Exhibit L Towards an Onehunga Foreshore Concept Plan Workshop Two : 24 May 2017 Stuart Houghton, Heather Wilkins stuart.houghton@bofgamiskell.co.nz heather.wilkins@bofgamiskell.co.nz
Outline • Recap on Guiding Principles • Design Investigations Segments 1-5 • Proposed Next Steps Towards an Onehunga Foreshore Concept Plan | Workshop 1 | Boffa Miskell | 24 May 2017
GUIDING PRINCIPLES Learnings from Mangere Future Streets | Auckland Transport Safer Communities Programmme 2017 Towards an Onehunga Foreshore Concept Plan | Workshop 1 | Boffa Miskell | 24 May 2017
1. Refmect Mana Whenua Cultural Narrative/ Values 2. Connected Networks 3. Design For All Users 4. Commuters Fast & Slow Recreational Future Everyday 5. Work At The Infrastructural Scale 6. Visual Cues 7. Build For The Future 8. A Busy & Diverse Hub 9. Reveal Layers Of The Landscape
DESIGN OPTIONS Learnings from Mangere Future Streets | Auckland Transport Safer Communities Programmme 2017 Towards an Onehunga Foreshore Concept Plan | Workshop 1 | Boffa Miskell | 24 May 2017
CONCEPT OPTIONS - SECTION 1 - 2
File Ref: A17076_Concept Options.indd WO RKING PRO G RESS TAUMANU RESERVE MANUKAU CRUISING CLUB EXISTING TRANSPOWER PYLON EXISTING BREAK WATER LOOKOUT OPPORTUNITY ABOVE FRESH WATER OUTLET SOUTH-WESTERN MOTORWAY CONCRETE WASTE WITHIN RIPRAP EDGE TO BE TIDIED EXISTING TRANSPOWER PYLON P Option 1 Design R AOTEA SEA SCOUTS O P O • Cantilevered timber boardwalk hugging S E D existing edge E A S • Pause point opportunities along the journey T - W E • Section of piled boardwalk within ONF along S T Sea Scouts building L I N K - LOOKOUT OPPORTUNITY TO MANGERE MT. EXISTING SEA WALLS TO BE RETAINED REMNANT WHARF PILES TO BE RETAINED EXISTING BIRD MANUKAU HARBOUR ROOSTING SITES MANGAREI BRIDGE T R P O A G U N H N E O project name This plan has been prepared by Bofga Miskell Limited on Legend the specifjc instructions of our Client. It is solely for our COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) Client’s use in accordance with the agreed scope of work. Sections 1 -2: Option 1 Any use or reliance by a third party is at that party’s own ORPHEUS DRIVE - COMMUTER PATH (NOM. 5M WIDE) risk. Where information has been supplied by the Client or obtained from other external sources, it has been | Date: 09 may 2017 | revision: 0 | assumed that it is accurate. No liability or responsibility 0 75m ONF BOUNDARY / EXTENT Plan prepared for Panuku Development Auckland and NZTA by Bofga Miskell is accepted by Bofga Miskell Limited for any errors or omissions to the extent that they arise from inaccurate Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: www.boffamiskell.co.nz information provided by the Client or any external source. 1:2,500 @ A3
File Ref: A17076_Concept Options.indd WO RKING PRO G RESS TAUMANU RESERVE MANUKAU CRUISING CLUB EXISTING TRANSPOWER PYLON EXISTING BREAK WATER EDGE ACCESS EXISTING TRANSPOWER PYLON SOUTH-WESTERN MOTORWAY LOOKOUT OPPORTUNITY ABOVE FRESH WATER OUTLET CONCRETE WASTE WITHIN RIPRAP EDGE TO BE TIDIED EXISTING TRANSPOWER PYLON P Option 2 Design R AOTEA SEA SCOUTS O P O • Cantilevered and piled timber boardwalks WRAPPED AROUND DECKING S E TO RE-PURPOSED AOTEA alternating experience between hugging D SEASCOUTS BUILDING E A existing edge and sections out over water S T - LEVEL CHANGE / WATERS EDGE OPPORTUNITY W • Pause point and waters edge opportunities E S along the journey T L I N K • Boardwalk section over water frames ONF boundary with short section across ONF at LOOK OUT OPPORTUNITY TO MANGERE MT. historic breach point EXISTING SEA WALLS TO BE RETAINED REMNANT WHARF PILES TO BE RETAINED EXISTING BIRD MANUKAU HARBOUR ROOSTING SITES MANGAREI BRIDGE T O R P A N G U H N E O NORTHERN FACING EDGE FOR BOAT LAUNCH OPPORTUNITY PROPOSED LAND RECLAMATION project name This plan has been prepared by Bofga Miskell Limited on Legend the specifjc instructions of our Client. It is solely for our COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) Client’s use in accordance with the agreed scope of work. Sections 1 -2: Option 2 Any use or reliance by a third party is at that party’s own ORPHEUS DRIVE - COMMUTER PATH (NOM. 5M WIDE) risk. Where information has been supplied by the Client or obtained from other external sources, it has been | Date: 09 may 2017 | revision: 0 | assumed that it is accurate. No liability or responsibility 0 75m ONF BOUNDARY / EXTENT Plan prepared for Panuku Development Auckland and NZTA by Bofga Miskell is accepted by Bofga Miskell Limited for any errors or omissions to the extent that they arise from inaccurate Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: www.boffamiskell.co.nz information provided by the Client or any external source. RECLAIMED LAND 1:2,500 @ A3
File Ref: A17076_Concept Options.indd WO RKING PRO G RESS TAUMANU RESERVE MANUKAU CRUISING CLUB EXISTING TRANSPOWER PYLON PROPOSED LAND RECLAIMATION EXISTING BREAK WATER EDGE ACCESS WATERS EDGE OPPORTUNITY SOUTH-WESTERN MOTORWAY LOOKOUT OPPORTUNITY ABOVE FRESH WATER OUTLET CONCRETE WASTE WITHIN RIPRAP EDGE TO BE TIDIED EXISTING TRANSPOWER PYLON P Option 3 Design R AOTEA SEA SCOUTS O P O • Combination of new reclamation and piled S E D timber boardwalks E A S • New reclaimed waterfront land between T - W existing breakwater and Manukau Cruising E S T Club L I N K • Cantilevered and piled timber boardwalks alternating experience between hugging EXISTING SEA WALLS TO BE REATINED existing edge and sections out over water LEVEL CHANGE / WTERS EDGE OPPORTUNITY • All structures outside the ONF REMNANT WHARF PILES TO BE RETAINED OPPORTUNITY TO REFERENCE HISTORIC CRATER BREACH MANUKAU HARBOUR MANGAREI BRIDGE T O R P A N G U H N E O NORTHERN FACING EDGE FOR BOAT LAUNCH OPPORTUNITY PROPOSED LAND RECLAIMATION project name This plan has been prepared by Bofga Miskell Limited on Legend the specifjc instructions of our Client. It is solely for our COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) Client’s use in accordance with the agreed scope of work. Sections 1 -2: Option 3 Any use or reliance by a third party is at that party’s own ORPHEUS DRIVE - COMMUTER PATH (NOM. 5M WIDE) risk. Where information has been supplied by the Client or obtained from other external sources, it has been | Date: 09 may 2017 | revision: 0 | assumed that it is accurate. No liability or responsibility 0 75m ONF BOUNDARY / EXTENT Plan prepared for Panuku Development Auckland and NZTA by Bofga Miskell is accepted by Bofga Miskell Limited for any errors or omissions to the extent that they arise from inaccurate Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: www.boffamiskell.co.nz information provided by the Client or any external source. RECLAIMED LAND 1:2,500 @ A3
File Ref: A17076_Concept Options.indd WO RKING PRO G RESS TAUMANU RESERVE MANUKAU CRUISING CLUB EXISTING TRANSPOWER PYLON PROPOSED LAND RECLAMATION WATERS EDGE OPPORTUNITY SOUTH-WESTERN MOTORWAY CONCRETE WASTE WITHIN RIPRAP EDGE TO BE TIDIED EXISTING TRANSPOWER PYLON P Option 4 Design R AOTEA SEA SCOUTS O P O • Combination of new reclamation and bridged S E D timber boardwalks E A S • New reclaimed waterfront land between T - W existing Manukau Cruising Club and Aotea E S VOLCANIC TUFF FEATURE PRESERVED T Sea Scouts L COMPLETE WITH NATURAL TIDAL FLUSHING I N K • Beach reclamation along the new coastline to provide boat launch opportunities along with EXISTING SEA WALLS TO BE RETAINED public amenity • Series of small island connected by boardwalk (potential for piled or fmoating structures) REMNANT WHARF PILES TO BE RETAINED • All structures and reclamation outside the ONF OPPORTUNITY TO REFERENCE HISTORIC CRATER BREACH MANUKAU HARBOUR MANGAREI BRIDGE T O R P A N G U H NORTHERN FACING EDGE FOR BOAT N E O LAUNCH OPPORTUNITY PROPOSED LAND RECLAMATION project name This plan has been prepared by Bofga Miskell Limited on Legend the specifjc instructions of our Client. It is solely for our COASTAL WALKWAY - RECREATIONAL PATH (5M WIDE) Client’s use in accordance with the agreed scope of work. Sections 1 -2: Option 4 Any use or reliance by a third party is at that party’s own ORPHEUS DRIVE - COMMUTER PATH (NOM. 5M WIDE) risk. Where information has been supplied by the Client or obtained from other external sources, it has been | Date: 09 may 2017 | revision: 0 | assumed that it is accurate. No liability or responsibility 0 75m ONF BOUNDARY / EXTENT Plan prepared for Panuku Development Auckland and NZTA by Bofga Miskell is accepted by Bofga Miskell Limited for any errors or omissions to the extent that they arise from inaccurate Project Manager: stuart.houghton@bofgamiskell.co.nz | Drawn: APr | Checked: www.boffamiskell.co.nz information provided by the Client or any external source. RECLAIMED LAND 1:2,500 @ A3
CONCEPT OPTIONS - SECTION 3