Eisenhower Expressway (I-290) Study Session #10 Letter of Intent - PowerPoint PPT Presentation

Eisenhower Expressway (I-290) Study Session #10 Letter of Intent Discussion July 11, 2016 Eisenhower Expressway (I-290) Letter of Intent Discussion What is a Letter of Intent (LOI) o How the LOI incorporates previous Board discussions o


  1. Eisenhower Expressway (I-290) Study Session #10 Letter of Intent Discussion July 11, 2016

  2. Eisenhower Expressway (I-290) Letter of Intent Discussion What is a Letter of Intent (LOI) o How the LOI incorporates previous Board discussions o Review draft LOI charts presented on May 23, 2016 o Review Updates since May 23, 2016 meeting o Remaining outstanding items o Future Board meetings on LOI o

  3. Eisenhower Expressway (I-290) Letter of Intent Discussion Letter of Intent (LOI) • Concurrence with proposed project scope • Local cost participation responsibilities • Maintenance/ jurisdictional responsibilities • Outline items for future consideration

  4. LOI Summarizes previous Board discussions by: Incorporating items into project scope and plans o (Roadway geometry, interchange design, drainage improvements, etc.) Including narratives and summary charts o (Noise walls, construction monitoring, sustainability, expanded decking, bridge widths, bike & pedestrian accommodations, etc.) Tables for cost sharing and maintenance responsibility o (Lighting, traffic signals, utilities, aesthetic treatments, etc.)

  5. I-290 Letter of Intent Charts Draft Charts Describing LOI items Bridge and Sidewalk widths o Street Lighting o Roadway Jurisdictions o Bike and Pedestrian accommodations o Aesthetic Elements o Utility Improvements o Traffic Signals o

  6. LOI – Bridge and Sidewalk Widths

  7. LOI – Street Lighting

  8. LOI – Bridge/Road Maintenance & Jurisdiction

  9. LOI – Bike and Pedestrian Accommodations

  10. LOI – Aesthetic Elements

  11. LOI – Utility Improvements

  12. LOI – Traffic Signals

  13. LOI – Traffic Signals (cont.)

  14. LOI Cost Participation Summary LOI includes cost summary for shared or local items: Cost estimates for certain items o % participation responsibility for most shared items o Local costs for other items o Some items still TBD o

  15. LOI – Updates and Remaining items Updates from May 23, 2016 Study Session Established language for noise walls o Additional opportunities for expanding decking o Remaining Items Final cost estimating o Costs for expanded decking foundations o Oak Park Ave Sewer upsizing o Bridge maintenance responsibility o

  16. Eisenhower Expressway (I-290) Letter of Intent Future Discussions Present LOI at VOP Regular Board Meeting Likely July 18, 2016 Final LOI for consideration and approval at VOP Regular Board Meeting Likely August 1, 2016