MONTEREY PENINSULA WATER SUPPLY PROJECT & HISTORICAL CONTEXT 1
MONTEREY WATER SUPPLY 1880 – present SEASIDE BASIN CARMEL RIVER WATERSHED 2
1916-2016 CAL AM WATER PRODUCTION MAIN SYSTEM BY SOURCE 3
AUGUST SEPTEMBER JUNE 1977 1992 1995 Severe drought Drought SWRCB issues order 95-10 • Inflow was approximately 4% of the long-term average APRIL AUGUST OCTOBER DECEMBER 2012 1997 2009 2010 MPWSP application CPUC approves Cease and Desist Steelhead listed filed with CPUC Order Regional Desal project as “threatened” 4
Monterey Peninsula Water Supply Project (MPWSP) DESALINATION 6,252 AF ASR GWR 1,300 AF 3,500 AF aquifer storage ground water and recovery replenishment 5
WATER SOURCES TODAY/TOMORROW PACIFIC GROVE 1% SAND CITY 2% SEASIDE BASIN 5% HISTORIC WATER SOURCES FUTURE WATER SOURCES 6
PROJECT OVERVIEW Project Component Cost (M) Cost (M) 9.6 MGD 6.4 MGD Desal Plant $124 $115 Pipelines, Terminal $128 $128 Reservoir & BPS Intake Wells & Return $86 $79 Systems Total Cost $338 $322 7
SLANT WELL PROFILE 8
WATER PROJECT KEY BENEFITS RESTORES CARMEL RIVER REPLENISHES SEASIDE BASIN MINIMIZES OCEAN LIFE IMPACT SUBSURFACE INTAKES DIFFUSED OUTFALL SEEKS GREEN ENERGY SOURCES 9
PUBLIC PARTICIPATION Governance Public investment – reduce cost Environmental – slant wells, diffused outfall Salinas Basin – aquifer modeling, Hydro Working Group Consensus – 16-party settlement CALIFORNIA AMERICAN WATER CITIZENS FOR PUBLIC WATER CITY OF PACIFIC GROVE COALITION OF PENINSULA BUSINESSES COUNTY OF MONTEREY DIVISION OF RATEPAYERS ADVOCATES LANDWATCH MONTEREY COUNTY MONTEREY COUNTY FARM BEREAU MONTEREY COUNTY WATER RESOURCES AGENCY MONTEREY PENINSULA REGIONAL WATER AUTHORITY MONTEREY PENINSULA WATER MANAGEMEN DISTRICT MONTEREY REGIONAL WATER POLLUTION CONTROL AGENCY PLANNING AND CONSERVATION LEAGUE SALINAS VALLEY WATER COALITION SIERRA CLUB SURFRIDER FOUNDATION 10
MPWSP SCHEDULE MPWSP An Anticipa pated S d Sche hedu dule MPWSP Anticipated Schedule 2016 2017 2018 2019 2020 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J 12/31/16 CDO Milestone 9/30/17 CDO Milestone 9/30/18 CDO Milestone ! 9/30/19 CDO Milestone ! CPUC GWR & MRY Start Construction ! ! CPCN Approval of MPWSP Start Desal Construction Pipeline Approval MRY Pipeline Approval EI EIR R & EI EIS / C CPCN / C CDP On March 10, 2016, CPUC released EIR/EIS schedule changes which are CPUC Decision on Final EIR/EIS DEIR End of public CCC CDP reflected in this schedule. GWR/Pipeline EIR/EIS Approval Release review period Decision and CPCN Sept 2016 Sept. 25 Jan 13 Feb 27 Q1-Q2 2018 Nov. 8 This schedule is based on our best GWR estimate as of 7/5/2017. Start-up Window GW GWR Q2-Q3 2018 Permitting, Design & Construction Mo Monterey P Pipelin peline a and A d ASR P Pump S p Statio ion GWR Design/Permitting Construction Water Available to System CPUC Approved Pipeline in-service MRY Pipeline & PS providing enhanced ASR capacity Sept. 2016 December 2017 Start Construction Desalination Facilities Q2-Q3 2018 Commissioning & Start- up Desalin linatio ion F n Facilit ilities ies Window Design & Permitting Activities Construction Q4 Q1 2019 2020 Note: The schedule is based on the information and assumptions available at time of update and is accurate to +/-6 months. 11
QUESTIONS 12