lng in deventer
play

LNG IN DEVENTER JOOST DE RUIJTER 10 oktober 2019 CLEANER AND MORE - PowerPoint PPT Presentation

LNG IN DEVENTER JOOST DE RUIJTER 10 oktober 2019 CLEANER AND MORE SUSTAINABLE Transition from fossil to sustainable Air pollution Global warming Scarcity of resources 2 GLOBAL ENERGY DEMAND BY 2035, THE WORLD WILL USE ENERGY AT A RATE OF


  1. LNG IN DEVENTER JOOST DE RUIJTER 10 oktober 2019

  2. CLEANER AND MORE SUSTAINABLE Transition from fossil to sustainable Air pollution Global warming Scarcity of resources 2

  3. GLOBAL ENERGY DEMAND BY 2035, THE WORLD WILL USE ENERGY AT A RATE OF ABOUT 23 TERAWATTS, UP FROM ABOUT 15-17 TERAWATTS TODAY. 20,000 2,2 0,5 Millions of tonnes of oil equivalent Transport 13,6 Households 14,000 33,1 Industry 8,000 Services 25,3 2,000 Agriculture and forestry 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 25,4 Other OECD Non-OECD World Energy demand in the rich OECD countries is flat and all future Transport is using 33,1% of today energy increases will come exclusively from other parts of the world Source: Goodall, Chris. The Switch 3

  4. AVAILABILITY OF CLEAN ENERGY SOLAR WILL BE THE CENTRAL PROVIDER OF THE WORLD’S POWER NEEDS In 54 minutes enough energy reaches earth to meet one year of the world’s total energy needs Wind Biomass Wave Hydro 870 90 7 7 A clear winner: annual global energy capacity for solar (90,000 TW), Solar wind (870 TW), biomass (90 TW), wave (7 TW) and hydro (7 TW). 90,000 terawatts 4 Source: Goodall, Chris. The Switch

  5. WE WILL DRIVE ON THE SUN! BUT THERE IS NO BIG BANG Local air quality Diesel Bio Diesel GTL Diesel Petrol Gas s hybri rid hybri rid LNG CNG BIO BIO LNG CNG Grey Grey H2 H2 EV EV EV H2 H2 Fossil Renewable 0-emission 5

  6. CLEAN TRANSPORT CLEAN AIR FOR CITY AND CO2 REDUCTION FOR CLIMATE Sustainable Zero emission Diesel clouds Clean air - NOx CO2 - CO2 & NOx BIO Diesel CNG / LNG H2 / EV CNG / LNG Local Gas network infrastructure/supply Biomass Green Electric Infrastructure 6

  7. H2 CNG EV LNG

  8. 140+ CNG STATIONS FR OUR TARGET FOR 2022 IS DE 450+ OPERATED SITES ACROSS EUROPE BE NL o Public stations: 81 in NL • 34 in DE • 12 in BE • 1 in FR • PitPoint.CNG o Dedicated stations: Buses • T eso (ferry to T exel - NL) • Waste Management • T axi companies • Canal tour boats in Amsterdam (NL) •

  9. H2 (HYDROGEN) REFUELLING STATIONS OPERATIONAL: ANTWERP (BE), DELFZIJL (NL), HELMOND (NL), ARNHEM (NL), MOBILE H2 STATION (NL, BE). PLANNING: 3 OTHER LOCATIONS (NL) PitPoint.H2 DELFZI FZIJL JL (NL) ANTWERP RP (BE) 9

  10. BIOMETHANE PRODUCTION PitPoint.Bio 10

  11. PUBLIC EV CHARGE POINTS >2.000 CHARGERS NL/BE PitPoint.EV 11 INAUGUR GURATIO TION N OF FIRST ST CHARGE E POINT NT IN BRUSS SSELS ELS (BE)

  12. LNG REFUELLING STATIONS ROAD: 5 OPERATIONAL (NL, BE), 10 PLANNING (NL, BE, DE). SHIPPING: 1 REALISATION (DE) LNG BUNKERING KERING STATI TION ON COLOGNE E (DE) PitPoint.LNG 12

  13. LNG

  14. LNG IN SNELLE OPMARS IN EUROPA MAAR… A recent critical article by Transport&Environment was 'blindly' adopted by various media. Selective and creative use was made of TNO reports on how the emissions of LNG trucks compare to those of diesel trucks. The conclusions of T&E's report are not in line with the available test results. Several more recent studies both nationally and internationally more than demonstrate the benefits of LNG for climate and air quality. 26 februari 2020 14

  15. WHY LNG FACTS Clean: n: • Particulate matter: 93% reduction relative to Euro VI norm • NOx: 38% reduction relative to Euro VI norm Sustai ainabl nable: • CO 2 : 10% - 20% reduction relative to diesel (and up till 100% with bio-LNG) Pric ice: Cheaper than diesel • Lower er noise e level els 72 dBA relative to 85 dBA for an ordinary diesel truck • 26 februari 2020 15

  16. LNG REFUELLING INFRASTRUCTURE

  17. THE NETHERLANDS 26 LNG REFUELLING LOCATIONS PitPoi oint.LNG: nt.LNG: • 4 operational (Zwolle, Den Hoorn, Sevenum & Roosendaal) • 1 in preparation (Deventer) Others: • Shell: 7 • Rolande: 12 26 februari 2020 17

  18. BELGIUM 12 LNG REFUELLING LOCATIONS PitPoint. int.LN LNG: G: • 1 operational (Rekkem) • 1 under construction • 2 in planning (2020-2021) Other er: • Shell: 4 • Romac: 2 • Drive Systems: 3 • Transport companies (Remitrans, Jost, Vincent Logistics) 26 februari 2020 18

  19. GERMANY 7 LNG REFUELLING LOCATIONS, VARIOUS UNDER CONSTRUCTION PitPoi oint.LNG: nt.LNG: • 5 in planning (2020-2021) Other: • >40 in planning (11 different providers) 26 februari 2020 19

  20. PITPOINT LNG LOCATIONS ZWOLLE - 2012 26 februari 2020 20

  21. PITPOINT LNG LOCATIONS DEN HOORN – DEC 2017 26 februari 2020 21

  22. PITPOINT LNG LOCATIONS SEVENUM/VENLO – JAN 2018 26 februari 2020 22

  23. PITPOINT LNG LOCATIONS ROOSENDAAL – MAY 2018 26 februari 2020 23

  24. PITPOINT LNG LOCATIONS REKKEM – APRIL 2019 26 februari 2020 24

  25. LNG FOR INLAND SHIPPING

  26. PitPoint’s multifuel bunkering station at Duivelseiland as part of the Clean Energy HUB Februari 2016

  27. LNG BUNKERING STATION COLOGNE Modular ular develo lopme pment nt • Fixed bunkering station, • Expand station gradually with other fuels • On long term supply with bunker barge Open en acce cess ss LNG NG bunk nkering ering stat ation ion • Bunkering fee for use of the station • Open for all customers • Customer can bring its own LNG Full l servic ice • Co-operation with partner for maritime supplies

  28. LNG BUNKERING STATION COLOGNE 26 februari 2020 28

  29. THE LNG STATION

  30. LCNG INSTALLATION 30

  31. LNG INSTALLATION MAIN COMPONENTS LNG offload LNG storage tank N2 tank 31 LNG pump On the fly saturation LNG dispenser

  32. LCNG INSTALLATION LNG storage tank LCNG pump Evaporator 32 Odorizer CNG storage CNG dispenser

  33. LNG IN DEVENTER A1 BUSINESS PARK Permitting procedure ongoing Permit is expected to be received by the end of this year Long lead items and realization aprox. 9 months Planned to be operational by the end of the summer 2020 (provided the permitting procedure goes smoothly) 26 februari 2020 33

  34. WAT KOST LNG TRANSPARANTE PRIJSVORMING Breakdown pump price LNG • TTF 1-0-1 Gate Rotterdam month ahead • Supplier fee • Loading fee • Transport fee • Accijns • Marge Actual and historical prices can be found on our website: https://www.pitpoint.nl/wat-kost-lng/ 26 februari 2020 34

  35. EXCISE DUTY NEW COMPENSATION SCHEME From 1 January 2020 to 1 January 2022. Internet consultation ended yesterday. Compensation amounts to 18.75 euro cents per kilogram (excluding VAT) and is directly included in the pump price. From 2022 onwards: blending obligation will be increased to 20% in 20230 (REDII). This offers opportunities for Bio-LNG resulting from the fermentation of waste streams, without competing with the food chain. Excise duty Germany: 18.4 cents until 2026 frozen. Also no Maut (toll) until 2021! Excise duty Belgium: 0 cents! 26 februari 2020 35

  36. LNG VEHICLES WIDELY AVAILABLE Iveco (400 en 460 PK) Scania (340 en 410 PK) Volvo (420 en 460 PK) 26 februari 2020 36

  37. REFUELING LNG Fuel station operation: No standard in Europe yet. Training mandatory/required Use of Personal Protective Equipment Virtual training possible: try it yourself! 26 februari 2020 37

Recommend


More recommend