PID 93594 LUC-75-1.10 MATCHMAKER EVENT ODOT PROJECT 180277 Doug Rogers, P.E., Project Manager Mark Mondora, P.E., Area Engineer Lisa Washington, Northwest Regional Outreach Manager Mike Gramza, P.E., Capital Programs Administrator 1 | PID


  1. PID 93594 LUC-75-1.10 MATCHMAKER EVENT ODOT PROJECT 180277 Doug Rogers, P.E., Project Manager Mark Mondora, P.E., Area Engineer Lisa Washington, Northwest Regional Outreach Manager Mike Gramza, P.E., Capital Programs Administrator 1 | PID 93594 LUC-75-1.10 - ODOT District Two

  2. PID 93594 LUC-75-1.10 PROJECT 180277 KEY DATES • Project Sale May 17, 2018 • Project Award May 28, 2018 • Estimated Completion Date June 30, 2022 2 | PID 93594 LUC-75-1.10 Modification 4 Resolution - ODOT District Two

  3. PROJECT OVERVIEW 3 | PID 93594 LUC-75-1.10 - ODOT District Two

  4. MAJOR WORK ON PROJECT o Widen IR 75 to 3 lanes in both directions – South Avenue to north of Dorr Street. o Replacement of pavement on the Anthony Wayne trail from City Park to the new downtown gateway o Change Anthony Wayne Trail Interchange on-ramps to left entrances. o Reconstruction of 9 ramps o Construction of 10 bridge (3 overhead bridges) 4 | PID 93594 LUC-75-1.10 - ODOT District Two

  5. SUMMARY OF PROJECT MATERIALS Roadway o 38,800 CY of Asphalt Base, 7,153 CY of Asphalt Concrete Surface, 7,241 CY of Asphalt Concrete Intermediate. o 17,243 SY of 13.5” Non-reinforced Concrete pavement, Class QC1. o 124,075 SY of Cement Stabilization. o 7564 FT of Curb o 7511 FT of Single-Slope Concrete Barrier 5 | PID 93594 LUC-75-1.10 - ODOT District Two

  6. SUMMARY OF PROJECT MATERIALS Structures o 6,475,269 LB Reinforcing Steel o 71,408 FT 12” Cast-in-Place Reinforced Concrete Piles o 28,290 CY of Class QC1 and QC2 Concrete for Bridges o 18,756 FT Drilled Shafts 6 | PID 93594 LUC-75-1.10 - ODOT District Two

  7. SUMMARY OF PROJECT MATERIALS Structures o 3999 SY of Reinforced Concrete Approach Slabs o 2982 SF of MSE Walls o 34,053 SY of Epoxy-Urethane Sealer o 2173 SY of Non-Epoxy Sealer 7 | PID 93594 LUC-75-1.10 - ODOT District Two

  8. SUMMARY OF PROJECT MATERIALS Misc. Work o 2982 SF of MSE Walls o 33,665 FT Conduit o Vandal Fence o Sidewalk/bike paths o Highway lighting o Sewer work o Traffic Signal 8 | PID 93594 LUC-75-1.10 Modification 4 Resolution - ODOT District Two

  9. DISADVANTAGED BUSINESS ENTERPRISE (DBE) DBE Goal – 12% o Contains the Proposal Note 013-Disadvantaged Business Enterprise (DBE) Utilization Plan and Good Faith Efforts updated 07/21/2017 o All bidders shall submit a DBE Utilization Plan at the time of bid 9 | PID 93594 LUC-75-1.10 - ODOT District Two

  10. DISADVANTAGED BUSINESS ENTERPRISE (DBE) o The plan should set forth specific information demonstrating how bidder will achieve DBE Goal o Identify DBE Certified firms: http://www.dot.state.oh.us/Divisions/ODI/SDBE/ Pages/DBE-Directory.aspx 10 | PID 93594 LUC-75-1.10 - ODOT District Two