winner
play

WINNER Site 13 1PS8 SW 5 100% Design/ Construction Kick-Off - PowerPoint PPT Presentation

Orange County Public Schools WINNER Site 13 1PS8 SW 5 100% Design/ Construction Kick-Off Community Meeting School Board Member District 5 Kathleen Kat Gordon Nov 18, 2015 Superintendent Barbara Jenkins Chief


  1. Orange County Public Schools WINNER Site 13 1‐PS8‐ SW ‐5 100% Design/ Construction Kick-Off Community Meeting School Board Member District 5 Kathleen “Kat” Gordon Nov 18, 2015 Superintendent Barbara Jenkins Chief Facilities Officer John Morris

  2. Orange County Public Schools Site 13 1‐ PS 8‐ SW ‐5 Meeting Agenda Nov 18, 2015 RBELC 6 pm • Welcome – Executive Area Director Jennifer Cupid-McCoy • Introductions – Facilities Construction Planning Director Jessma Lambert • Project Update – Architect: Baker Barrios Architects / HKS Architects CM: Williams Company • Questions and Answers Contact: Jessma Lambert at 407-317-3700 • Adjournment 2 Logistic Site Plan

  3. Orange County Public Schools North 3 Acreage

  4. Orange County Public Schools North 4 Vicinity Plan

  5. Orange County Public Schools North 5 Conceptual Site Plan

  6. Orange County Public Schools SITE INFORMATION: 240 Parking spaces 54 cars queuing 6 Bus Stacking 6 Conceptual Aerial Perspective

  7. Orange County Public Schools North 7 Conceptual Landscape Plan

  8. Orange County Public Schools North 8 Conceptual First Floor Plan

  9. Orange County Public Schools North 9 Conceptual Second Floor Plan

  10. Orange County Public Schools North 10 Conceptual Third Floor Plan

  11. Orange County Public Schools 11 PK-5 Classroom Example

  12. Orange County Public Schools 12 K-5 Collaborative Space Example

  13. Orange County Public Schools 13 BLDG 200- Floor 1-2: Media Center Example

  14. Orange County Public Schools 14 BLDG 300 A- Floor 1: Cafeteria Example

  15. Orange County Public Schools 15 BLDG 300 A- Floor 1: Art & Music Example

  16. Orange County Public Schools 16 BLDG 400- Floor 1: Gymnasium Example

  17. Orange County Public Schools 17 BLDG 700 A- Floor 1: Rosen PreSchool

  18. Orange County Public Schools 18 Example BLDG 800- Floor 1: Clinic

  19. Orange County Public Schools 19 Example BLDG 900- Floor 1-2: Boys & Girls Club

  20. Orange County Public Schools 20 Conceptual Rendering

  21. Orange County Public Schools Benefits of Building Green Schools: • Conservation of resources • Improved student performance • Improved indoor air quality • Increased teacher and staff satisfaction and retention • Increased parental support • Lower operating costs The OCPS Downtown PS-8 is designed to meet the Green Globes sustainable building standards. Sustainable Features of the Downtown PS-8 Project Include: Site • Reduced water use through water monitoring for irrigation system • Drought tolerant planting Buildings • Light colored roof to reduce heat gain and improve energy performance • Energy Star rated equipment • Water saving toilets, faucets, and fixtures • Daylight in all classrooms • Daylight in over 75% of all spaces • Thermally efficient windows • Ozone-friendly HVAC system • Energy efficient lighting 21 Sustainability

  22. Orange County Public Schools 22 Logistic Site Plan

  23. Orange County Public Schools 23 Logistic Site Plan

  24. Orange County Public Schools 24 Logistic Site Plan

  25. Orange County Public Schools 25 Logistic Site Plan

  26. Orange County Public Schools START FINISH Design Programming Phase 01/30/15 04/03/15 Concept/ Schematic Design 04/02/15 05/29/15 Design Development 05/29/15 7/31/15 Construction Documents 08/03/15 10/30/15 Construction 01/18/16 05/04/17 26 Schedule

  27. Orange County Public Schools Questions and Answers 27