melissa isd
play

Melissa ISD Campus Capacity Study AGENDA MISD Facility Visioning - PowerPoint PPT Presentation

DECEMBER 17, 2015 Melissa ISD Campus Capacity Study AGENDA MISD Facility Visioning Questions Enrollment / Capacity Analysis MRI / MMS Task Force Comments Recommended Option for Discussion Appendix Intent of Study This study is an


  1. DECEMBER 17, 2015 Melissa ISD Campus Capacity Study

  2. AGENDA MISD Facility Visioning Questions Enrollment / Capacity Analysis MRI / MMS Task Force Comments Recommended Option for Discussion Appendix

  3. Intent of Study • This study is an analysis of capacity vs projected enrollment only and includes Early Education through 12 th grade. • It does not include the MISD Administration building or other programs located at off campus locations (bus barn, etc). • MISD may want to pursue a more comprehensive study to include all ISD programs and facilities in order to make sure the best solution is considered / implemented. • MISD may have the option to divest or re-purpose existing facilities as they become costly to maintain and/or the program is better located at a different facility. • MISD will need to develop an interim/short-term plan to accommodate the needs prior to new facilities opening.

  4. MISD Facility Visioning Questions • General Questions: • What is the “classroom of the future” for each school (elementary, intermediate, middle, high)? • What are some characteristics that would maximize the student experience and potential? • What are some characteristics that would diminish the student experience and potential? • What facilities/campuses need improvements regardless of enrollment / capacity issues? • Is there a desire to maintain an enrollment maximum cap at each campus? • What is the condition and long range plan of the off-campus building(s)? • Is there value to relocating MISD Administration on one of the campuses? • What other programs are located off-campus (Special Education at Bus Barn, other?)

  5. MISD Facility Visioning Questions • HME • Did the original plan of HME have a “future expansion phase” already designed? • Is the design of HME something that should be copied for future elementary schools? • How does HME’s classrooms/layout compare to the “classroom of the future” for elementary school grades? • MRI & MMS • What is the condition of the infrastructure of the MRI & MMS buildings? • What are the deferred maintenance issues with the campus? • How does MRI and MMS’s classrooms/layout compare to the “classroom of the future” for intermediate/middle school grades? • MHS • Did the original plan of MHS have a “future expansion phase” already designed? • How does MHS’s classrooms/layout compare to the “classroom of the future” for high school grades? How does it compare to middle school grades?

  6. Enrollment / Capacity Assumes existing grades remain at each campus • Harry McKillop Elementary • Key Stats: • Year Built: 2009 (verify) Currently provides EE through 3 rd Grade • • 2015 Enrollment: 714 • Potential Capacity: 788 • Melissa Ridge Intermediate • Key Stats: • Year Built: _____ (verify) Currently provides 4 th through 6 th Grade • • 2015 Enrollment: 476 • Potential Capacity: 510

  7. Enrollment / Capacity Assumes existing grades remain at each campus • Melissa Middle School • Key Stats: • Year Built: ____ (verify) Currently provides 7 th through 8 th Grade • • 2015 Enrollment: 329 • Potential Capacity: 645 • Melissa High School • Key Stats: • Year Built: 2007 (verify) Currently provides 9 th through 12 th Grade • • 2015 Enrollment: 591 • Potential Capacity: 787

  8. Overall MISD Enrollment / Capacity • According to the capacity and enrollment data received, MISD has approximately 620 desks vacant (excess (2,203) capacity) in 2015 • By 2020, MISD will be short 613 desks (613) for students +620 • By 2025, MISD will be short 2,203 desks for students

  9. MRI & MMS Task Force Comments • Campus Improvement Ideas: • Campus Security • Security Presence / Identity • Building Entrance / Lobby / Campus Identity • Campus Exterior Lighting • Campus Connectivity (internal vs exterior awnings) • Improved playgrounds • Consolidated (MRI/MMS) entrance to Cardinal Drive • Additional bathrooms • Library • Music Department • Landscaping / Grounds Improvements • Separate bus pick-up/street access • Storage • Student Storage / Lockers

  10. Preliminary Options for Discussion Options not mutually exclusive…may choose elements from each option to form recommended option Option One Option Two Option Three Option Four • • • • Elementary School HME (EE – 4 th ) HME (EE – 2 nd ) HME (EE – 4 th ) HME (EE – 2 nd ) • • New Elementary MRI/MMS (EE – (EE – 4 th ) 4 th ) MRI/MMS (5 th – 6 th ) MRI/MMS (3 rd – 4 th ) MHS (5 th – 6 th ) MHS (3 rd – 5 th ) • • • • Intermediate School MHS (7 th – 8 th ) MHS (5 th – 8 th ) • • • • Middle School New Middle School New Middle School at New High School at New High School Campus (7 th – 8 th ) Campus (6t h – 8 th ) High School • • • • New High School New High School New High School New High School (9 th – 12 th ) (9 th – 12 th ) (9 th – 12 th ) (9 th – 12 th )

  11. Option One: Plan for 2020 – RECOMMENDED PLAN • Campus Improvement Ideas: • HME Grades: Early Education (EE) through 4 th Grade • • No action required • New Elementary School Grades: Early Education (EE) through 4 th Grade • • New Construction – estimated 900 student campus (sized for 2025 projected enrollment) • MRI / MMS Grades: 5 th through 6 th Grade • • Consider Task Force List of Improvements (existing capacity may adjust to accommodate improvements) • MHS Grades: 7 th through 8 th • • Utilize recent sports facility upgrades for middle school athletics • No action required • New High School Grades: 9 th through 12 th Grade • • New Construction – estimated 2,000 student campus

  12. Option One: Plan for 2025 – RECOMMENDED PLAN • Campus Improvement Ideas: • HME Grades: Early Education (EE) through 4 th Grade • • No action required • New Elementary School Grades: Early Education (EE) through 4 th Grade • • No action required • MRI / MMS Grades: 5 th through 6 th Grade • • No action required • MHS Grades: 7 th through 8 th • • Expansion of capacity by 113 • New High School Grades: 9 th through 12 th Grade • • No action required What excess capacity should be planned for?

  13. Campus Improvement Concepts • The following improvement concepts are for discussion purposes only. • These concept sketches are not recommendations, each campus needs to be further studied including but not limited to the following: • Utility locations and capacities; • Engineering / infrastructure condition; • Building/architecture condition; • Hazardous material inspection (asbestos, etc); • Review of existing layout; • Other campus specific needs; and • Long-term vision of each campus.

  14. HME Concept for Discussion • Campus Improvement Ideas: • HME has a natural expansion zone to the north of the existing 3 rd grade hallway, across from the gym. • This expansion zone would likely max-out the campus as the support areas (cafeteria, gym, etc) will begin to be undersized.

  15. MRI & MMS Concepts for Discussion • Campus Improvement Ideas: • Potential program of expansion zone (shown as red and tan buildings on diagrams) • Expansion needs will need to be defined and • New Lobby further investigation required to determine the appropriate size, location of any recommended • On Site Campus Security activity on the existing campus • Cameras • Potential additions between Competition Gym • Lockers and MRI and MMS • Library • Consolidated Main Entrance for both MRI and • Music Department MMS from Cardinal Drive • Internal connectivity of campus • Concept should be further developed once a • Improved playgrounds (shown as basketball long-range vision for the campus is defined (ie. MRI/MMS campus will be utilized as a 5 th and 6 th courts) grade campus). • Potential additional classrooms • Special Education • Opportunities to bring off-campus programs to campus

  16. MRI & MMS Concepts for Discussion Additional Parking Additional Classrooms Relocated Cafeteria Play Area / Outdoor Learning / Outdoor Courts Dining Gym 2 Level Expansion: • 1 st Floor: Main Entrance, Lobby, Administration, Security • 2 nd Floor: Art, Band, Library

  17. MRI & MMS Concepts for Discussion Staff Parking Bus Entrance Additional 5th Grade Hallway Relocated Classrooms Drama / Cafeteria Play Area / 6 th Grade Lockers MP Gym Bus Staging 5 th Grade Lockers Outdoor Learning / Courts Outdoor Dining 6th Grade Amphitheater Bus Exit Outdoor Amphitheater Concept MRI/MMS Main Entrance

  18. MRI & MMS Concepts for Discussion

  19. MRI & MMS Concepts for Discussion Room Class Room Class 1 4 Room Class Pod 3 Group Activity Area 3 Existing Courtyard Room (Playground, Activity Courts, Outdoor Learning) Class 2 New 5 th Grade Student Corridor with lockers Teacher Teacher Teacher Teacher Offices Existing Melissa Ridge Pod 1 Group Offices Offices Pod 2 Group Offices Activity Area Activity Area Restrooms Intermediate Layout Class Class Class Class Class Class Class Class Room Room Room Room Room Room Room Room 1 2 3 4 1 2 3 4 Concept for Renovation of Melissa Ridge Intermediate Layout

Recommend


More recommend