Crane Cove Park Building 49 Contract No. 2814 April 9, 2019 1
AGENDA 1. General Information – Andre Antonio 2. Project Overview – Erica Petersen 3. CMD – Finbarr Jewell 4. OLSE– Anna Liu 5. OEWD – Joyce Wong 6. Environmental – Soko Made 7. Bid Documents – Andre Antonio 8. Questions
• See Section 00 21 13 – 1.14 Submission and Opening of Bids • Two separately sealed envelopes • Envelope #1 • TITLE: Bid for Crane Cove Park – Building 49 (Port of SF Contract No. 2814) • Envelope #2 • TITLE: Bidder’s Qualifications for Crane Cove Park – Building 49 (Port of SF Contract No. 2814)
Envelope #1 Bid for Crane Cove Park – Building 49 (Port of SF Contract No. 2814)
Envelope #2 Bidder’s Qualifications for Crane Cove Park – Building 49 (Port of SF Contract No. 2814)
Presented by: Erica Petersen erica.petersen@sfport.com CRANE COVE PARK BUILDING 49 AREA OF WORK LOCATION MAP
Project Overview Crane Cove Park – Crane Cove P rk – 2814 Building 49 2814 Building 49 • Cold shell rehabilitation with restrooms • New roof • Structural Steel work • Foundation with Piles and Concrete Grade Beams • Restrooms • Fire Protection • Asphalt paving • Building is approx. 7,700 sf • Engineer’s Estimate is $3.8 million
• Project Coordination (Section 01 31 13) Crane Cove Park is an active construction site occupied by other Port Contractors per Section o 01 31 13. 2812 Park Improvements and 19 th St Parking Lot – Gordon N. Ball o Need to coordinate regularly and final electrical connection for Park (see next o slide) 2813 19 th St Roadway Improvements (future contract, not bordering this project) o Nearby Projects: o SFMTA Mission Bay Loop on Illinois St o SFPUC Bay Corridor Transmission and Distribution Project (BCTD) o Renovation of Historic Core Buildings 101 and 104 along 20th Street by Orton o Construction. • Risk Management Plan - Native Soil contains contaminants, see reference in Section 00 31 00, which includes an asbestos dust mitigation plan (See 01 11 00). • Hazmat Abatement already performed , but if your work disturbs a painted surface, need to perform spot lead abatement. • Utility connections under Illinois St.
• Bid Submission April 30, 2019 at 10:30AM • Bid Opening May 14, 2019 at 10:30AM • Award of Contract June 11, 2019 • NTP, Construction Start July 2019 • Construction Duration 300 Consecutive Calendar Days after NTP • Substantial Completion May 2020 • Final Completion July 2020
Example on Sheet A-01-01, Architectural Floor Plan:
Presented By: Finbarr Jewell finbarr.jewell@sfgov.org Local Business Enterprise (LBE) • Subcontracting Goal = 23.0% 11.6% MBE 2.6% WBE 8.8% OBE Good Faith Efforts Exception, LBE = 31.0% • Refer to Section 00 22 11 for details. •
Presented by: Anna Liu anna.liu@sfgov.org
Presented by: Joyce Wong joyce.s.wong@sfgov.org Required per San Francisco Administrative Code Section 6.22(g) and Chapter 82 • See Section 00 73 30 for details • Applies to both Prime Contractor and ALL Subcontractors • Local Hire Requirement 30% by trade • At least 50% of Apprentice project work hours within each trade shall be • performed by local residents.
Presented by: Soko Made rusununguko.made@sfgov.org Construction & Demolition (C&D) Debris Management Requirements • See Section 01 74 50 for details • Minimum Diversion Rate of 75% Required • Source ‐ separated C&D debris material must be taken to a facility that reuses and/or recycles that material • MIXED C&D debris material must be taken to a REGISTERED FACILITY by a REGISTERED TRANSPORTER • Diversion Reporting – Use Form C for initial, monthly, and final reports • Weight Tags are required for monthly reporting • Contractor MUST include materials from ALL Subcontractors in reports • City Representative is responsible for reviewing, signing, and approving all reports submitted by the Contractor.
4/5/19 QBD Addendum 1
Ensuing Site Visit at Crane Cove Park (701 Illinois St.) Hard Hat, Vests, & Boots Required (Addendum 01)
Questions?