ss-Se c tio n Infiltration Drainage Overview

  18. L L e ve e a nd F e ve e a nd F lo o d E lo o d E le va tio n Co mpa riso n le va tio n Co mpa riso n T op of L e ve e ~10 fe e t fre e boa r d for the 500- ye a r flood Pr oba ble Ma ximum (“Cata str ophic ”) flood 500- ye a r flood 100- ye a r flood

  19. F F lo o d o f 1984 lo o d o f 1984 Vie w lo o king no rth o f So uth Me a do ws Dike a nd Bra ina rd Airpo rt Vie w lo o king no rth o f So uth Me a do ws Dike a nd Bra ina rd Airpo rt

  20. Re c e nt F Re c e nt F lo o d E lo o d E ve nts ve nts Rive rfro nt Pla za Rive rfro nt Pla za

  21. Re c e nt F Re c e nt F lo o d E lo o d E ve nts ve nts Rive rfro nt Bo a t Ho use Rive rfro nt Bo a t Ho use

  22. F F E E MA F MA F lo o d Ma p lo o d Ma p

  23. F F E E MA Ac c re dita tio n MA Ac c re dita tio n Co mple te d in July 2009 a nd in e ffe c t fo r 10 ye a rs • Pre ve nts o wne rs within the le ve e pro te c te d a re a fro m • ha ving to o b ta in ma nda to ry flo o d insura nc e

  24. F F E E MA Ac c re dita tio n Pub lic Outre a c h MA Ac c re dita tio n Pub lic Outre a c h As part o f the F E MA • Ac c re ditatio n pro c e ss: – Se nt ma ile rs to a ffe c te d pro pe rty o wne rs – Co nduc te d a Pub lic I nfo rma tio n Me e ting (te le vise d o n pub lic a c c e ss) No te : Minima l re spo nse • fro m the pub lic

  25. L L e ve e Bre a c h Ana lysis e ve e Bre a c h Ana lysis Use d c o mpute r to o ls (Arc GIS & HE C-Ge o RAS) to simula te a le ve e b re a c h during a F E MA 100-ye a r flo o d in e a c h o f fo ur ne ig hb o rho o ds a nd Bre a c h L oc a tion de ve lo pe d ma ps sho wing po ssib le timing a nd e xte nts o f flo o ding

  26. E E me rg e nc y Ope ra tio ns Pla n Anne x me rg e nc y Ope ra tio ns Pla n Anne x Wo rke d with Ha rtfo rd • E me rg e nc y Ope ra tio ns Ce nte r (E OC) to pre pa re a F lo o d E va c ua tio n Pla n • Inc o rpo ra te d ma ps fro m le ve e b re a c h a na lysis • Ha rtfo rd E OC re c e ive input fro m va rio us o the r c ity a g e nc ie s

  27. Re g ula to ry Outre a c h Re g ula to ry Outre a c h Wo rke d with F E MA a nd the USACE during the 2009 • Ac c re ditatio n pro c e ss Re c e ive d c o st sha ring a ssista nc e fro m the State o f • Co nne c tic ut to fund pre vio us pro je c ts – Pro je c ts pe rfo rme d unde r CT DE E P o ve rsig ht • De ve lo pe d o utsta nding wo rking re la tio nships with the se a g e nc ie s

  28. Po litic a l Outre a c h & Gra nt F Po litic a l Outre a c h & Gra nt F unding unding Assiste d Re pre se nta tive Jo hn L a rse n a nd his sta ff • during a Ma rc h 2013 L e ve e to ur a nd pre ss e ve nt in a n a tte mpt to re c e ive fe de ra l funding fo r F lo o d Co ntro l Syste m impro ve me nts Pursuing a ll a vaila b le funding o ppo rtunitie s • – F E MA – No e lig ib le pro je c ts this c yc le – Co nne c tic ut I nstitute fo r Re silie nc e a nd Clima te Ada pta tio n (CI RCA) – Wa te r Re so urc e s De ve lo pme nt Ac t (WRDA)

  29. Co nstruc tio n Wo rk Co nstruc tio n Wo rk Pe rfo rme d Pe rfo rme d

  30. Ve g e ta tio n Cle a ring Ve g e ta tio n Cle a ring Be fore Be fore Afte r Afte r No rth Me a do ws Dike Ne a r Po lic e F No rth Me a do ws Dike Ne a r Po lic e F iring Ra ng e iring Ra ng e

  31. Anima l Burro w Re pa ir Anima l Burro w Re pa ir A po rtio n o f No rth Me a do ws Dike unde r re pa ir A po rtio n o f No rth Me a do ws Dike unde r re pa ir (sta ke s sho w b urro w lo c a tio ns) (sta ke s sho w b urro w lo c a tio ns)

  32. Ripra p Re pa ir Ripra p Re pa ir Re mo va l o f disturb e d ripra p Re mo va l o f disturb e d ripra p

  33. Dra ina g e Ditc h Re sto ra tio n Dra ina g e Ditc h Re sto ra tio n Be fore Be fore Afte r Afte r Dra ina g e ditc h No rth o f Hartfo rd L Dra ina g e ditc h No rth o f Hartfo rd L a ndfill a ndfill

  34. T T o e Dra in Re pa ir o e Dra in Re pa ir T T o e dra in c lo g ge d with se dime nt b e ing c le a ne d o e dra in c lo g ge d with se dime nt b e ing c le a ne d

  35. L L a te ra l Dra in Pipe Re pa ir a te ra l Dra in Pipe Re pa ir L L a te ra l dra in b e ing re pa ire d with HDPE a te ra l dra in b e ing re pa ire d with HDPE sle e ve sle e ve

  36. Co nc re te F Co nc re te F lo o dwa ll Re pa ir lo o dwa ll Re pa ir Re pa ire d flo o dwa ll ke ywa y ne a r MI Re pa ire d flo o dwa ll ke ywa y ne a r MI RA Po we rpla nt RA Po we rpla nt

  37. Auxilia ry Co nduit Se dime nt Re mo va l Auxilia ry Co nduit Se dime nt Re mo va l

  38. No rth & So uth Me a do ws Po nd Dre dg ing No rth & So uth Me a do ws Po nd Dre dg ing

  39. No rth & So uth Me a do ws Po nd Dre dg ing No rth & So uth Me a do ws Po nd Dre dg ing

  40. So uth Me a do ws Pump ing Sta tio n Re ha b So uth Me a do ws Pump ing Sta tio n Re ha b Uppe r L Uppe r L e ve l e ve l L L o we r L o we r L e ve l e ve l

Recommend


More recommend