people s assembly 12 april 2014 cllr m ha c k mmc eng ine
play

Peoples Assembly 12 April 2014 Cllr M Ha c k MMC: Eng ine e ring - PDF document

Peoples Assembly 12 April 2014 Cllr M Ha c k MMC: Eng ine e ring This Portfolio includes: Roads Storm Water Water Provision Sanitation Services Electricity Street Lights Mechanical Workshop Engineering


  1. People’s Assembly 12 April 2014

  2. Cllr M Ha c k MMC: Eng ine e ring This Portfolio includes: • Roads • Storm Water • Water Provision • Sanitation Services • Electricity • Street Lights • Mechanical Workshop

  3. Engineering Services Councillor Malcolm Hack MMC Mr Steph Coetzee Executive Director

  4. ina nc ia l Ye a r 2013/ 14 F

  5. Sicelo / Highbury Reservoir and Bulk Connections The Project entails Construction of a New 10Ml Reservoir and Bulk Water Connection to Sicelo with Connections to Walkers Fruit Farms, Highbury, Valley Settlements, Daleside and Henley on Klip. Total Value R90,000,000

  6. Sicelo / Highbury Reservoir and Bulk Connections Location Walkers Fruit Farms / Sicelo / Valley Settlement / Daleside etc. Ward Multiple Financial Year 2012/13 – 2016/17 Status Phase 1 contract awarded other at EIA stage

  7. Wa te r: Sic e lo We st Side

  8. Wa te r: Sic e lo Ea st Side

  9. Pipe Cra c king The Project entails the Installation of New Water Pipes in Henley on Klip & Highbury Areas Total Value : R8 Million Location : Henley on Klip & Highbury Ward : 4 & 5 Financial Year : 2013/14 Status : Work in progress

  10. Sa nita tion Portable Toilets for Informal Settlements 200 Installed in Boitumelo and Khayelitsha

  11. De De ur Stre e t L ig hting The Project entails Erection of Street Lights in De Deur Area Total Value : R1.6 million Location : Per Map Ward : 11 Financial Year : 2013/14 Status : Work to commence

  12. ig hting De De ur Stre e t L

  13. He nle y on Klip Stre e t L ig hting The Project entails Erection of Street Lights in Henley on Klip Total Value : R1 Million Location : Iffley Road Ward : 4 Financial Year : 2013/14 Status : Work to commence

  14. Ene rg y Sa ving s Proje c t The Project entails Replacement of Street Lights Luminaires with Energy Efficiency Lights Total Value : R9 Million Location : Midvaal Supply Area Ward : Various Financial Year : 2013/14 Status : Work commenced

  15. Ele c tric a l Ne twork The Project entails Upgrading of Networks Total Value : R3 Million Location : Midvaal Supply Area Ward : Various Financial Year : 2013/14 Status : Work in progress

  16. MIG Roa ds Proje c ts The Project entails Roads Identified – still to be done: • Meerkat Street • Bell Road side walk paving • Roads around Lakeside MPC: Mtwalume Mzume Bulolo

  17. Pha se 4 The Project entails Continuation of Loch Street between Junius and Galloway Streets Total Value : R10,000,000 Location : Loch Street Ward : 9 Financial Year : 2013/14 Status : Construction 80%

  18. Upg ra ding Inte rse c tions The Project entails the Upgrading of the Verwoerd / Mimosa Intersection Total Value : R3 million Location : Golf Park Ward : 14 Financial Year : 2013/14 Status : Work to commence

  19. 2014/15 Financial Year

  20. Bulk Ele c tric a l Ne twork The Project entails High Mast Lights & Bulk Network in Sicelo Total Value : R3.5 Million Location : Sicelo Ward : 8 & 10 Financial Year : 2014/15 Status : Work to commence

  21. De De ur Stre e t L ig hting The Project entails Erection of Street Lights in De Deur Area Total Value : R3 million Location : Per Map Ward : 11 Financial Year : 2013/14 & 2014/15 Status : Work to commence

  22. He nle y on Klip L ig hting The Project entails Erection of Street Lights in Henley on Klip Total Value : R1,5 Million Location : Ewelmy Road Ward : 4 Financial Year : 2013/14 & 2014/15 Status : Work to commence

  23. Se rvic e s in Sic e lo The Project entails the Upgrading of Sewer & Bulk Basic Services in Sicelo Total Value : R17.3 million Location : Sicelo to Rothdene Pump Station Ward : 8 & 10 Financial Year : 2014/15 Status : Work to commence

  24. Expa nsion Me ye rton WWT W The Project entails the Expansion of the Meyerton Waste Water Treatment Works Total Value : R90 million Location : Meyerton Ward : 10 Financial Year : 2014/15 Status : Work to commence

  25. Upg ra ding Inte rse c tions The Project entails the Upgrading of the Verwoerd / Mimosa Intersection Total Value : R3 million Location : Golf Park Ward : 14 Financial Year : 2013/14 & 2014/15 Status : Work to commence

  26. MIG Roa ds Proje c ts Roads Identified for 2014/15 Financial Year: • Swartwitpens Street • Tiger Street • Loerie Street • Indri Street • Oorbietjie Street • Makgota Street

  27. MIG Roa ds Proje c ts Roads Identified for 2014/15 Financial Year: • Bereng Street • Thoho ya Ndou Street • Khama Street • Mohapi Street • Peacock Street • Thornton Street