SNGC Presentation SPANISH ELECTRICAL SYSTEM BREAKDOWN OF TOTAL - PowerPoint PPT Presentation

SNGC Presentation SPANISH ELECTRICAL SYSTEM BREAKDOWN OF TOTAL ELECTRICITY GENERATION IN SPAIN (%) NUCLEAR SOLAR WIND COMBINED CYCLE COAL HYDRO OTHERS COGENERATION, BIOMASS, 2 SPANISH ELECTRICAL SYSTEM NUCLEAR ENERGY FIGURES IN


  1. SNGC Presentation

  2. SPANISH ELECTRICAL SYSTEM BREAKDOWN OF TOTAL ELECTRICITY GENERATION IN SPAIN (%) NUCLEAR SOLAR WIND COMBINED CYCLE COAL HYDRO OTHERS COGENERATION, BIOMASS, … 2

  3. SPANISH ELECTRICAL SYSTEM NUCLEAR ENERGY FIGURES IN SPAIN NUCLEAR POWER PLANTS ELECTRICITY CAPACITY NUCLEAR POWER PLANTS ELECTRICITY GENERATION SPANISH TOTAL ELECTRICITY CAPACITY SPANISH TOTAL ELECTRICITY GENERATION 22 % NUCLEAR GENERATION VS TOTAL GENERATION (%) NUCLEAR CAPACITY VS TOTAL CAPACITY LOAD FACTOR OPERATION FACTOR 3

  4. SPANISH NUCLEAR INDUSTRY 4

  5. SPANISH NUCLEAR POWER PLANTS “ Different technology origin and reactors type” The Spanish nuclear program FRANCE started in 1960. First plant in operation was in 1968 Santa Mª de Garoña Asco I & II Trillo Trillo PORTUGAL Vandellós 1 Vandellós 2 Output Operation Plant name Supplier Phase (MWe) since J. Cabrera J. Cabrera PWR-W 160 1968 1st Almaraz 1 & 2 Sta. Mª Garoña BWR-GE 466 1971 1st Cofrentes Vandellós 1 GCR 400 1972 1st Almaraz 1 PWR-W 981 1981 2nd Almaraz 2 PWR-W 988 1983 2nd Ascó I PWR-W 1032 1983 2nd Cofrentes BWR-GE 1092 1984 2nd Ascó II PWR-W 1027 1985 2nd Vandellós 2 PWR-W 1087 1987 3rd Trillo PWR-KW 1067 1988 3rd 5

  6. SPANISH NUCLEAR INDUSTRY DEVELOPMENT First Stage: Decade of the 1960´s • Construction of: • José Cabrera NPP • Santa María de Garoña NPP • Vandellós I NPP • “Turn-key” construction projects with participation of Spanish engineering, construction and assembly companies, and electrical equipment manufacturers • High level qualification employment created • Technological development for the general industrial improvement 6

  7. SPANISH NUCLEAR INDUSTRY DEVELOPMENT Second Stage: Decade of the 1970´s •Construction of: • Almaraz NPP • Ascó NPP • Cofrentes NPP •Contracting by components with participation of Spanish engineering and equipment suppliers. 7

  8. SPANISH NUCLEAR INDUSTRY DEVELOPMENT Third Stage: decade of the 1980´s • Construction of: • Vandellós II NPP • Trillo I NPP • Spanish nuclear industry consolidation • Total supply of: • Major components • Nuclear fuel • Specialized services: training and in-service inspection 8

  9. LOCALIZATION OF SPANISH NPPS AT CONSTRUCTION 1 st PHASE 2 nd PHASE 3 rd PHASE Date Late 60´s Mid 70´s Early 80´s 3 reactors 5 reactors 2 reactors Localization Content 45% 75% 85% Main Equipment 25% 50% 90% Engineering 70% 80% 90% Construction 75% 100% 100% Spanish suppliers reached technical maturity back in the 80’s 9

  10. TECHNOLOGY EVOLUTION Turn key projects 1st. STAGE Local construction & detailed design Main components manufactured abroad NSSS Basic design from the OEM 2nd. STAGE Local design for basic and detailed engineering NPPs design & manufacturing in Spain 3rd. STAGE ENSA, ENUSA, Ringo and Tecnatom heavily involved SNGC companies are strong competitors in the international nuclear market with projects in more than Since the early 90’s 35 countries worldwide. Services and equipment supplier 10

  11. SNGC www.sngc.es 11

  12. SNGC MEMBER LOCATIONS Maliaño (ENSA) Zaragoza (RINGO) Juzbado ( ENUSA) Madrid (TECNATOM) 12

  13. SNGC HISTORY • 2006, Alliance between • ENSA • ENUSA • TECNATOM • March 2008, RINGO VÁLVULAS joins the team • July 2008. Consortium Kick-off. JV set up, focusing on Chinese market/companies • May 2010. Extension to other countries, (Spanish Nuclear Group for Cooperation) mainly: • India • Latin America • South Africa • MENA (Middle east North Africa) • Turkey 13

  14. SNGC MAIN ACTIVITIES • Commercial promotion of members • Marketing and coordination efforts • Participation in exhibitions and congresses • Specific seminar coordination: fuel; new build, … • Development of alliances and MOUs • New Market research and development • Early detection of opportunities • Intergovernmental coordination • Press releases and newsletter editions • Research of financing and governmental export credits 14

  15. SNGC COMPANIES PLAY A LEADING ROLE IN THE SPANISH NUCLEAR INDUSTRY” Institutional Framework On Nuclear Energy in Spain PARLIAMENT PARLIAMENT GOVERNMENT GOVERNMENT UTILITIES UTILITIES INDUSTRY INDUSTRY Nuclear Nuclear Safety Safety Council Council TECNATOM TECNATOM RINGO RINGO ENUSA ENUSA ENSA ENSA 15

  16. SNGC MEMBERS TECNATOM RINGO ENSA ENUSA • Large primary components • Supply of enriched • Licensing and V&V of new • Valve manufacturer, leader (Reactor pressure vessel, in the Nuclear market, uranium reactors steam generators, designing and • Fabrication of nuclear fuel • Training and development of internals) reloads and first cores. manufacturing Control, Gate, centralized training schools Globe Check, Butterfly • Fuel design, Core design • Spent fuel casks; fuel • Supply and licensing of and operation monitoring Diaphragm and ball valves, racks; auxiliary equipment; Control Rooms in all Nuclear classes. • Reload licensing and heat exchangers, etc… • Development of ISI safety analysis • Ringo is qualified according • Site and fuel services equipment and testing • Fuel inspection and repair to all the international including maintenance, systems equipment and services standards with special casks & racks activities / • Support Center for • Spent fuel management. mention to ASME III management operation, emergencies, • Logistic of nuclear and qualification N and NPT • Dismantling and severe accidents and radioactive transport. stamp holder and RCC-M decommissioning projects maintenance certification. 16

  17. TECHNOLOGY TRANSFER & LOCALIZATION CAPABILITIES TECNATOM • Pre-service & In-service inspection and testing engineering • Qualification and Dedication Engineering of Safety Class components • Development and supply of control rooms and simulators • Training Management of Licensed personnel & non licensed/ plant staff • Plant life Management and Plant life Extension programs ENUSA • Advanced fuel design and manufacturing • Fuel manufacturing and inspection technology and equipment • On-site fuel handling, inspection and repair ENSA • Steam Generators, Reactor Pressure Vessels and Internals manufacturing • Spent Fuel Racks and Casks and Fresh Fuel Casks manufacturing • NPP repair and maintenance services and procedures • NPP waste management equipment supply and techniques and procedures • Design, manufacturing, supply and installation of heat exchangers RINGO VALVULAS • Nuclear Safety related Valves manufacturing • Spare parts and valves services 17

  18. SNGC MEMBERS COMBINED CAPABILITIES “We offer a wide range of products and services” ENSA ENUSA TECNATOM RINGO • Design engineering √ √ √ √ • NSSS components, spent fuel casks and racks √ √ • Licensing √ √ √ √ • Construction and start-up √ √ • Nuclear fuel cycle √ • Pre-Service and In-Service inspection and testing √ √ • Control room and simulator √ • NPP operation support √ √ √ • Outage services √ √ √ • NPP Maintenance √ √ √ √ • Valves components √ • Spare part management √ √ • Nuclear waste and decommissioning √ √ • New reactors √ √ √ √ 18

  19. SNGC MAIN NUCLEAR PROJECTS EXPORT TO 35 COUNTRIES: USA, China, France, Finland, Germany, Sweden, South Africa, Mexico, Brazil, Argentina, Russia, etc. MAIN: PROJECTS: Steam Generators replacement in Spain: Engineering, Fabrication, Erection Power uprate at Laguna Verde NPP (Mexico) Reactor Vessel head replacement at Angra (Brazil) More than 100 Steams Generators deliveries to USA, France, China, Spain Control Rooms and Simulators supply in China, Argentina, Brazil, Mexico Joint venture company in China f or Inspection Services Supply of Nuclear Fuel to France, Belgium, Germany, Sweden, Finland, etc.. Spent fuel transport and storage casks for Spain, USA, China, etc. Life extension in several countries. Valve supply to different NPPs: Argentina, Mexico, Spain, China, Russia, etc. 19

  20. NUCLEAR CONTRACTS AWARDED IN CHINA TO SNGC COMPANIES TECNATOM Joint Venture CITEC: PSI/ISI CN Ling Ao, Ningde, Hongyanghe, Yangjiang, Fangchesnggan, Taishan Control rooms for CN Fuqing, Fangjianshan and Hainan - CNNC NPIC Electric penetrations for European NPPs Control room Back-up panels for Yanjiang 5&6 - CGN Training of plan operator and supervisors of Sanmen and Haiyang – CNNC and SPIC Back up panels for Fuqing 5&6 - CNNC ENSA Steam Generators - Qinshan II 1-4 NPP - CNNC Design, licensing and manufacturing of Spent fuel racks - Ling Ao 3&4 NPP - CGN Spent fuel transport cask - Daya Bay NPP - CGN Steam generators - Hainan NPP - CNNC Heat exchangers - Taishan NPP - CGN Steam generators - Sanmen NPP-CNNC Spent fuel transport cask - URC-CGN Boric Acid Columns - Taishan NPP -CGN Auxiliary equipment for casks Steam Generators electro polishing RINGO Different valves - Qinshan 1&2 - CNNC Spare parts for valves - CNEIC-CNNC ENUSA Fuel rods ultrasonic inspection equipment - CJNF-CNNC (Yibin factory) SICOM-COR fuel inspection equipment – SNPI-CGN Eddy current fuel inspection equipment – CJNF-CNNC (Yibin factory) 20