us us us us 62 at i 62 at i 62 at i 62 at i 44
play

US US US- US- -62 at I -62 at I 62 at I- 62 at I- -44 - PowerPoint PPT Presentation

US US US- US- -62 at I -62 at I 62 at I- 62 at I- -44 Interchange -44 Interchange 44 Interchange 44 Interchange Ram Ramp Im Ram Ramp Im p p p p Improvements Improvements p p p p rovements rovements Stakeholder Meeting


  1. US US US- US- -62 at I -62 at I 62 at I- 62 at I- -44 Interchange -44 Interchange 44 Interchange 44 Interchange Ram Ramp Im Ram Ramp Im p p p p Improvements Improvements p p p p rovements rovements Stakeholder Meeting Stakeholder Meeting Stakeholder Meeting Stakeholder Meeting NW Rogers Ln./US-62 I-44 I-44 NE Rogers Ln. Oklahoma Department Oklahoma Department of Transportation of Transportation August 8, 2012

  2. Project Purpose and Information Project Purpose and Information Project Purpose and Information Project Purpose and Information � ODOT project to improve safety and interstate access. � Approximately 30,000 vehicles per day travel through the interchange. � Highway was built in the late 1970’s before designated as an interstate. o Update geometrics o Update geometrics � High accident rate at the east intersection. o Right turn only intersection to avoid o Right turn only intersection to avoid conflicting movements. � Constraints include railroad tracks to the Constraints include railroad tracks to the east, Ft. Sill airfield to the northwest, and neighborhood to the southwest.

  3. Ft. Sill 2 Gate 2 G t Post Rd. Existing Existing Existing Existing I-44 NW Rogers Ln./US-62 NE Rogers Ln. Existing Right-of-Way Indian Trail Rd.

  4. Ft. Sill 2 Gate 2 G t Post Rd. Proposed Proposed Proposed Proposed I-44 NW Rogers Ln./US-62 NE Rogers Ln. Existing Right-of-Way Indian Trail Rd.

  5. Proposed: Proposed: Proposed: Proposed: South Half South Half South Half South Half NW Rogers Ln./US-62 Ramp A Indian Trail Rd. Ramp C Ramp C Bridge A Ramp B NE Rogers Ln.

  6. Proposed: Proposed: Proposed: Proposed: North Half North Half North Half North Half NW Roger Post Rd Post Rd. rs Ln./US-62 Ft. Sill Ramp F Gate 2 I-44 Ramp D Ramp D Ramp E Bridge B NE Rogers Ln. NW Pioneer Blvd.

  7. Proposed: Rogers Lane Rogers Lane Rogers Lane Rogers Lane NW Pioneer Blvd. NW Rogers Ln./US-62 NE Rogers Ln. Proposed: Proposed: Proposed: NE Lawrie Tatum Rd.

  8. Existing Existing Existing Existing Eastbound On Eastbound On Eastbound On- Eastbound On- -Ramp -Ramp Ramp Ramp

  9. Proposed Proposed Proposed Proposed Eastbound On Eastbound On Eastbound On- Eastbound On- -Ramp -Ramp Ramp Ramp

  10. Existing Existing Existing Existing Northbound Off Northbound Off Northbound Off Northbound Off- -Ramp -Ramp Ramp Ramp

  11. Proposed Proposed Proposed Proposed Northbound Off Northbound Off Northbound Off Northbound Off- -Ramp -Ramp Ramp Ramp

  12. Construction Phasing Construction Phasing Construction Phasing Construction Phasing � Phased construction to disturb traffic as little as possible. p � Six construction phases currently p proposed. p � All ramp movements maintained except Northbound entrance ramp. p o Proposed detour route for 45 days. � Shoofly needed to align temporary Shoofly needed to align temporary intersection. o Use temporary signal with dual left turn.

  13. Construction Construction Phase 1 Phase 1 � Remove grass medians along Rogers Lane and pave level with driving lanes. � Construct SB exit ramp (Ramp F). C S ( ) NW Roge Ramp F Post Rd. Ft. Sill Gate 2 Gate 2 rs Ln./US-62 I-44 NE Rogers Ln.

  14. Construction Phase 2 Construction Phase 2 � Open Ramp F to traffic. � Set up detour along Indian Trail Road to Cache Road. � Close and remove existing SB exit ramp and SB entrance ramp. � Construct SB entrance ramp (Ramp A). p ( p ) NW Roge Ramp A Ramp F Post Rd. Ft. Sill Gate 2 Gate 2 rs Ln./US-62 I-44 NE Rogers Ln.

  15. Construction Construction Phase 3 Phase 3 � Open Ramp A to traffic. � Construction NB exit ramp (Ramp B) and a portion of NB entrance loop (Ramp C). ( C) NW Roge Ramp A Post Rd. Ft. Sill Gate 2 Gate 2 rs Ln./US-62 I-44 Ramp B Ramp C NE Rogers Ln.

  16. Construction Construction Phase 4 Phase 4 � Construct Shoofly on north side of Rogers Lane. � Open Ramp B and Shoofly to traffic. � Close and remove existing NB exit ramp. � Construct remaining portion of NB entrance loop (Ramp C). g p p ( p ) NW Roge Post Rd. Ft. Sill Gate 2 Gate 2 rs Ln./US-62 I-44 Ramp B Ramp C NE Rogers Ln.

  17. Construction Phase 5 Construction Phase 5 � Open Ramp C to traffic. � Close and remove Shoofly and existing NB entrance ramp. � Construction NB exit loop (Ramp D) and NB entrance ramp (Ramp E). NW Roge Post Rd. Ft. Sill Gate 2 Gate 2 rs Ln./US-62 I-44 Ramp C Ramp D NE Ramp E Ramp E Rogers Ln.

  18. Construction Phase 6 Construction Phase 6 � Open Ramp D and Ramp E to traffic. � Construct medians along center of Rogers Lane. � Construct median at intersection of Ramp B-C and Rogers Lane. NW Roge Post Rd. Ft. Sill Gate 2 Gate 2 rs Ln./US-62 I-44 Ramp B Ramp C Ramp D NE Ramp E Ramp E Rogers Ln.

  19. Interchange Ramp Interchange Ramp Closure and Closure and Proposed Detour Proposed Detour Proposed Detour Proposed Detour

  20. Questions Questions

Recommend


More recommend