southwest lehigh substation
play

Southwest Lehigh Substation This substation is at the intersection - PowerPoint PPT Presentation

Southwest Lehigh Substation Power Transformer Purchase Southwest Lehigh Substation This substation is at the intersection of State Road 82 and Alabama Road Substation planned energization date is 2017 The existing spare transformer


  1. Southwest Lehigh Substation Power Transformer Purchase

  2. Southwest Lehigh Substation • This substation is at the intersection of State Road 82 and Alabama Road • Substation planned energization date is 2017 • The existing spare transformer will be installed in Trafalgar Substation this year • This will become the spare transformer until it is installed.

  3. Purchase Description • Purchase a 50 MVA, non-LTC power transformer for Southwest Lehigh Substation with delivery in 2016.

  4. Bidders List Electric Sales Associates Electric Supply Weston, Florida Tampa, Florida SPX / Waukesha GE Prolec Waukesha, Wisconsin Apodaca, Mexico Engineered Power Products Irby West Palm Beach, Florida Orlando, Florida Pennsylvania Transformer GE Prolec Canonsburg, Pennsylvania Apodaca, Mexico Superior Power Products WESCO Cape Coral Florida Orlando Florida ABB Delta Star Crystal Springs, Mississippi Lynchburg, Virginia

  5. Bid Evaluation Bid Load Auxiliary Total No Load Bidder Losses Price Losses Losses Cost Bidder #1 $514,017 $90,476 $404,480 $423 $1,009,396 Higher Higher Bidder #2 --- --- --- Bid Total Cost Higher Higher Bidder #3 --- --- --- Bid Total Cost Higher Higher Bidder #4 --- --- --- Bid Total Cost Higher Higher Bidder #5 --- --- --- Bid Total Cost Higher Higher Bidder #6 --- --- --- Bid Total Cost

  6. Action Requested A motion to authorize the CEO to award the power transformer purchase to GE Prolec via Irby of Orlando, Florida, in the amount of $514,017.

Recommend


More recommend