Background • 16 County Region • Completed Regional Water Demand Forecast • Completed a planning-level evaluation of supply and determined “gap” through year 2060 • Completed a screening analysis of options • Conservation • Groundwater • Importation • New Reservoir • Reallocation
3 Screening Criterion • Supplemental Water Availability • Reliability of Supplemental Source • Cost • Operational Constraints • Permitting & Stakeholder Requirements/Constraints • Environmental, Recreational and Water Quality Impacts • Timeline for Supply Availability
Cu Curr rrent nt Tasks s
Tri ri-St State ate Water er De Dema mand nd Ne Need eds s
What does “reallocation” mean? *Graphic supplied by the USACE Kansas City District
What does “reallocation” mean?
Ove vera rall ll Pr Proce cess ss / Task k Sc Schedule ule
Hydraulic Modeling of Options • Pipe Sizing • Pump Station Sizing • Tank Size and Locations • Water Treatment Plants • Planning Level Cost Estimates
St Stockto kton Lake ke Water er Tra ransm smissio ission Sy System tem
St Stockto kton Lake ke Water er Tra ransm smissio ission Sy System tem
St Stockto kton Lake ke Water er Tra ransm smissio ission Sy System tem
Ta Tabl ble R e Rock ck Lake ke Wa Water er Tr Transm nsmiss issio ion Sy n Syst stem em
Ta Tabl ble R e Rock ck Lake ke Wa Water er Tr Transm nsmiss issio ion Sy n Syst stem em
Ta Tabl ble Ro e Rock ck Lake ke Wa Wate ter r Tr Trans nsmi missi ssion Sy n Syst stem em
Next Steps • Environmental impacts for Stockton Lake Reallocation • Data Collection of existing environmental conditions at Pomme de Terre Lake • Environmental impacts for Pomme de Terre Lake • Continue Reallocation Studies Floodplain Wetlands