Smith Cove Park Seattle Design Commission – Schematic Review Seattle Parks and Recreation October 4, 2018
Previous Vision Plan (Feb. 2018) Parking Restroom Play Field Kayak/Beach Access Potential Shoreline Restoration Picnic Perch Playground Beach Grove Volleyball Off-Leash Area Courts (1 acre) Beach Stair
Previous $3.9 Million Plan (Feb. 2018) Play Field Picnic Perch Volleyball Courts Off-Leash Area Beach Stair (0.5 acres)
What We Heard Concerns stated in Feb. 2018 SDC Schematic Design Review Conditions of Approval 1. Provide a workplan for Phase II (east parcel) including schedule, scope and potential funding 2. Move off-leash area to Phase II 3. Remove netting/fence around volleyball area Recommendations 1. Provide information on bicycle circulation and vehicle parking 2. Analyze traffic calming for 23 rd Ave W in Phase I 3. Explore reducing fencing along 23 rd Ave W at soccer fields
Previous $3.9 Million Plan (Feb. 2018) Play Field Picnic Perch Volleyball Courts Off-Leash Beach Area (0.5 Stair acres)
Current Project Open Lawn Play Field Picnic Perch Off-Leash Area Bioretention Beach Basin Stair
Vision Plan Re-Cap
Previous Vision Plan (Jan. 2017) Kayak/Beach Access Restroom Youth Baseball Soccer/Lawn Pump Track Walking Playground Trails Beach Volleyball Grove Courts Off-Leash Area (0.5 acres) Softened shoreline
Current Vision Plan Parking Kayak/Beach Access Youth Baseball Restroom Soccer/Lawn Picnic Perch Picnic Perch Playground Off-Leash Volleyball Area Courts Bioretention Bioretention Basin Basin
Current $3.9M Plan Open Lawn Play Field Picnic Perch Off-Leash Area Bioretention Beach Stair Basin
Elliott Bay as our Central Park
James Everett Stuart, 1889
Issue: Site has 2 halves
Rigid divisions & hard edges
Re-orient site geometry
Current Project
Vision Plan
Original Design Principles
Previous Vision Plan (Jan. 2017) Kayak/Beach Access Restroom Youth Baseball Soccer/Lawn Pump Track Walking Playground Trails Beach Volleyball Grove Courts Off-Leash Area (0.5 acres) Softened shoreline
Previous Vision Plan (Feb. 2018) Restroom Parking Play Field Kayak/Beach Access Potential Shoreline Restoration Picnic Perch Playground Beach Grove Volleyball Off-Leash Area Courts (1 acre) Beach Stair
Current Design Strategy
Circulation - Current Project
Circulation – Vision Plan
Materials Plan Log Zone-Edge Eco-Block at Off-leash Area
Program Highlights
1. The Park Green Green Seattle Partnership restoration area Open 1/4 mile Lawn Walking/ Running Trail U10/U11/U14 soccer fields Picnic Perch
Woodland Mix: Rosa nutkana / Nootka rose Acer macrophyllum / Big Leaf Maple Symphoricarpos albus / Snowberry Philadelphus lewisii / Mock Orange Mahonia aquifolium / Oregon Grape Woodland Shade Mix: Gaultheria shallon / Salal Polystichum munitum / Sword Fern Mahonia aquifolium / Oregon Grape
Subdrain Plan Sports Lawn Soil with Lateral Lateral to Collector Sub-Drainage
2. The Picnic Perch Section, Looking West Section of Berm, Off-Leash Area, and Bioretention; Looking West
3. Off-Leash Area Off-Leash Area .45 acres
3. Off-Leash Area Edge Conditions of Off-Leash Area
Pseudotsuga menziesii / Douglas Fir Acer macrophyllum / Big Leaf Maple Woodland Mix: Rosa nutkana / Nootka rose Symphoricarpos albus / Snowberry Philadelphus lewisii / Mock Orange Mahonia aquifolium / Oregon Grape
4. Bioretention Basin
Arbutus menziesii / Pacific Madrone Bioretention Mix: Deschampsia cespitosa / Tufted Hair Grass Mahonia aquifolium / Oregon Grape Achillea Millefolium / Common Yarrow Erigeron / Wayne Roderick Daisy Monaredella villosa / Coyote Mint Camassia leichtlinii / Great Camas
Drainage Plan Bioretention Pond Width Bioretention Pond Detail
5. Beach Stair
5. Beach Stair
Questions ?