boundary channel drive interchange
play

Boundary Channel Drive Interchange Boundary Channel Drive/I-395 - PowerPoint PPT Presentation

Boundary Channel Drive Interchange Boundary Channel Drive/I-395 Interchange Improvements Existing Conditions Existing Conditions Existing Conditions Existing Conditions 14 th Street Bridge Corridor EIS 14 th Street Bridge Corridor EIS Concept


  1. Boundary Channel Drive Interchange Boundary Channel Drive/I-395 Interchange Improvements

  2. Existing Conditions

  3. Existing Conditions

  4. Existing Conditions

  5. Existing Conditions

  6. 14 th Street Bridge Corridor EIS

  7. 14 th Street Bridge Corridor EIS

  8. Concept 1

  9. Concept 2

  10. Concept 3

  11. Concept Evaluation • Pentagon Access Road – Option 1 (unsignalized) • West Roundabout – Option 2 • East Roundabout – Option 2

  12. Preferred (now Accepted) Concept

  13. Accepted Concept

  14. Accepted Concept

  15. Weaving Analysis 3 weaving segments reduced to 1 weaving segment

  16. Traffic Impact Analysis Interchange Modification Report IMR • FHWA technical analysis • Part of NEPA • Evaluate series of concept designs • Analyze 2026 and 2040 Build traffic volumes

  17. Project Timeline • Draft 14 th Street Bridge EIS – January 2012 • Initial Meeting w/ DOD, NPS, & FHWA – April 26, 2012 • Public Information Meeting – June 23, 2015 • DOD Letter of Recommendation – January 21, 2016 • 1 st IMR Submission – April 25, 2016 • CE issued on January 17, 2018 • 6 th IMR Submission – August 16, 2019 • County Board Approves Transfer to VDOT – Sept 21, 2019 • IMR Approval – October 8, 2019

  18. Anticipated Schedule We ar We are here here • Transfer Project to VDOT – Ongoing • Preliminary Design – Early to Mid 2020 • Public Hearing – Mid to Late 2020 • Advertise Contract – Late 2020 • Aquatic Center Opening – Early 2021 • Award Contract – Mid 2021 • Construction – 2022-2023