SUM-76-5.53 Matchmaker ODOT District 4 Headquarters 2088 South Arlington Road Akron, OH 44306 January 31, 2019
Project Overview This project has 3 parts. Part 1 consists of the widening of I-76 between Central Avenue and the Kenmore Leg, as well as the reconstruction and reconfiguration of the East Ave./Wooster Rd./State St. interchange. This part also includes the removal of the bridge over Central Ave. and the replacement of the I-76 bridge over Wooster Rd. Part 1 Estimated Cost $22.6M
Project Site Plan – Part 1
Project Overview Part 2 consists of the resurfacing 1.79 miles of S.R. 619 in the City of Barberton from Elmwood St. to Hiram St. and from Harding Ave. to Lake Ave. This will also include some minor bridge work on 2 bridges along I-76, 1 bridge on I-277 and 3 bridges on S.R. 619. Part 2 Estimated Cost $1.2M
Project Site Plan - Part 2 (Resurfacing) Title Title Subtitle Date Subtitle Date
Project Site Plan – Part 2 (Bridge Work) Title Title Subtitle Date Subtitle Date
Project Overview Part 3 consists of the removal and replacement of the existing backwalls and approach slabs on a bridge along I-76 just north of the Kenmore Leg. Part 3 Estimated Cost $1.5M
Project Site Plan – Part 3 Title Title Subtitle Date Subtitle Date
Anticipated Project Schedule SUM-76-5.53 (PID 96670) • Sale Date: 05/02/19 • Award Date: 05/13/19 Title NOTE: This project has experienced delay in Federal Title Authorization Subtitle Date Subtitle Date
Anticipated Project Work Types CODE DESCRIPTION CODE DESCRIPTION 1 Clearing & Grubbing 34 Earth Retaining Structures 2 Building Removal 35 Drainage (culverts, misc.) 4 Roadway Excavation & Embankment 36 Guardrail/Attenuators 7 Soil Stabilization 37 Fence 8 Temp. soil erosion and sediment control 39 Maintenance of Traffic 9 Aggregate Bases 40 waterproofing 10 Flexible Paving 41 raised pavement markers 12 Rigid Paving 42 Signing 13 Pavement Planning, Milling, Scarification 43 Highway Lighting 19 Structure Removal 44 Traffic Signals-Standard 21 Level 2 Bridge 45 Pavement Markings 22 Level 3 Bridge 53 Piling 23 Reinforcing Steel Sealing of Concrete Surfaces with Epoxy or 24 Structural Steel Erection 57 non-epoxy Sealers 25 Stud Welding 26 Structural Steel Painting Expansion & Contraction Joints, Joint Sealers, 27 Bearing Devices
Roadway & Pavement Work Types 1 – Clearing and Grubbing 4 – Roadway Excavation and Embankment Construction 7 – Soil Stabilization 9 – Aggregate Bases 10 – Flexible Paving 12 – Rigid Paving Title 13 – Pavement Planning, Milling, Scarification Title 36 – Guardrail/Attenuators Subtitle 37 - Fence Date Subtitle Roadway & Pavement work Date Estimated Cost $6.4 M
Structure and Retaining Wall Work Types 19 – Structure Removal 21 – Level 2 Bridge 22 – Level 3 Bridge 23 – Reinforcing Steel 24 – Structural Steel Erection 25 – Stud Welding 26 – Structural Steel Painting 27 – Expansion & Contraction Joints, Joint Sealers, Bearing Devices Title 34 – Earth Retaining Structures 40 – Waterproofing Title 53 – Piling Subtitle 57 – Sealing of Concrete Surfaces with Epoxy Date or Non-Epoxy Sealers Structure work Subtitle Date Estimated Cost $11.5 M
Drainage and Erosion Control Work Types 8 – Temp. Soil Erosion and Sediment Control 35 – Drainage (Culverts, misc.) Title Title Subtitle Date Subtitle Drainage and Erosion Control Date Work Estimated Cost $1.2 M
Traffic Control, Signals, Lighting Work Types 41 – Raised Pavement Markers 42 – Signing 43 – Highway Lighting 44 – Traffic Signals, Standard 45 – Pavement Markings Title Title Subtitle Date Subtitle Traffic Control, Signals, Date Lighting Work Estimated Cost $1.2 M
Maintenance of Traffic Work Types 39 – Maintenance of Traffic Phases and Detours EMS Coordination Title Title Subtitle Date Subtitle Maintenance of Traffic Work Date Estimated Cost $2.6 M
Estimated Project Cost (Parts 1, 2 & 3) Total Estimated Project Cost Cost $25.3 M Title Title Subtitle Date Subtitle Date
Disadvantage Business Enterprise (DBE) • Contains the Proposal Note 013 - Disadvantaged Business Enterprise (DBE) Utilization Plan And Good Faith Efforts, updated 04/20/2018 • All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal . • DBE Certification Directory • http://www.dot.state.oh.us/Divisions/ODI/SDBE/Pa ges/DBE-Directory.aspx
Thank You for Attending
Recommend
More recommend