sngc member companies presentation ensa es
play

SNGC MEMBER COMPANIES PRESENTATION www.ensa.es 2 From Cantabria, - PowerPoint PPT Presentation

SNGC MEMBER COMPANIES PRESENTATION www.ensa.es 2 From Cantabria, North Coast of Spain Since 1973, permanent and continuous presence in civil nuclear equipment and services supply Owned by Sociedad Estatal de Participaciones


  1. SNGC MEMBER COMPANIES PRESENTATION

  2. www.ensa.es 2

  3. From Cantabria, North Coast of Spain… • Since 1973, permanent and continuous presence in civil nuclear equipment and services supply • Owned by Sociedad Estatal de Participaciones Industriales (SEPI) • Two subsidiary companies: • Enwesa (services) • WTS (engineering) • State of art facility • www.ensa.es Map Coordinates: Latitude 43º 25’ 3.61” N Longitude 3º 44’ 55.96” W …your Global Supplier 3

  4. Products and Services • Engineering • Manufacturing • Advanced Technology Centre • Inspection Services • Services at Plants Passion for Improvement 4

  5. NSSS Manufacturing Reactor Vessels: 12 Reactor Heads: 18 Reactor Internals: 11 Steam Generators: 125 Pressurizers: 7 Main Coolant Piping: 4 Total 177 NSSS Components 5

  6. Non NSSS Manufacturing Reactor Supports Fuel Casks Fuel Racks Heat Exchangers Fuel Bundle Heads Non Nuclear Total 188 Casks, and Racks in more than 20 NPPs 6

  7. Services Heat exchangers Casks loading & fuel handling Racks installation Decomissioning Installation in NPPs Special projects 7

  8. www.enusa.es 8

  9. ENUSA (40%) (60%) 60.010.000 € ACTIVITIES • PROCUREMENT OF ENRICHED URANIUM • DESIGN OF NUCLEAR FUEL • FABRICATION OF NUCLEAR FUEL • FUEL ASSOCIATED SERVICES • ENVIRONMENTAL PROJECTS • DIVERSIFICATION 9

  10. Fuel Engineering, Technology and Manufacturing Capabilities CORE DESIGN & LICENSING NPP OPERATIONAL SUPPORT PRODUCT DESIGN MANUFACTURING FUEL SERVICES ENUSA provides full scope service to its customers 10

  11. Enusa Fuel Products Portfolio BW BWR BWR PWR PWR • Garoña • Oskarshamn • Forsmark 3 • Ascó 1&2 • Doel 4 • Forsmark 2 • Gundrem. C • Vandellós • EDF (Several Plants) • Gundrem. B/C • Cofrentes • Almaraz 1&2 • Tihange 3 • Olkiluoto 1 • EDF GE14 GNF2 17x17 MAEF (12’’) 17x17 MAEF-XL/XLR (14’’) COMPONENTS VVER • Loviisa 2 VVER 440 11

  12. JUZBADO PLANT LAY-OUT Powder reception Transport container storage Laboratories Expedition docks Empty area Gadolinium Mechanical area Ceramic area Line Line 1 Pellets (back-up Line) Powder storage Line BWR final Line 2/3 pellets End plugs assembly machining Line 2/3/4 Fuel rods First weld Line 2/3/4 Skeleton lines 3/4 12

  13. On Site Fuel Services • Fresh fuel handling • Irradiated fuel and core components handling • Inspection of fuel leaks • Fuel repair and reassembly • Inspection and characterization of irradiated fuel • SICOM equipment inspection family • Other services 13

  14. Worldwide Experience. ENUSA ´ S FUEL Customers (Additionally Enusa and Tecnatom are supplying fabrication equipment to China Yibin factory and SNPI) PWR 17x17 12” BWR Ascó I–II Cofrentes SPAIN Vandellós II Sta. Mª Garoña Almaraz 1-2 PWR 17x17 12” PWR 17x17 14” Olkiluoto Forsmark   Blayais 1-2 Belleville 1  Chinon 1-2-3-4 Paluel 3 Oskarshamn Tricastin 2-3-4 Penly 1  Ringhals FRANCE St. Laurent 1-2   Dampierre 3-4 Ringhals Gravelines 1-2-4 PWR 15x15 BWR Gravelines Doel Ringhals 2 Ringhals 1   Paluel   SWEDEN Forsmark 1-2-3  Tihange  Penly  Gundremmingen Oskarshamn 1-3 Chinon  Belleville PWR 17x17 14”   St. Laurent  Dampierre Doel 4   BELGIUM Blayais Sta. Mª de Tihange 3 Tricastin Garoña  BWR   GERMANY Gundremmingen Vandellós-II  Ascó BWR Almaraz  FINLAND Olkiluoto Cofrentes 14

  15. www.ringospain.com 15

  16. History • Ringo Valvulas was established in 2000 by Walthon Weir Pacific management staff. Having more than 30 years experience in valves for nuclear application • Having manufactured more than 100.000 valves to 20 NPP in different countries. • Thanks to our experience we have became to be the 1st supplier of valves for Spanish NPP in only 5 years with 95% of market share in Spain. • Our supplies to NPPS also include references for other countries such us Mexico, China, Sweden, South Africa, Argentina & Switzerland • Since September 2006 we are installed in a new and modern plant. 16

  17. New Facilities The new plant started the activity at the beginning of September 2006. The surface of area is 7.000 square meters • 7.000 m2 of workshop • 1.500 m2 of offices. • Including 60tm crane NEW FACILITIES In 2.009, a 1.500 m 2 new facility for big In 2012, a 6000 m 2 new facility for Ringo valves is expanding its size valves ( up to 60” ) assembly and cryogenic and Subsea valves will be facilities. 7000 m2 area. testing has been adquired. finished Completion date June 2012 17

  18. Ringo Key Factors • WIDE RANGE OF VALVES MANUFACTURING / SUPPLY OF COMPLETE PACKAGES • CUSTOMER ORIENTED COMPANY • Flexibility • Design and manufacturing to match customer requirement • QUALITY • EXPERIENCE • Personnel with over 30 years experience in Nuclear Valves • SPARE PARTS SUPPLY / AFTER SALES SERVICE 18

  19. Our Products & Services Nuclear Products Services • Valves to ASME code section III subsections • Spare parts supply NB,NC,ND & NN • After sales services • Spare Parts characterization • Valves in accordance with AD Merkblatter & • Engineering support KTA; class RC1,RC2,RC3,RC4,RC5 & basic safety class A1, A2, A3 • Supervision of valves assembly at Plant site • Valves to RCC-M code, class 1,2,3 & NN • Valves to Russian standards OTT 87 • Including types such us: Gate, globe, check, butterfly, diaphragm, ball, bellow seal & control. • Dedicated valves 19

  20. Our Main Customers in The Nuclear Field Spain Around the world • Nuclear power plants: CFE Laguna Verde (Mexico)- BWR • C.N. Trillo - PWR • Beznau Nuclear Power plant (Switzerland) - PWR • C.N. Almaraz I & II - PWR • Qinshan I & II Nuclear Power plant (China) - PWR • C.N. Vandellos II - PWR • Ringhals & OKG Nuclear Power plants ( Sweden) – PWR • C.N. Zorita - PWR • DOEL NPP (Belgium) - PWR • C.N. Garoña - BWR • Koeberg (South-Africa)-PWR • C.N. Cofrentes - BWR • Forsmark Nuclear Power Plant ( Sweden ) • C.N. Asco I & II - PWR • Tihange Nuclear Power Plant ( Belgium ) • Atucha II Nuclear Power Plant ( Argentina ) • Embalse Nuclear Power Plant ( Argentina ) • Kakrapar Nuclear Power Plant ( India) • Cernavoda Nuclear Power Plant (Romania) • Bohunice Nuclear Power Plant (Eslovaquia) More than 100.000 valves installed in NPP 20

  21. www.tecnatom.es 21

  22. Tecnatom Facilities Chalón St Remy Cataluña (Oper-Suppr Center) CHINA MADRID (Shenzhen) (Head Quarter) Operation Support Centers at: Operation Support Centers at: Cofrentes NPP Cofrentes NPP SMª. Garoña NPP SMª. Garoña NPP Subsidiaries and Agents: Argentina, Brazil, Bulgaria, China, Mexico, Russia, Taiwan, Ukraine. 22

  23. Markets FOSSIL & DIVERSIFIED NUCLEAR RENEWABLE Combined C. Aeroespace, Plants in New Fossil Railway, Thermosolar Operation Projects Petrochemistry Wind Power 23

  24. Core Activities • “ Monitor and assess the structural integrity and operability of safety-related or critical components and systems” • Engineering services • Non-Destructive tests • Functional tests • Manufacturing of NDT & associated systems • R&D on above tasks • “Provide technical support for the safe, reliable and efficient operation of complex industrial facilities” • Recruiting & Training • Simulators development and operation and maintenance services • Operation engineering • Support to operations 24

  25. Technological Capabilities Inspection & Structural Integrity Testing: Systems & Components Operability Plant Operation Support Training Centres Developing, Manufacturing and Delivery of Equipment & Systems Safety Management New Nuclear Projects: (Advanced Reactors, Fusion) 25

  26. Technological Capabilities “New Nuclear Projects: (I)” “SBWR and ABWR Reactors of General Electric” Activity started in 1991 “AP600 of Westinghouse” Since 1997 “Lungmen NPP” (Taiwan): “ABWR of Gen. Electric” “ABWR & ESBWR of General Electric” “AP1000 & ABWR of Westinghouse” Now “Pebble Bed Modular Reactor” (PBMR PTY Ltd.) “CPR1000” (Chinese PWR)  Analysis of Human Factor Engineering  Design and Implementation of Man-Machine Interface Activities  Verification and Validation  Control Room design and full delivery  Development of Simulators and Simulation Models  Development of Procedures  Training of Operation Personnel  ISI Engineering and Services 26

  27. For any further information: www.sngc.es • Eduardo Aymerich, Managing Director eduardo@sngc.es • Amy Hu, Marketing Manager amyhu@sngc.es Thank you for your attention ! 27

Recommend