N-12 Jake Brunoehler, P.E. – Regional Engineer
AGENDA • Purpose • Product Overview • Project Development • Ideal Treatment Train Questions? •
• Stormw ater Management in Wisconsin – Brief StormTech/ADS Overview – Treatment Train – Summary
Up-Flo Filter
ISOLATOR ROW™ PRE-TREATMENT STORMTECH ISOLATOR ROW MANHOLE WITH OVERFLOW WEIR ECCENTRIC HEADER STORMTECH CHAMBERS OPTIONAL RISER
CONCEPTUAL/FEASIBILITY • Property Values and Taxes • Regional Environmental (Airports, etc) • Permit Requirements & Ow ner Desires • Costs! Up-front and Overall Ow nership
DESIGN • # Modules (SLAMM) • Configuration (Geometry • Peak Event Bypass (TR-55) • Time Table
UPFLO FILTER IN WINSLAMM
Up-Flo Filter GENERAL ARRANGEMENTS
Up-Flo Filter GENERAL ARRANGEMENTS
Up-Flo Filter GENERAL ARRANGEMENTS
STORMTECH IN WINSLAMM (V 10.4)
CHAMBER MODELS
CONSTRUCTION
CONSTRUCTION • Lead Time Pre-Installation Meeting • • Pre-Assembled • Take Out Media During Construction
OPERATION & MAINTENANCE
ISOLATOR ROW™ After Before
THE UNDERGROUND TREATMENT TRAIN
Jake Brunoehler, PE Regional Engineer 262-794-2306 Jake.Brunoehler@ads-pipe.com