port of san francisco
play

Port of San Francisco Marine Structural Projects IV, (Pier 29 & - PowerPoint PPT Presentation

Port of San Francisco Marine Structural Projects IV, (Pier 29 & 31.5 Substructure Repair) Contract No. 2790 January 3, 2018 AGENDA 1. Welcome & Introductions Andre Antonio 2. Project Overview Jonathan Roman 3. CMD Finbarr


  1. Port of San Francisco Marine Structural Projects IV, (Pier 29 & 31.5 Substructure Repair) Contract No. 2790 January 3, 2018

  2. AGENDA 1. Welcome & Introductions – Andre Antonio 2. Project Overview – Jonathan Roman 3. CMD – Finbarr Jewell 4. OLSE– Anna Liu 5. OEWD – Ian Fernando 6. Bid Documents – Andre Antonio 7. Questions

  3. Bundled separate Pier 29 and 31.5 projects into one construction project • Engineering for each pier was done by different firm. • Port no longer has contract for firm that did Pier 29. • Therefore, there are separate specifications for the work at each of the • piers. Pier 29 • Pier 31.5 (which includes portions of Pier 31 and 33 Aprons) • Environmental Requirements • Bidder Qualifications • Reference Documents •

  4. U.S. Longshore and Harborworkers’ Act Insurance (Section 00 73 16) • Section 01 57 20 – Construction in Water Bodies or Near San Francisco Bay • Environmental Requirements o RWQCB Order R2-2016-0039 Port of SF Maintenance Program o NOAA/NMFS Concurrence & Response for Port of SF Maintenance Program o BCDC Permit No. M1977.017.19 Submittals • o Spill Prevention and Control Plan o Environmental Health and Safety Plan o Best Management Practices (BMPs). See drawings and Section 01 57 13.

  5. Pier 29 to have multiple contractors working simultaneously (Section 01 31 • 13-1.03) Pier 27 Cruise Terminal will remain operational (Section 01 31 13-1.03) • o 33 CFR 165.1183(b)(1) – 100 yards ahead, astern and extending 100 yards along either side of any cruise ship. o Cruise Ship Schedule - http://sfport.com/cruise Pier 31.5 an active terminal for Alcatraz Tours operated by Hornblower • Schedule Milestones • Address the Technical Specs •

  6. Presented By: Finbarr Jewell Local Business Enterprise Goal = 3% 1.1% MBE 0.2% WBE 1.7% OBE Refer to Section 00 22 11 for details.

  7. Presented By: Anna Liu

  8. Employers need to match or exceed the City’s Ordinances for the following: Prevailing Wages • Sick Leave • Health Care • Worker Compensation •

  9. Required per San Francisco Administrative Code Section 6.22(g) and Chapter 82 • See Section 00 73 30 for details • Applies to both Prime Contractor and ALL Subcontractors • Local Hire Requirement 30% by trade • At least 50% of Apprentice project work hours within each trade shall be • performed by local residents.

  10. QBD  Addendum

  11. ENSUING SITE VISIT AT PIER 29 & 31.5

  12. Questions?

Recommend


More recommend