Roberts Bank Terminal 2 Project Public Consultation Overview - PowerPoint PPT Presentation

Roberts Bank Terminal 2 Project Public Consultation Overview Preliminary Environmental Mitigation Concepts portmetrovancouver.com Consultation: September 15 October 10, 2014 Fourth round of PMV-led public consultation on RBT2


  1. Roberts Bank Terminal 2 Project Public Consultation Overview Preliminary Environmental Mitigation Concepts portmetrovancouver.com

  2. Consultation: September 15 – October 10, 2014 • Fourth round of PMV-led public consultation on RBT2 • Multiple opportunities to participate: • Consultation discussion guide and feedback form • In-person meetings • Two small group meetings • Two open houses • Local Government Elected Roundtable (September 16 in Surrey) • Port Community Liaison Committee small group meeting (October) • Online feedback form (portmetrovancouver.com/ RBT2) • Online discussion forum (porttalk.ca/ RBT2) • Information line 2 portmetrovancouver.com 2

  3. MEETI NG SCHEDULE Meeting Date Tim e Location Small Group Thursday, 2: 00 p.m. – Coast Meeting September 25 4: 00 p.m. Tsawwassen Inn, Delta Open House Thursday, 5: 00 p.m. – Coast September 25 8: 00 p.m. Tsawwassen Inn, Delta Open House Saturday, 10: 00 a.m. – Kin House, September 27 1: 00 p.m. Delta Small Group Monday, 6: 00 p.m. – Delta Town & Meeting September 29 8: 00 p.m. Country Inn, Delta p o r t m e t r o v a n co u v e r.co m 3

  4. CONSULTATI ON NOTI FI CATI ON • Notification began week of September 2, 2014 • Notification methods include: • Email notification • Newspaper advertisements • Postcards • Twitter • Phone calls • Letters to Mayors and Councils p o r t m e t r o v a n co u v e r.co m 4

  5. CONSULTATI ON OVERVI EW • Providing information regarding the Project, including: • Project rationale • Environmental assessment process • PMV is seeking feedback on proposed mitigation measures in a number of areas, including: • Light • Noise and Vibration • Air Quality • Onsite Habitat Concepts for Marine Vegetation, Invertebrates, Marine Fish and Coastal Seabirds p o r t m e t r o v a n co u v e r.co m 5

  6. NEXT STEPS Discussion guide available September 15 th • • Input will be considered, along with technical and economic information, and information obtained from Aboriginal groups and regulators, as PMV prepares and finalises the Environmental Impact Statement p o r t m e t r o v a n co u v e r.co m 6

  7. RBT2 PROJECT UPDATES • Working Group • Next Meeting: Early 2015 – to provide a walkthrough of the EIS after it is filed • CEA Agency Public Comment Period on RBT2 Draft Panel Terms of Reference • submit written comments on the draft Terms of Reference to RobertsBank@ceaa-acee.gc.ca by Septem ber 2 2 , 2 0 1 4 • Information Sheets regarding the following: • Air Quality • Field Studies Program • Container Movement • EA Process • Noise and Vibration Are available on-line at: www.robertsbankterminal2.com/ information-centre/ p o r t m e t r o v a n co u v e r.co m 7

  8. SMALL GROUP MEETI NG - PCLC • In addition to the consultation dates and times noted earlier, there is an opportunity to have a small group meeting with this committee. • Dates/ Times: • Monday, October 6 • 8am-10am • Tuesday, October 7 • 8am-10am • 6pm-8pm • Location: TBD p o r t m e t r o v a n co u v e r.co m 8