ATL WEST DECK COMPONENT Project Information Session / Meet and Greet # 3 Holder-Austin-Moody-Bryson, a Joint Venture October 10 th , 2017 Agenda 1. HAMB, a JV Company Overview 2. ATL West Deck Project Description / Update 3. Trade


  1. ATL WEST DECK COMPONENT Project Information Session / Meet and Greet # 3 Holder-Austin-Moody-Bryson, a Joint Venture October 10 th , 2017

  2. Agenda 1. HAMB, a JV Company Overview 2. ATL – West Deck Project Description / Update 3. Trade Package Information 4. HAMB Prequalification Process 5. HAMB Procurement Process 6. Meet & Greet

  3. HAMB, JV Company Overview Our Joint Venture – Construction Manager at Risk » Holder Construction Company » Austin Commercial » C.D. Moody Construction » Bryson Constructors

  4. ATL – West Deck Project Overview » 7 Story, Cast-In-Place Parking Deck » +/- 2,000,000 Total Square Feet » Interior Courtyard at all levels » +/- 5,700 Parking Spaces » 3,000 SF interior office build-out » New Elevated Pedestrian Bridge connecting to existing rail » RCC Parkway – New Elevated Bridge / Intersection » Project EBO Goals – 17.5% MBE & 13% FBE, 30.5% Total » August 2017 – Start date » Fall 2019 – Project Completion

  5. ATL – West Deck Project Overview / Update – August 2017

  6. ATL – West Deck Project Overview / Update – September 2017

  7. ATL – West Deck » INSERT IMAGE

  8. ATL – West Deck » INSERT IMAGE

  9. ATL – West Deck

  10. ATL – West Deck

  11. ATL – West Deck

  12. ATL – West Deck » INSERT IMAGE

  13. ATL – West Deck Trade Package Information Design Team / Document Release Information - HFWT, A Joint Venture HKS, INC Fitzgerald Collaborative Group Walker Parking Consultants Thornton Tomasetti - Bidding Documents – 95% “Construction Documents” - Drawing Release Date – 10/19/2017 - 100% IFC Drawing Release Date - 11/16/2017 - Drawing Invites will be sent directly to each bidder via HelixProject on 10/20/17

  14. ATL – West Deck Trade Package Information Roadway / Bridge Package (Turnkey) Structural / Misc. Steel Steel H-Piles PED Bridge Steel Framing Roadway Utilities Skin Steel Support MSE Walls Steel Railings Bridge Extension Bollards Site Walls / Paving Misc. Framing / Support Signalization Site Utilities (Remaining) Glass / Glazing Water Utilities Office Windows Sanitary Utilities Curtainwall (Elevator Core Wall) Glass Doors

  15. ATL – West Deck Trade Package Information Exterior Skin Metal Panels Fabricoil Skin System Interior Deck Column Wraps Artwork Framing PED Bridge Insulated Panels Architectural Louvers Canopy Waterproofing ETFE Canopy Fluid Applied Below Grade Steel Framing Foundation Drains Steel Wiring / Diagrid Expansion Joints PED Walkway Traffic Coatings Misc. Sealants / Caulking

  16. ATL – West Deck Trade Package Information Masonry Paint Office Walls Office Areas IDF/Electrical Closet Walls Edge Paint Conditions Door Frame Install Interior Elevator Core Walls Misc. Paint Frames / Doors Drywall Doors / Frames / Hardware Office Walls Office Doors / Frames / Hardware Office Ceilings IDF / Electrical Room D/F/H Wall Insulation Hardware for Glass Sliding Doors Wall Framing Door Installation

  17. ATL – West Deck Trade Package Information Specialties Asphalt Paving / Striping / Curb Restroom Partitions Perimeter Fire Lane Paving/Curbs Restroom Accessories Exterior Flatwork / Paving Adjustments Fire Extinguishers / AED Units Space Striping (5,700 spaces) Custom Striping Directional Striping Hardscape / Landscape Parking Controls Site Walls Cameras / License Plate Readers Site Heavy Duty Paving Access Control / Monitoring Trees / Shrubs / Sod Entrance / Exit Lanes Site Amenities Space Availability (Red/Green) Hardware for Systems Special Systems Entrance Security Booths Fiber / Security / Low Voltage

  18. ATL – West Deck Trade Package Information Signage Millwork Code Required Signage Office Area Millwork West Deck Signage Wayfinding Signage Fire Protection Site Security / Fencing Deck / PED Bridge Dry System Permanent Fencing Office Sprinkler System Access Gates Roofing Flooring Roofing at Stair Enclosures Carpet / Tile / Resilient / Base Roofing at Elevator Cores Loading Dock Equipment Corner Guards / Edge Angles

  19. ATL – West Deck Prequalification Process » Visit www.hambjvteam.com » Click on Prequalification Tab » Download, Complete and Return the Prequalification Form to Doretha Smith (dsmith@hambjv.com) » HAMB will review Prequalification results for each package » All contracts over $5,000,000 must be a Joint Venture » Joint Venture must be with business owner of different race and/or gender » Prequalification letters will be issued by Package » Prime Subcontractor » Sub-Prime Subcontractor

  20. Prequalification Process

  21. Prequalification Process

  22. Prequalification Process

  23. ATL – West Deck Procurement Process » Basis of Evaluation » Pricing » Completion of “Scope Checklist” » Plan to Execute the Work » EBO Participation Plan » Workforce Development Plan » Project Team » Schedule » Unit Prices Bid Due Dates – 11/10/17, 3 weeks after drawings released *Based on size / scope, certain bid package due dates may extend past 3 weeks

  24. Prequalification Process

  25. Advertisements Request for Qualifications Outreach Information Sessions, Association Meetings, Industry Events Subs Complete Prequalification Statements and Return to HAMB Prequalification Subs Notified of Status Available Status: Prime Subcontractors, Sub-Prime Subcontractors RFP Issued to Subs HAMB Forms of Agreement Pre-Proposal Meeting Discuss Project Scope, Prime Subs and Sub-Prime Subs Network Proposal Submission Sealed Envelope to HAMB Scope Meetings Scope Review with Each Firm that Submits Final Bid Evaluation Final Bid Evaluation Presented to COA,DOA Owner Approval of Subcontract Award Owner Approval HAMB Awards the Work to Successful Proponent Subcontract Award HAMB Issues Subcontract to Successful Proponent Issue Subcontract

  26. ATL – West Deck Scope Checklist Format

  27. THANK YOU FOR COMING! ATL – WEST DECK MEET AND GREET PRESENTATION IS POSTED TO WWW.HAMBJVTEAM.COM