I-2 & I-69C INTERCHANGE PROPOSED IMPROVEMENTS Public Meeting June 14, 2018 Public Meeting Agenda Welcome me & & Introdu ductions Octavio Saenz TxDOT Public Information Officer Technic ical al P Prese sentat atio


  1. I-2 & I-69C INTERCHANGE PROPOSED IMPROVEMENTS Public Meeting June 14, 2018

  2. Public Meeting Agenda • Welcome me & & Introdu ductions Octavio Saenz – TxDOT Public Information Officer • Technic ical al P Prese sentat atio ion Paul Voiles, PE, PTP – Consultant Project Manager (Binkley & Barfield, Inc.) • Proje ject S Schedu dule • Public ic C Comme mment • Adjo djournment 3

  3. Public Meeting Purpose • Encourage and maintain effective communication with the public • Describe recommended preferred alternative • Follow an important step in the environmental process • Receive public input and comments 4

  4. Provide Your Comments Sign up to speak tonight • Leave comments at registration table tonight • Mail or drop off comments: • TxDOT P Phar harr D Dist istrict Attn: R Robi bin G n Gel elston 600 W 600 W. I Int nter erstate 2 Pharr, T Ph TX 785 78577 Fax comments to (956) 702-6110 • Email comments to Robin.Gelston@txdot.gov • Visit www.txdot.gov and search “I-2 and I-69C” to view this • presentation and provide comments online Comments must be received or postmarked by Friday, June 29, 2018 • Comment responses will be developed and posted to the TxDOT • website 5

  5. Provide Your Comments To view project information, schedule an appointment with: Eduardo Saenz, PE TxDOT Pharr District Office 600 W. Interstate 2 Pharr, TX 78577 (956) 702-6170 Eduardo.Saenz@txdot.gov 6

  6. Project Information Pr Project Lim imits Interstate 2 2 (I (I-2)  From 2 nd Street in McAllen to FM 2557 (Stewart Rd) in San Juan Interstate 69C (I (I-69C)  From Nolana Loop to I-2 in Pharr Cost E Estimat ate  Design Build – $320 Million 7

  7. Project Purpose and Need What problems are we trying to address?  Increased congestion  Lack of mobility Project  Increased accident rates  Operational improvement Purpose What are we trying to do? and Need  Reduce travel time  Improve mobility  Improve safety  Improve traffic operations 8

  8. Existing Facility  Fo Four separ arat ate 1-lan ane di direct connector bridges dges – Each bridge is 32’ wide: • One 14’ lane • 10’ outside shoulder • 6’ inside shoulder • 1’ concrete barrier on each side  1-lane d direct ct connect ctor ors exper erien ence e sever ere e conge gestion du during p pea eak commuting g per eriods  On On and d off ramp mp spacing g does es not meet current standar ards cau ausin ing ad additional al congestion 9

  9. Proposed Facility  Fo Four separ arat ate 2-Lan ane di direct connector bridges dges – Each bridge is 40’ wide: • Two 12’ lanes • 4’ inside shoulder • 10’ outside shoulder • 1’ concrete barrier on each side  Rec econfigu gure on and d off ramps s to optimize mobil ility  Frontage ge Road i d imp mproveme ments an and turnaroun unds s to further er increas ase mobility 10

  10. Sugar Road Overpass  Sugar ar R Road ad Ov Overpass Removal al – Overpass is too close to the new direct connectors on the west side – Improved main lane operations – Frontage Road operational improvements will increase mobility – Improve Safety 11

  11. Braided Ramps Brai aided ram amps al allow spac acing b between ram amps to meet current s stan andar ards 12

  12. Braided Ramps Propose sed Locati tions: ns:  I-2 westbound between Jackson Road and Jackson Avenue  I-2 eastbound between Veterans/I Road and Raul Longoria/FM 1426  I-2 westbound between Veterans/I Road and Raul Longoria/FM 1426 Proposed Braided Ramp Location 13

  13. Conceptual Construction Phasing  Direct Connector Bridges will be replaced and removed one at a time to minimize disruptions to existing traffic patterns, in this order: – Southbound I-69C to Westbound I-2 – Southbound I-69C to Eastbound I-2 – Eastbound I-2 to Northbound I-69C – Westbound I-2 to Northbound I-69C  The new bridges can mostly be constructed while traffic remains in its current location  Temporary detours will be required for roadway and bridge construction.  Remaining highway lane, frontage road, and ramp optimization work will be interwoven into the direct connector replacement phases to provide least possible impact to traveling public 14

  14. Environmental Considerations  Approxi ximat mately 7 7.4 acre res of of new ROW w will ll b be re required  No No Licenses, , or Perm rmits w will b ll be require red  The The f follo ollowing technical re reports a are re b being condu ducted: d: – Cult ltura ral R l Resou ource S Study, – Commu mmunit ity Impac act A Analysis, sis, – Hazar ardous M s Material als I s Initial ial S Sit ite A Assessm ssment, – Traf affic ic N Noise se A Analysis sis, – Bio Biological E Eval aluation, – Air ir Q Qual ality A Anal alysis, an and d – Indir irect A Analysis, sis, 15

  15. Right-of-Way (ROW) Acquisition SH 495 / Ferguson Ave APPROXIMATELY 7.4 ACRES TxDOT Cage Blvd Polk Ave 16

  16. Right-of-Way (ROW) Acquisition/Relocation Assistance • Uniform Relocation Assistance and Real Property Act of 1970  Title II  Title III • ROW Brochures • TxDOT Right-of-Way Representatives TxDOT WEBSITE http://w ://www ww.t .txd xdot.gov/g /government/p /proce ocesses-proced edures es/row.html 17

  17. Project Schedule PROPOS OSED PROJ OJECT CT S SCHEDULE* Preliminary ROW Acquisition Design-Build Construction Contract Design Complete Execution & Environmental Clearance Summer 2019 Fall 2018 Spring 2019 2020 - 2023 *This p project schedule a and nd dates a are prelimina nary a y and nd sub ubject t to change. The environmental review, consultation, and other actions required by Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT. 18

  18. Public Comment Period • Use the microphone. • State your name & address. • State your interest in the project. • Give your comments on the project. Limit statement to 3 minutes. 19

  19. Provide Your Comments Leave comments at registration table tonight • Mail or drop off comments: • TxDOT P Phar harr D Dist istrict Attn: R Robi bin G n Gel elston 600 W 600 W. I Int nter erstate 2 Pharr, T Ph TX 785 78577 Fax comments to (956) 702-6110 • Email comments to Robin.Gelston@txdot.gov • Visit www.txdot.gov and search “I-2 and I-69C” to view this • presentation and provide comments online Comments must be received or postmarked by Friday, June 29, 2018 • Comment Responses will be developed and posted to the TxDOT • website 20

  20. Closing Remarks Thank Y You for Your Parti ticipati tion! 21