The image part with relationship ID rId2 was not found in the file. Upper Harbor Terminal . North Minneapolis Park
Agenda 1. Agenda Overview and clarifications 2. Project Updates 3. Timeline 4. Overhead Powerline Update 5. North Minneapolis Park Exercises 6. Group Discussion 7. Public Comment Period 8. Adjourn The image part with relationship ID rId2 was not found in the file. 2
Park Design Process Continued Community Engagement Previous Program Design + Community Model Operations Engagement Community Advisory Committee 3 YOU ARE HERE
CAC Timeline • December o Northside Park brainstorm o Discuss direction of park program and design • January o Show draft program model (key components to be included in the park), site analysis, and industrial structures options o Design workshop (CAC and public invited) 96 • February o Draft park concepts o Timeline may vary depending on engagement around park concepts • March - May o Refine park concepts and narrow alternatives to preferred park concept 5 4
Overhead Utilities/ Powerline Update 5
Options 1 and 2 96 5 6
Option 3 96 5 7
Overhead Utilities/Powerline Discussion • Option 1: Maintain overhead line over parkway o Requires 1 (likely monopole) near river and 1 back near tracks, 2 poles total o 1 pole on park land • Option 2: Bury line under parkway o Requires 2 transition poles near the river and 2 back near the railroad tracks, 4 poles total. Poles may need to be fenced and are more visually obtrusive than the monopoles. o Costs additional funds ($20K+) for study to determine if feasible. May not be feasible. o Costs additional funds to bury (estimated $3+ million) would reduce MPRB construction budget of appx 96 $7.75 million. Cost cannot be fully determined without paying for the additional study. • Option 3: Full span line from Xcel to near railroad tracks o Requires 1 or 2 poles near the tracks o No poles on park land o Line is over an area of park land and is at a higher elevation o Cost is comparable to Option 1 5 8
Northside Park 9