STUDY AREA
• • • PROJECT PURPOSE ■ Analyze structure of the bridge and prepare short term remediations ■ Analyze the long-term multi-modal capacity improvements that include the future operating requirements of high-speed and intercity passenger rail, commuter rail, transit, bike and pedestrian, and freight services over the Potomac River ■ Analyze multi-modal connectivity and operational improvements
PROJECT SCOPE ■ Data Collection ■ Public Involvement ■ Agency and Bridge User Involvement ■ Transportation Analysis & Evaluation ■ Alternatives Development ■ Environmental Screening ■ Recommendations
PROJECT NEEDS Needs Your Preference Multi-modal Access Inter-Modal Connectivity Long-term Capacity Transportation Demand Support Existing & Future Land Use Operational Improvements System Linkages Improve Structural Conditions Other
SCHEDULE Milestone Date Data Collection, Analysis and Evaluation Fall 2012 / Winter 2013 Bridge Alternatives and Conceptual Winter 2013 / Spring 2013 Engineering Environmental Review Spring 2013 / Summer 2013 Final Report Summer 2013
PUBLIC INVOLVEMENT Anticipated Meeting Dates Public Meeting #1 November 13, 2012 Public Meeting #2 Winter 2013 / Spring 2013 Public Meeting #3 Summer 2013 Please give us your comments: ■ At a public meeting ■ Website: www.longbridgeproject.com ■ Email: info@longbridgeproject.com ■ Mail: Lezlie Rupert Long Bridge Study 100 M Street, SE, Suite 1200 Washington, DC 20003