distribution system
play

Distribution System Sal Salet, Director of Operations March 27, - PowerPoint PPT Presentation

We Deliver. Impacts of DERs on the Distribution System Sal Salet, Director of Operations March 27, 2019 PPL Electric Utilities We are an electric delivery company 10,000-square-mile service area Approximately 1.4 million customers


  1. We Deliver. Impacts of DERs on the Distribution System Sal Salet, Director of Operations March 27, 2019

  2. PPL Electric Utilities We are an electric delivery company • 10,000-square-mile service area • Approximately 1.4 million customers • Tremendous increase in DER 2 2018 PPL Electric Utilities – Proprietary & Confidential

  3. 3 Electric Power Industry is Transforming Distributed Energy Resources: Economically competitive smaller, distributed power systems and storage are being installed in increasing numbers. Energy Efficiency: Consumption of energy is being reshaped by technologies that drive efficiency and change demand patterns. Decarbonization: Low-carbon technologies such as wind and solar are exceeding growth expectations. Digitization: Asset, facility and fleet level, internet- enabled applications are proliferating. 3 2018 PPL Electric Utilities – Proprietary & Confidential

  4. Electric Power Industry Transformation • Distributed power technologies have created the need for two-way power flows. • New technologies such as batteries are providing opportunities throughout the transmission and distribution network. • It is imperative that PPL begins testing the management of DER systems 4 2018 PPL Electric Utilities – Proprietary & Confidential

  5. Growth of Customer DER Solar PV Interconnections 30000 kW 1518 1600 1301 1400 25000 kW 1200 952 20000 kW 1000 Solar PV Capacity (kW) 15000 kW 800 Solar PV Systems 600 10000 kW 239 290 400 240 5000 kW 200 17,340 4,301 7,830 16,161 3,506 26,491 0 kW 0 2013 2014 2015 2016 2017 2018 5  2019 PPL Electric Utilities

  6. Changes Require Investments Opportunitie Challenges Solutions s Masked (Hidden) Load Advanced Metering Non-Wire Alternatives • • • Infrastructure • Fault Location More discretely controllable • • Inverter Communication Grid Load Transfers • Traditional Protection Methods Voltage DERMS • • • • VARs • 69kv Substation Blown Fuse Microprocessor Relays • Detection Market Enablement • 69kV Reclosers and Breakers • • Inverter Fault Currents DER Forecasting Tools • Cyber Security • Connected Systems • Aggregated Systems • 6  2019 PPL Electric Utilities

  7. 75 Keystone Solar Future Project An innovative pilot that will allow PPL system operators to have remote monitoring and management capabilities of the DER systems: • Interconnection Web Portal: Renewable Energy Connection • DERMS: Central platform with Distributed Energy Resource-aware algorithms for management and optimization. • Proof of Scalability: Customer enrollment, DERMS pilot, technology demonstration, Drexel simulation. 7 7 2018 PPL Electric Utilities – Proprietary & Confidential

Recommend