ODOT District 6 Brian Davidson, P.E., Planning and Engineering Nancy Burton & Breanna Badanes, Public Information Office April 2014
The North Side Fix 3 rd Most Congested in Ohio I-270 SR 315 US 23
The North Side Fix Project Estimated Construction Funding Phasing County--Route-Section PID Construction Ready Available Letter Cost F FRA-315-11.37 81738 Constructed B2 FRA-270-24.14 81737 Constructed C1 FRA-270-22.42 81739 Constructed B/B1 FRA-23-22.23 81746 $71.5 M 2013 2013 C FRA-270-21.67 81747 $42.6 M 2014 2020 D FRA-270-22.85 81748 $38.3 M 2014 2024 G* FRA-315-NB Ramp 81749 Future Future 270 270 3 rd Most Congested in Central Ohio
Existing: I-270 & US-23 (Looking Northeast) 270
The North Side Fix Adding Two US-23 NB Express Lanes Reconfigure Interchange from Full- Cloverleaf to Partial-Cloverleaf US-23 SB to SR-315 Construction starts Future US-23 SB to Summer 2013 I-270 WB (Project D) 270 Future I-270 WB to SR-315 CD
High Street Over I-270 Enhancements
Ramp Enhancements US-23 270 WORTHINGTON
Construction Progress
Construction Progress
Construction Progress
Traffic Switch
Construction Maintenance of Traffic Through Lanes Maintained Continuous Improvement • Loop Ramps Eliminated • Triple Left Turn Lane at US 23 & Campus View • New Cameras & Interconnect 270
Ramps Under Construction Loop Ramps to Close Late August (Estimate)
York Temple Dr., E. Campus View Blvd. and Dimension Dr.
WHAT’S NEXT? Estimated Timeline • Retaining Walls More than ½ Complete • I-270 east to US 23 south • I-270 west to US 23 north • Temporary Pavement Complete on US 23 • Shift Traffic • Close Left/Right Turns onto Campus View/Detour Dimension Drive • Digging for the Trench - APRIL
Project Website www.270-23.com
Traffic Cameras
Driving Thru Construction and Alternate Routes