Charter High School Addition Community Meeting
Project Team Fulton County Schools Patrick Burke, Deputy Superintendent of Operations David Knotts, Executive Director of Capital Improvements Chad Word, Project Manager CGLS Architects, Inc. Robert Sussenbach, AIA Rebecca Tyson, AIA Turner Construction Company Lance Painter, Project Manager Riverwood International Charter High School Dr. Robert Shaw, Principal Building Advisory Committee RHS Staff & Faculty Representatives
What Has Been Achieved
What Has Been Achieved
What Has Been Achieved
What Has Been Achieved
What Has Been Achieved ATRIUM LOBBY CEILING COLOR SCHEME
What Has Been Achieved Entry Portal at South Side of Entrance Lobby Front Elevation from the Parent Drop-off/ Pick-up Queue Line Typical Floor Learning Commons Unfinished Third Floor Stadium Side Student Plaza
Schedule of Construction Activities Phase 1 Project Milestones April 2017 - Level 100 Substantial Completion May 2017 - Level 300 Substantial Completion June 2017 - Level 200 Substantial Completion June 2017 - Start the Renovation for the Cafeteria Expansion June 2017 - Temporary Certificate of Occupancy July 2017 - School to begin the "Move- in" Process July 2017 - Substantial Completion/ Certificate of Occupancy
STUDENT PARKING NEW BUILDING(S) OR RENOVATED CONSTRUCTION TEMPORARY HC BUS DROP- OFF/ NEW NEW ASHALT PAVING & PICK- UP CONC. CURB & GUTTER STUDENT DROP- OFF/ PICK- UP NEW COVERED WALKWAY CONNECTING EXISTING BUILDING WITH NEW CLASSROOM BUILDING PHASE 1 . Mechanical Plant PHASE 1 PHASE 1 CLASSROOM . WH DN CAFETERIA BUILDING EXPANSION EXISTING BUS DROP- OFF/ PICK- UP CONCESSIONS/ STAFF PARKING 66 EXISTING SPACES RESTROOM BUILDING 6 EXISTING SPACES k n a 6 EXISTING SPACES B STUDENT ACCESS TO & p e FROM BASEBALL FIELD e t S & SCHOOL BUILDINGS CURRENT CONSTRUCTION PHASE 1 400 EXISTING PARKING SPACES AVAILABLE BUILDING COMPLETION JULY 2017 REVISED 3- 8- 2017 R IVERWOOD I NTERNATIONAL C HARTER H IGH S CHOOL R EPLACEMENT 5900 Raider Drive, NW, S andy S prings, Georgia 30328
What is Yet Ahead
E S P A C G S NEW BUILDING(S) OR K I N P A R E N T U D 2 S T 2 7 RENOVATED CONSTRUCTION R Y R A M P O T E O F F / O P - D R B U S H C - U P P I C K NEW NEW ASHALT PAVING & CONC. CURB & GUTTER U P C K - F / P I O F O P - T D R D E N T U S NEW COVERED WALKWAY CONNECTING EXISTING BUILDING WITH NEW CLASSROOM BUILDING PHASE 1 . Mechanical Plant PHASE 2 THIRD FLOOR . WH DN BUILD- OUT B U P 6 6 S A 6 R E D E X K R X I I O N S I S T P G T I - N I N O S G G F P F S A S / T C P P A E A I F C S C F K E - S U P FINAL STUDENT ACCESS TO & FROM BASEBALL FIELD & SCHOOL BUILDINGS k n a 6 EXISTING SPACES B p e e t S PHASE 1 CAFETERIA EXPANSION CONSTRUCTION PHASE 2 CONSTRUCTION OF 3RD FLOOR BUILD- OUT: 400 TOTAL PARKING COMMENCING MAY 2018 - COMPLETION AUGUST 2018 SPACES CONSTRUCTION OF CAFETERIA & MEDIA CENTER ADDITIONS: COMMENCING JUNE 2018 - COMPLETION AUGUST 2019 REVISED 3- 8- 2017 R IVERWOOD I NTERNATIONAL C HARTER H IGH S CHOOL R EPLACEMENT 5900 Raider Drive, NW, S andy S prings, Georgia 30328
S A C E NEW BUILDING(S) OR S P I N G A R K N T P D E S T U 2 7 2 RENOVATED CONSTRUCTION NEW NEW ASHALT PAVING & CONC. CURB & GUTTER 80 NEW STAFF SPACES NEW COVERED 8 NEW U P C K - F / P I - O F WALKWAY AT HC SPACES R O P T D D E N S T U NEW PEDESTRIAN BRIDGE FROM BUS DROP- OFF/ STUDENT PARKING AREAS TO LEVEL 200 PICK- UP OF CLASSROOM BUILDING 13 EXISTING SPACES STUDENT ACCESS BETWEEN EXISTING AUDITORIUM & GYMNASIUM BUILDINGS DURING CONSTRUCTION OF NEW AUDITORIUM/ GYMNASIUM BUILDING w N e 7 s a c e S p CONSTRUCTION EXISTING BUILDING TO STAGING & BE DEMOLISHED LAYDOWN AREA 9/2019 THRU 11/2019 EXISTING CONCESSIONS/ k RESTROOM n a BUILDINGS B p e e t S ENTRANCE & EXIT OF CONSTRUCTION TRAFFIC TO STAGING AREA CONSTRUCTION PHASE 3 405 TOTAL PARKING SPACES DEMOLITION OF EXISTING CLASSROOMS/ CAFETERIA/ KITCHEN & MEDIA CENTER : COMMENCING SEPT. 2019 - COMPLETION DECEMBER 2019 REVISED 3- 8- 2017 R IVERWOOD I NTERNATIONAL C HARTER H IGH S CHOOL R EPLACEMENT 5900 Raider Drive, NW, S andy S prings, Georgia 30328
E S P A C G S K I N P A R NEW BUILDING(S) OR E N T U D 2 S T 2 7 RENOVATED CONSTRUCTION NEW NEW ASHALT PAVING & STAFF/ VISITOR 80 NEW SPACES CONC. CURB & GUTTER C E S S P A F F S T A E W 8 0 N Pedestrian Bridge - U P P I C K F F / 8 New Spaces P - O R O N T D D E S T U HC BUS DROP- OFF/ PICK- UP 13 EXISTING SPACES BUS DROP- OFF/ PICK- UP STAFF PARKING 66 EXISTING SPACES N e w 7 c e s S p a k n a B p e e t S CONSTRUCTION PHASE 4 405 TOTAL PARKING SPACES CONSTRUCTION OF NEW GYMNASIUM/ AUDITORIUM BUILDING ADDITION : COMMENCING DEC. 2019 - COMPLETION JUNE 2021 REVISED 3- 8- 2017 R IVERWOOD I NTERNATIONAL C HARTER H IGH S CHOOL R EPLACEMENT 5900 Raider Drive, NW, S andy S prings, Georgia 30328
S A C E S P NEW BUILDING(S) OR I N G A R K N T P D E S T U 2 7 2 RENOVATED CONSTRUCTION NEW NEW ASHALT PAVING & CONC. CURB & GUTTER STAFF/ VISITOR 80 NEW SPACES S A C E S P A F F W S T N E 8 0 Pedestrian Bridge 8 New Spaces STUDENT DROP- OFF/ PICK- UP HC BUS DROP- OFF/ PICK- UP 13 EXISTING EXISTING AUDITORIUM SPACES TO BE DEMOLISHED 7/2021 THRU 11/2021 e w 7 N e s S p a c NEW BUS DROP- OFF TO BE CONSTRUCTED 6/2021 THRU 7/2021 k n a B p e e t EXISTING GYMNASIUMS S TO BE DEMOLISHED 7/2021 THRU 11/2021 CONSTRUCTION PHASE 5 424 TOTAL PARKING SPACES DEMOLITION OF EXISTING GYMNASIUM & AUDITORIUM BUILDINGS : COMMENCING JUNE 2021 - COMPLETION OCTOBER 2021 REVISED 3- 8- 2017 R IVERWOOD I NTERNATIONAL C HARTER H IGH S CHOOL R EPLACEMENT 5900 Raider Drive, NW, S andy S prings, Georgia 30328
CONSTRUCT NEW CONCESSIONS/RESTROOM BUILDING STUDENT PARKING C E S NEW BUILDING(S) OR P A N G S R K I P A E N T T U D 7 2 S 2 RENOVATED CONSTRUCTION NEW NEW ASHALT PAVING & CONC. CURB & GUTTER STAFF/ VISITOR 80 NEW SPACES C E S S P A F F S T A E W 8 0 N Pedestrian Bridge P K - U P I C - U F F P / 8 New Spaces P I P C - K O F D F R / O P - N O T D R U O D E N T S T U D E S T HC BUS DROP- OFF/ PICK- UP Mech. Equipt. 15 New Spaces Yard CONSTRUCT ONE (1) NEW TENNIS COURT Loading & RESURFACE 4 Dock EXISTING COURTS NEW Bus Drop- off/ Pick- up N e w Bus Drop- off/ Pick- up 7 BASEBALL Queue Area and a c e s S p Queue Area and Band Practice Area FIELD Band Practice Area Loading Dock New Ticket Booth & Gated Entrance 6 New W a l l i n g e t a i n k R Spaces n a B p e 1 1 N e w S p a c e s e t S 11 New Spaces CONSTRUCTION PHASE 6 424 TOTAL PARKING DEMOLITION OF EXISTING SITEWORK : SPACES COMMENCING OCTOBER 2021 - COMPLETION NOVEMBER 2021 REVISED 3- 8- 2017 R IVERWOOD I NTERNATIONAL C HARTER H IGH S CHOOL R EPLACEMENT 5900 Raider Drive, NW, S andy S prings, Georgia 30328
EXISTING ENTRANCE TO BE CLOSED AT CONSTRUCTION CONCLUSION STUDENT PARKING E S NEW BUILDING(S) OR A C G S P K I N P A R N T U D E S T 2 7 2 RENOVATED CONSTRUCTION NEW NEW ASHALT PAVING & CONC. CURB & GUTTER 80 NEW STAFF/ VISITOR SPACES S C E E S S P A P A C A F F G S S T R K I N N E W P A 8 0 E W 2 5 N Pedestrian Bridge 8 New Spaces GRAVEL PARKING P K - U P I C F F / LOT FOR BASEBALL AND - O R O P T D E N T U D S SOFTBALL FIELD PARKING HC BUS DROP- OFF/ PICK- UP E S P A C 43 G S K I N P A R R S S I T O 3 V I 4 Mech. Equipt. 15 New Spaces Yard 15 New Spaces Loading Patio Dock Patio NEW Bus Drop- off/ Pick- up N e w 7 Bus Drop- off/ Pick- up Queue Area and BASEBALL c e s S p a Queue Area and Band Practice Area Sloped Bank FIELD Band Practice Area Loading Dock New Ticket Booth & Gated Entrance Steep Bank 1 1 N e w S p a c e s L T Y C U F A 6 6 N e w 1 7 E S A C S P N G K I c e s P A R S p a New Ticket Booth & Existing Gated Entrance Storage Bldg. Existing Restrooms & Concessions to be Relocated 640 CONSTRUCTION PHASE 7 (FINAL) CONSTRUCTION OF AUDITORIUM LOBBY & REMAINING SITE WORK : COMMENCING NOVEMBER 2021 - COMPLETION JANUARY 2022 REVISED 3- 8- 2017 R IVERWOOD I NTERNATIONAL C HARTER H IGH S CHOOL R EPLACEMENT 5900 Raider Drive, NW, S andy S prings, Georgia 30328