MEASURE Q A MEASURE Q ACTIVIT TIVITY OCT OCTOBER BER DECEMBER 20 ECEMBER 2017 Pr Program Ov ogram Over ervie view: $8, $8,185,202 e 85,202 expended this q pended this quar arter Com Comple leted pr d project


  1. MEASURE Q A MEASURE Q ACTIVIT TIVITY OCT OCTOBER – BER – DECEMBER 20 ECEMBER 2017 Pr Program Ov ogram Over ervie view: • $8, $8,185,202 e 85,202 expended this q pended this quar arter • Com Comple leted pr d project close out f oject close out for: r: • Performing Arts Building Renovation • Vacaville Biotechnology & Science Building • Vallejo Autotechnology Building • Vallejo Center (HVAC Upgrade) • Prepared District Standar Prepared District Standards R s Revisions visions • Boar Board appoint d appointed ed ne new CBOC members w CBOC members • CBOC working on FY 15-16 Annual Report

  2. FAIRFIELD INFRASTRUCTURE PROJECTS SUB-STATION REPLA SUB-S ION REPLACEMENT EMENT • Installation and Campus power shutdown over Winter Break • Minor finishing work in progress B-1 B-100 D 00 DATA CENTER CENTER GENERA GENERATOR OR • Contract awarded • Construction in May GAS LINE REPLA S LINE REPLACEMENT EMENT • In progress

  3. SCIENCE BUILDING - PHASE 1 • Undergr Underground utilities com ound utilities comple leted • Ne New switchgear se w switchgear set • Building pad de Building pad developed loped • Construction of foundation and Construction of f undation and under underslab slab utilities in utilities in pr progress ogress • Occupancy Januar Occupancy January 20 y 2019

  4. LIBRARY/LEARNING RESOURCE CENTER • Archit Ar chitect select ect selected ed • Visioning sessions conduct Visioning sessions conducted • Schematic design in Schematic design in pr progress ogress • Sit Site sur survey and and geo geotechnical echnical report com repor comple leted • CEQA Mitigat CEQA Mitigated ed Neg Neg Dec R ec Repor port comple com leted; currently in ed; currently in public public re revie view period period

  5. HORTICULTURE RESTROOM BUILDING Contract a Contract awar arded f ded for modular r modular • building building Sit Sitework bids receiv bids received in ed in • Januar January Com Comple letion targe tion target: Ma : May 20 y 2018 •

  6. SOFTBALL BLEACHER REPLACEMENT • Bleachers and press bo Bleachers and press box x com comple leted • Construction contract a Construction contract awar arded ded for side r sidewalk t lk to restr restroom building oom building • Com Comple letion targe tion target: Mar : March 20 h 2018

  7. FAIRFIELD CAMPUS ENTRY SIDEWALK • Construction in Construction in pr progress ogress • On-cam On-campus side pus sidewalk poured and lk poured and light light poles installe poles installed • Dela Delayed due t ed due to w weather and ather and ot other r requ quiremen ents ts • Com Comple letion targe tion target Mar March 20 h 2018

  8. FAIRFIELD CAMPUS DIRECTORIES • Com Comple leted installat d installation of 4 on of 4 direct director ory map y map signs signs

  9. VACAVILLE CENTER INTERSECTION IMPROVEMENTS PROJECT • Construction nearly comple Construction nearly com leted • Must w Must wait f it for continuous dr r continuous dry and y and warm w rm weath ather t r to com comple lete asphalt asphalt slurr slurry and and road striping ad striping • Com Comple letion targe tion target April 20 April 2018

  10. VACAVILLE CLASSROOM BUILDING (ANNEX) • Contract a Contract awar arded in ded in December December • Demo and Demo and construction in construction in pr progress ogress • Com Comple letion targe on target: July 20 : July 2018 • Occupancy: F Occupancy: Fall semest ll semester er

  11. VACAVILLE CENTER HVAC UPGRADE • Plans approved Plans appr ed by DSA DSA • Issued f Issued for bid r bid in in Januar January • Construction summer Construction summer 20 2018

  12. QUESTIONS?