i 2 i 69c interchange
play

I-2/I-69C INTERCHANGE Texas Transportation Commission May 24, 2018 - PowerPoint PPT Presentation

I-2/I-69C INTERCHANGE Texas Transportation Commission May 24, 2018 I-2/I-69C Interchange Design-Build Project May 24, 2018 I-2/I-69C Interchange Project Purpose Summ mmary of f Co Comm mmiss ssion A Actio ion Authorize:


  1. I-2/I-69C INTERCHANGE Texas Transportation Commission May 24, 2018 I-2/I-69C Interchange Design-Build Project May 24, 2018

  2. I-2/I-69C Interchange Project – Purpose Summ mmary of f Co Comm mmiss ssion A Actio ion  Authorize: – TxDOT to issue a request for qualifications (RFQ) to design, develop, construct, and potentially maintain the non-tolled I-2/I-69C Interchange Project, providing for the full reconstruction of the I-2/I-69C interchange and operational improvements to I-2 and I-69C in McAllen, Pharr, and San Juan. I-2/I-69C Interchange Design-Build Project May 24, 2018 2

  3. I-2/I-69C Interchange Project – Purpose  Project elements and purpose: – Decrease congestion – Enhance system connectivity – Optimize ramp and interchange operations – Reduce travel time – Improve mobility I-2/I-69C Interchange Design-Build Project May 24, 2018 3

  4. I-2/I-69C Interchange Project – Overview  Total length: 7.8 miles  Increased capacity: – Additional I-2 general purpose lanes – Additional direct connector I-2: Existing Typical Section at I-69C Interchange lanes at the I-2/I-69C interchange – Reconfiguration of general purpose lane ramp access  Cost estimate: $320M I-2: Proposed Typical Section at I-69C Interchange I-2/I-69C Interchange Design-Build Project May 24, 2018 4

  5. I-2/I-69C Interchange Project – Overview I-69C: Existing Typical Section approaching I-2 Interchange I-69C: Proposed Typical Section approaching I-2 Interchange I-2/I-69C Interchange Design-Build Project May 24, 2018 5

  6. I-2/I-69C Interchange Project – Alternative Delivery Support Tool  Decision support tool – Used to determine best delivery method: • Design-bid-build • Design-build – Tool considers TxDOT’s goals and specific project characteristics  Results – Tool indicates design-build as most appropriate delivery method with a score of 0.35 (scale of -1.00 to 1.00) I-2/I-69C Interchange Design-Build Project May 24, 2018 6

  7. I-2/I-69C Interchange Project – Anticipated Procurement Timeline Milestone Date Issue RFQ June 2018 Shortlist / Commission Action to Issue RFP August 2018 Issue Final RFP Late fall 2018 Proposals Due Spring 2019 Commission Action to Approve Conditional Award Late Spring 2019 Contract Execution Summer 2019 Construction Completion 2023 I-2/I-69C Interchange Design-Build Project May 24, 2018 7

  8. Questions Staff is here to answer any questions and recommends acceptance of this Minute Order I-2/I-69C Interchange Design-Build Project May 24, 2018 8

Recommend


More recommend