work in progress
play

WORK IN PROGRESS July 2011 AUBURN HIGH SCHOOL AUTO SHOP - PowerPoint PPT Presentation

A UBURN S CHOOL D ISTRICT N O . 408 CAPITAL PROJECTS DEPARTMENT WORK IN PROGRESS July 2011 AUBURN HIGH SCHOOL AUTO SHOP IMPROVEMENTS PROGRESS: Construction work substantially completed March 22, 2011. PERCENT COMPLETE: 99% Auburn High


  1. A UBURN S CHOOL D ISTRICT N O . 408 CAPITAL PROJECTS DEPARTMENT WORK IN PROGRESS July 2011

  2. AUBURN HIGH SCHOOL AUTO SHOP IMPROVEMENTS PROGRESS: Construction work substantially completed March 22, 2011. PERCENT COMPLETE: 99%

  3. Auburn High School Auto Shop Improvements Steel framing for new overhead door to existing covered storage area.

  4. Auburn High School Auto Shop Improvements Partially enclosed wall at south side of covered storage area.

  5. Auburn High School Auto Shop Improvements Completed enclosure at covered storage area.

  6. AUBURN RIVERSIDE HIGH SCHOOL TENNIS COURTS RESURFACING PROGRESS: Construction work substantially completed June 24, 2011 . PERCENT COMPLETE: 99%

  7. Auburn Riverside High School Tennis Courts Resurfacing Tennis courts prior to resurfacing work.

  8. Auburn Riverside High School Tennis Courts Resurfacing Tennis courts after pressure washing in preparation of resurfacing work.

  9. Auburn Riverside High School Tennis Courts Resurfacing Application of blue surfacing material at main court area.

  10. Auburn Riverside High School Tennis Courts Resurfacing Application of green surfacing material surrounding tennis courts.

  11. Auburn Riverside High School Tennis Courts Resurfacing Layout work being done for tennis court lines.

  12. Auburn Riverside High School Tennis Courts Resurfacing Newly resurfaced tennis court.

  13. DICK SCOBEE CARPETING PROGRESS: Work is substantially complete. Remaining work consists of punch list items and submittal of close out documents. PERCENT COMPLETE: 95%

  14. Dick Scobee Carpeting Carpet delivery by Great Floors.

  15. Dick Scobee Carpeting Carpet being removed from classroom.

  16. Dick Scobee Elementary Piles of carpet material removed from classrooms.

  17. Dick Scobee Carpeting Library after carpet removal.

  18. Dick Scobee Carpeting Beginning installation of carpet in classroom.

  19. Dick Scobee Carpeting New carpet and stair nosings in Library.

  20. ASPHALT IMPROVEMENTS PROGRESS: Work is substantially completed at Alpac Elementary, Hazelwood Elementary, Chinook Elementary and Transportation Center. Work at Auburn Pool, Auburn Memorial Stadium and Evergreen Heights Elementary will be completed by late August. PERCENT COMPLETE: 85%

  21. Asphalt Improvements Student pathway at Chinook Elementary School before asphalt repair work.

  22. Asphalt Improvements Student pathway at Chinook Elementary School with new asphalt surface.

  23. Asphalt Improvements Settled and uneven asphalt at Alpac Elementary School playshed.

  24. Asphalt Improvements New asphalt at Alpac Elementary School.

  25. Asphalt Improvements Cracked and settled asphalt around storm drain at the Transportation Center.

  26. Asphalt Improvements Asphalt demolition work at the Transportation Center.

  27. Asphalt Improvements New asphalt at the Transportation Center.

  28. HAZELWOOD ELEMENTARY & RAINIER MIDDLE SCHOOL MODERNIZATION PROGRESS: Hazelwood Elementary – Shingles partially removed and new ice and water shield membrane partially installed at roof, sealer applied to exterior brick walls, wheel chair ramp to stage partially constructed , interior demolition complete and wall framing underway at Health and Special Education classroom restrooms. Rainier Middle School – Shingles removed and new ice and water shield installed at roof, foundation built at storage room addition, interior demolition completed at Library and handicap restrooms, and wall framing started at handicap restrooms. PERCENT COMPLETE: 30%

  29. Hazelwood Elementary & Rainier Middle School Modernization Rainier Middle School: Removal of roof shingles as part of the reroofing process.

  30. Hazelwood Elementary & Rainier Middle School Modernization Rainier Middle School: Deteriorated roof deck that broke through during the removal of shingles.

  31. Hazelwood Elementary & Rainier Middle School Modernization Rainier Middle School: Installation of new ice and water shield roof membrane.

  32. Hazelwood Elementary & Rainier Middle School Modernization Rainier Middle School: West section of building after installation of new ice and water shield membrane.

  33. Hazelwood Elementary & Rainier Middle School Modernization Rainier Middle School: New cinders being added to running track.

  34. Hazelwood Elementary & Rainier Middle School Modernization Rainier Middle School: Floor demolition in Library where computer lab will be added.

  35. Hazelwood Elementary & Rainier Middle School Modernization Rainier Middle School: Construction of foundation wall form work where storage room addition will be built.

  36. Hazelwood Elementary & Rainier Middle School Modernization Rainier Middle School: Wall framing at Health Room Restroom to enlarge room for wheel chair access.

  37. Hazelwood Elementary & Rainier Middle School Modernization Hazelwood Elementary School: Removal of roof shingles as part of the reroofing process.

  38. Hazelwood Elementary & Rainier Middle School Modernization Hazelwood Elementary School: Contractor cleaning exterior brick walls.

  39. Hazelwood Elementary & Rainier Middle School Modernization Hazelwood Elementary School: Construction of ramp for wheel chair access to stage.

  40. Hazelwood Elementary & Rainier Middle School Modernization Hazelwood Elementary School: Wall demolition at restroom in Special Education classroom.

  41. POOL AND STADIUM IMPROVEMENTS PROGRESS: Auburn Pool – Ceiling repair completed above the swimming pool; ductwork, plumbing and electrical conduit rough-in has begun inside the building; soil excavation, foundation and concrete slab completed at storage room addition; masonry installation has begun at storage room addition. Auburn Memorial Stadium – Site layout work has begun. Demolition work completed inside the Home and Visitor concession stands. PERCENT COMPLETE: 18% THROUGH END OF JUNE

  42. Pool and Stadium Improvements Swimming pool and bulkhead after water has been removed.

  43. Pool and Stadium Improvements Swimming pool bulkhead ready to be shipped to Arlington, Washington for reconditioning.

  44. Pool and Stadium Improvements Swimming pool with sheet plastic enclosure for asbestos abatement work.

  45. Pool and Stadium Improvements Workers removing asbestos containing plaster from bottom and sides of swimming pool.

  46. Pool and Stadium Improvements Demolition debris in mechanical room of pool building.

  47. Pool and Stadium Improvements Rusty lockers from the pool locker rooms before removal from the pool building.

  48. Pool and Stadium Improvements Workers removing roofing material at south side of pool building.

  49. Pool and Stadium Improvements South side of pool building where storage room addition will be built.

  50. Pool and Stadium Improvements Swimming pool after removal of plaster from bottom and sides of pool.

  51. Pool and Stadium Improvements Restroom where new water lines and plumbing fixtures will be installed at pool building.

  52. Pool and Stadium Improvements New plumbing lines and wall framing at restroom in locker room of pool building.

  53. Pool and Stadium Improvements Soil backfill work at storage room addition at pool building.

  54. Pool and Stadium Improvements Form work for concrete footings at storage room addition at pool building.

  55. Pool and Stadium Improvements Form work for concrete foundation walls at storage room addition at pool building.

  56. Pool and Stadium Improvements Masonry work at storage room addition at pool building.

  57. Pool and Stadium Improvements Home concession stand at Stadium where new serving counter and cabinets will be installed.

  58. CHINOOK ELEMENTARY BUILDING STRUCTURE IMPROVEMENTS PROGRESS: Contractor has begun assessment of existing conditions and initial demolition work. Additional deterioration of wood beams was discovered when contractor removed metal flashing that covered the beams. The structural engineer is working on design modifications to correct the additional deterioration. PERCENT COMPLETE: 10%

  59. Chinook Elementary Building Structure Improvements Delamination of glu-lam beam at covered walkway at front of school.

  60. Chinook Elementary Building Structure Improvements Previous beam repair at covered walkway.

  61. Chinook Elementary Building Structure Improvements Deteriorated beam at Gym roof.

  62. Chinook Elementary Building Structure Improvements Deteriorated wood and carpenter ant infestation at roof overhang.

  63. Chinook Elementary Building Structure Improvements Drill bit showing depth of dry rot at covered walkway beam.

  64. AUBURN HIGH SCHOOL MODERNIZATION AND RECONSTRUCTION PROGRESS : Design development is 80% complete. Value engineering study completed. Construction phasing analysis, energy life cycle cost analysis, and infiltration testing underway . PERCENT COMPLETE: 30% (design phase)

  65. Auburn High School Modernization and Reconstruction Water infiltration test that will be used in design of the storm water detention system.

  66. Auburn High School Modernization and Reconstruction Agenda for first 3 days of 5 day value engineering study.

Recommend


More recommend