winooski burlington us rts 2 7 bridge scoping study ag e
play

Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study Ag e nda - PowerPoint PPT Presentation

CHITTENDEN COUNTY REGIONAL PLANNING COMMISSION Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study Ag e nda : 1. We lc o me / I ntro duc tio ns 2. Sc o pe o f Wo rk Ove rvie w: Pre se nta tio n fro m Mc F a rla nd Jo hnso n Majo


  1. CHITTENDEN COUNTY REGIONAL PLANNING COMMISSION Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study

  2. Ag e nda : 1. We lc o me / I ntro duc tio ns 2. Sc o pe o f Wo rk Ove rvie w: Pre se nta tio n fro m Mc F a rla nd Jo hnso n • Majo r tasks and mile sto ne s; • b ridg e and traffic alte rnative s; • Adviso ry Co mmitte e me e ting s and c o mmitte e ro le ; 3. Adviso ry Co mmitte e I nput: Que stio ns/ c o nc e rns fro m me mb e rs’ pe rspe c tive s 4. Me mb e rs/ Othe r I te ms 5. Ne xt Ste ps 6. Ne xt Me e ting : Re vie w/ Disc uss pro je c t purpo se a nd ne e d sta te me nt

  3. Ma jo r T a sks a nd Mile sto ne s: Task/Milestone Estimated Timeline Data Collection & Analysis May – July 2017 Purpose and Need Statement July – September 2017 Public Participation June 2017 – May 2018 Advisory Committee Mtgs. • Project Website and Web Survey • Stakeholder Outreach • Draft Alternatives Workshop & Local Concerns Mtg. • Development of Alternatives September 2017 – February 2018 Evaluation of Alternatives February – May 2018 Alternatives Presentation June 2018 Winooski City Council • Burlington City Council • Scoping Report June – August 2018

  4. E xisting Bridg e :

  5. E xisting Bridg e :

  6. E xisting Bridg e :

  7. Pro po se d Bridg e – F o ur Alte rna tive s 1. Bridg e Re ha b ilita tio n 2. Bridg e Supe rstruc ture Re pla c e me nt a nd Sub struc ture Wide ning 3. Bridg e Re pla c e me nt – T wo -Spa n Struc ture 4. Bridg e Re pla c e me nt – Sing le Spa n Struc ture

  8. E xisting Ro a dwa y a nd T ra ffic On So uth e nd o f Brid g e L o o king so uth to wa rd s Burling to n. On Bridg e lo o king no rth to wa rds Wino o ski.

  9. E xisting Ro a dwa y a nd T ra ffic T ra ffic a ro und Ro ta ry Pa rk in Wino o ski. Wino o ski e nd o f b ridg e lo o king so uth.

  10. L a ne Co nfig ura tio ns – Pe rma ne nt T ypic a l Se c tio ns 1. T hre e L a ne s • T wo no rth a nd o ne so uth 2. F o ur L a ne s

  11. L a ne Co nfig ura tio ns – T e mpo ra ry T ypic a l Se c tio ns during Bridg e Co nstruc tio n 1. Alte rna ting One -Wa y T ra ffic (two -pha se c o nstruc tio n) 2. Sing le L a ne Ma inta ine d in E a c h Dire c tio n (thre e -pha se c o nstruc tio n) 3. Co mple te Clo sure

  12. Adviso ry Co mmitte e Ro ste r Name Association Email Jon Griffin VTrans Jonathan.Griffin@vermont.gov Dick Hosking VTrans Dick.Hosking@vermont.gov Amy Bell VTrans amy.bell@vermont.gov Peter Wernsdorfer Winooski pmwernsdorfer@winooskivt.org Brian Corrigan Winooski Deputy Mayor bcorrigan@winooskivt.org Ryan Lambert Winooski rlambert@winooskivt.org Nicole Losch Burlington NLosch@burlingtonvt.gov Sharon Bushor Burlington City Council sbushor@burlingtonvt.gov Dave Armstrong GMT darmstrong@ridegmt.com Sandy Thibault CATMA sandy@catmavt.org Katelin Brewer-Colie Local Motion katelin@localmotion.org David Keelty UVM Medical Center Dave.Keelty@uvmhealth.org Richard Hillyard Burlington Ward 1 NPA pompeyhccc@hotmail.com Wayne Senville Alternate for Ward 1 wsenville@gmail.com

  13. Adviso ry Co mmitte e – F o ur Me e ting s Meeting Date Kickoff June 7, 2017 Purpose and Need Late July 2017 Development of Alternatives Late September 2017 Evaluation of Alternatives April 2018

  14. Ag e nda (c o ntinue d): • Adviso ry Co mmitte e I nput: Que stio ns/ c o nc e rns fro m me mb e rs’ pe rspe c tive • Me mb e rs/ Othe r I te ms • Ne xt Ste ps • Ne xt Me e ting : Re vie w/ Disc uss pro je c t purpo se a nd ne e d sta te me nt

Recommend


More recommend